1020 Discovery Rd - Modern Heating & Air Test Balance ReportILWDJUL LL HEATING & AIR CONDITIONING 2318 First Street N.E. • Minneapolis, NIN 55418 (612) 781-3358 • Fax (612) 781-3428 September 24, 2007 City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 ATTN: HVAC Inspector RE: Prime Therapeutics - 1020 Discovery Road - Permit 4EA078098 Attached is a copy of the test and balance report for the above-mentioned project. Please let me know if you have any questions. Sincerely, MODERN HEATING & AIR CONDITIONING Dustin Project p rp ? SEP 2 5 2007 D) TEST AND BALANCE REPORT PRIME THERAPEUTICS PHASE 1 NEBB CERTIFIED TEST, ADJUST, AND BALANCE REPORT DATE July 30, 2007 PROJECT: Prime Therapeutics D10882 Phase 1 HVAC CONTRACTOR: MODERN HEATtNG & AIR CONDITIONING, INC. 2318 FIRST STREET NE MINNEAPOLIS, MN 55418 PHONE: 612-781-3358 FAX: 612-781-3428 NEBB TAB FIRM: MODERN HEATING & AIR CONDITIONING, INC. 2318 FIRST STREET NE MINNEAPOLIS, MN 55418 PHONE: 612-781-3358 FAX: 612-781-3428 TAB CERTIFICATION NUMBER: 2828 NEBB CERTIFICATION PROJECT: Prime Therapeutics D10882 Phase i THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGN QUANTITIES WHICH EXCEED NEBB TOLERANCES ARE NOTED THROUGHOUT THIS REPORL THE DISTRIQUTIONS SYSTEMS HAVE BEEN TESTED AND BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS. SUBMITTED AND CERTIFIED BY: NEBB TAB FIRM: MODERN HEATING & AIR CONDITIONING, INC. TAB SUPERVISOR: ANDY GRAHAM, P.E. REG. ND.: 2828 CERTIFICATION EXPIRATION DATE: 12/31I2007 DATE July 30, 2007 NEBB CERTIFICATION SEAL r \ N? i N ? ? ANbREW GRAHAM CEFTIFICATION 2828 ? Exp.72/31/07 . AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 1 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 3 Ton 91 % 159 1 La -In 8 200 147 151 159 2 La -In 8 200 186 191 159 3 La -In 8 200 178 183 159 4 La -In 8 200 183 207 159 5 La -In 8 200 221 177 159 6 La -In 8 200 214 183 REMARKS: Design 1200 Final 1092 TEST DATE July, 2007 READINGS BY Tom Weaver ANDREW GRAHAM CERTIFICATION 2828 , Exp.12l31107 , Page AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 D10882 SYSTEM RTU # 2 TEST APPARATUS Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO, TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 6.5 Ton 99% 159 1 La -In 10 350 271 325 159 2 La -In 10 350 298 370 159 3 La -In 10 350 270 315 157 4 La -In 8 225 246 235 161 5 La -In 8 150 180 165 161 6 La -In 8 150 172 175 163 7 La -In 8 200 156 187 163 8 La -In 8 200 133 178 REMARKS: Design 1975 Final 1950 TEST DATE READINGS BY July, 2007 Tom Weaver RNnaev?IcRAHara cEt'1r19car3arv 2e2a . EXP. 1231I07 , Page AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTIJ # 3 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINAR FIMAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 6 Ton 92% 160 1 La -In 10 220 228 160 2 La -In 10 220 256 160 3 La -In 10 220 264 160 4 La -In 8 220 161 160 5 La -In 10 220 233 160 6 La -in 10 220 254 160 7 La -In 10 220 248 160 8 La -In 8 220 106 160 9 La -In 8 220 135 160 12 La Lay-In 8 210 149 160 1 La -In 8 210 170 REMARKS: Design 2400 Final 2204 TEST DATE READINGS BY Jufy, 2007 Tom Weaver ?„,??A'ir Co.. pa, ( ANOREVV GRHHAM CERTiFlCR7!0N 2825 ? E;:p. 12/; 5/07 , Page AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 5 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED N0. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 4 Ton 84% 157 1 La -In 10 275 220 157 2 La -In 10 275 239 157 3 La -In 10 275 215 157 4 La -In 1D 275 257 157 5 La -In 10 275 251 157 6 La -In 10 225 172 REMARKS: Design 1600 Final 1354 TEST DATE July, 2007 READINGS BY Tom Weaver ANDREW GRAHAM CERTIFICATION 2828 ? Exp.12Y31/67 , Page AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 6 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 15 Ton 100% 157 1 La -In 10 300 372 310 157 2 La -In 10 300 418 340 157 3 La -In 10 300 382 320 157 4 La -In 10 300 524 316 157 5 La -In 10 300 437 307 157 6 La -In 10 300 384 323 157 7 La -In 10 300 341 295 157 8 La -In 10 300 318 276 153 9 La -in 8 225 45 218 152 10 La -In 8 225 274 246 Hall 11 La -In S 200 351 290 147 12 La -In 8 240 173 276 147 13 La -In 8 240 289 255 147 14 La -In 8 240 324 270 147 15 La -In 8 240 232 188 Hall 16 La -In 8 200 169 204 150 17 La -In 8 180 274 227 150 18 La -In 8 180 271 221 REMARKS: Design 4570 Final 4882 TEST DATE READINGS BY July, 2007 Tom Weaver 7 C _? ??E ?? AP.DREW ^vRAH.SiW ' CERT;FICh1'!0tq 2$?_3 _ e,:p.7a_/3vo7 ? Page 5 AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 7 TEST APPARATUS D10882 Fiow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO. TYPE SI2E AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 3 Ton 100% 102 1 La -In 10 270 195 278 102 2 La -In 10 270 211 285 158 3 La -In 10 220 145 223 158 4 La -In 10 220 166 244 158 5 La -In 10 220 150 213 REMARKS: Design 1200 Final 1243 TEST DATE READINGS BY July, 2007 Tom Weaver ? 9R Page ANOREW GRAHAM CERTfFICATVQN 2828 , Ezp.12/31107 AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 D10882 SYSTEM RTU # 8 TEST APPARATUS Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCEN7 AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 5 Ton 80°/a 110 1 La -In 8 240 109 192 109 2 La -In 6 50 60 95 108 3 La -In 8 240 123 209 106 4 La -In B 200 116 199 Hall 5 La -In 8 150 130 106 104 6 La -In 8 200 91 160 103 7 La -In 8 200 89 157 158 8 La -In 8 240 93 166 158 9 La -In 8 240 89 155 158 10 La -In 8 240 100 175 REMARKS: Design 2000 Final 1614 TEST DATE July, 2007 READINGS BY Tom Weaver ANOREW GFiAHAM CERTIFICATION 2828 , Exp.12/31/07 , Page AIR Ol1TLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 D10882 SYSTEM RTU # 10 TEST APPARATUS Flow Hood OUTLET DESIGN PRELIMINAR FINAL PERCENT AREA SERVED NO. TYPE SI2E AIRFLOW CFM AIRFLOW CFM AIRFCOW CFM OF DESIGN 5 Ton $5% Perimeter 1 La -In 10 310 166 201 Perimeter 2 La -In 10 310 222 266 Perimeter 3 La -In 10 310 230 277 Perimeter 4 La -In 10 320 224 268 100 5 La -In 6 100 70 80 101 6 La -In 8 150 140 140 101 7 Slot 8 175 139 168 101 8 Slot 8 175 142 170 107 9 La -In S 150 150 130 REMARKS: Design 2000 Final 1700 TEST DATE July, 2007 READINGS BY Tom Weaver O? G i? g, Air Co? 46B ANDREW GRAHAM CER7IFICATION 2828 , Exp.12l39/07 Page 8 AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 D10882 SYSTEM RTU # 13 TEST APPARATUS Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 3 Ton 100% 129 1 La -In 8 130 160 121 129 2 La -In 6 100 170 105 130 3 La -In 8 120 187 126 131 4 La -In 8 170 138 185 132 5 La -In 8 135 133 138 133 6 La -In 8 135 135 127 134 7 Lay-In 8 150 31 151 135 8 La -In 8 130 250 750 135 9 La -In 8 130 83 140 REMARKS: Design 1200 Finaf 1243 TEST DATE July, 2007 READINGS BY Tom Weaver ???SiB a kN?'JrlcW GRAHAfO CERTIFICkTION zsza • ? Exp.92/39/07 . Page 9 .' w ? AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 14 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 8.5 Ton 81 % 127 1 La -In 10 325 317 246 127 2 La -In 10 325 308 252 127 3 La -In 10 325 287 243 127 4 La -In 10 325 265 298 127 5 La -in 10 325 236 268 127 6 La -In 10 325 269 298 127 7 La -In 10 325 250 287 127 8 La -In 10 325 200 240 125 9 La -In 8 150 170 127 126 10 Lay-In 8 150 200 125 124 11 La -In 8 200 290 151 135 12 La -In 10 300 0 240 REMARKS: Design 3400 Final 2769 TEST DATE READINGS BY July, 2007 Tom Weaver ; ANDR:W GRANADh CERTI-ICAT!CW 2$L8 e. Er,p.5213?/07 Page 10 AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 15 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINAR FINAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 4 Ton 83% 120 1 La -In 8 240 197 200 127 2 La -In 10 250 177 220 127 3 La -In 10 250 166 209 127 4 La -In 10 250 150 188 127 5 Lay-In 10 250 121 210 127 6 La -In 10 250 128 205 118 7 La -In 8 110 149 96 REMARKS: Design 1600 Final 1328 TEST DATE READINGS BY July, 2007 Tom Weaver / ' Fp,??1 ANDREVV GRAHAtA GERT!FICRT10l 2826 , Exp.t2J3?/v7 Page 11 AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 16 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINAR FINAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 10 Ton gg% 117 1 La -In 10 290 221 286 117 2 La -In 10 290 225 283 117 3 La -In 10 290 176 222 117 4 La -In 10 290 247 302 117 5 La -in 10 290 237 290 117 6 La -In 10 290 225 290 117 7 La -In 10 290 159 222 117 8 La -In 10 290 232 310 117 9 La -In 10 290 200 285 117 10 La -In 10 290 221 300 117 11 La -In 10 290 227 296 119 12 La -In 8 150 149 151 120 13 Lay-In 8 150 123 150 121 14 La -In 8 210 268 206 122 15 La -In 8 150 141 155 122 16 La -In 8 150 156 173 REMARKS: Design 4000 Final 3921 TEST DATE July, 2007 ".. Ra A;r tz„ ` READINGS BY Tom Weaver ? NWEEt?BB ? ANDRcNi uitAH.'tM CERTIFICkTICN 2?28 , Er.p.52/37lD7 Page 12 AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 17 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINAR FINAL PERCEN AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 4 Ton gq% 117 1 La -In 8 240 185 117 2 La -In 8 240 190 117 3 La -In 8 240 190 117 4 La -In 8 240 199 112 5 La -In 8 215 185 112 6 La -In 8 215 208 112 7 La -In 8 210 183 REMARKS: Design 1600 Final 1340 TEST DATE READINGS BY July, 2007 Tom Weaver kNDREW G^nAH.4M CER°+ IFICAT!QN 2828 6 EYp.S2%3}IO7 ? Page 13 AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 18 TEST APPARATU5 D1D882 Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO. TYPE S12E AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 5 Ton g2a/o 112 1 La -In 8 222 224 199 112 2 La -In 8 222 208 188 112 M 3 La -In 8 222 180 191 112 4 Lay-In 8 222 976 191 112 5 La -In 8 222 168 190 112 6 La -In 8 222 174 180 112 7 La -In 8 222 155 178 112 8 La -In 8 222 140 168 112 9 La -In 10 222 227 152 REMARKS: Design 1998 Final 1637 TEST DATE READINGS BY July, 2007 Tom Weaver f s ?-,`? \ ?F E ? ?? Page 14 ANDr`;EW G^nAHf,IA CcRTIFI.ATt'Ji'S <828 Er,o.f21^ut/07 AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 19 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 4 Ton 82% 115 1 La -In 8 220 177 188 112 2 La -In 8 240 172 187 112 3 La -In 8 240 171 192 112 4 La -In S 240 185 196 114 5 La -In 8 220 199 198 116 6 La -In 8 220 177 178 116 7 La -In 8 220 178 176 REMARKS: Design 1600 Final 1315 TEST DATE READINGS BY July, 2007 Tom Weaver /„ & R.ir r' f r,? ?-? N ?v?':??, ?r-8 1-3 aNaRev<<cRAHnM CERTiF;CqTION 2328 _ EY.P. 12!35iW . Page 15 AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics - Phase 1 SYSTEM RTU # 20 TEST APPARATUS D10882 Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 3 Ton 100% 112 1 La -In 8 190 222 112 2 La -In 8 190 240 112 3 La -In 8 190 112 4 La -In 8 190 113 5 La -In 8 220 113 6 La -In g 220 t22 REMARKS: D esign 1200 Final 1379 TEST DATE READINGS BY July, 2007 Tom Weaver ` „P. Aicr_ % ?- ??'?? ANDREVi GRnHAM CcRTIFiCACIOfd 21325 .? Exp.12l,i/07 . Page 16 4 TEST AND BALANCE REPORT PRIME THERAPEUTICS PHASE-2 NEBB CERTIFIED TEST, ADJUST, AND BALANCE REPORT DATE September 4, 2007 PROJECT: Prime Therapeutics Phase - 2 D10882 HVAC CONTRACTOR: MODERN HEATING & AIR CONDITIONING, INC. 2318 FIRST STREET NE MINNEAPOLIS, MN 55418 PHONE: 612-781-3358 FAX:612-781-3428 NEBB TQB EIRNl: MODERN HEATIIJG & AIR CONDfTIONING, INC. 2318 FIRST STREET NE MINNEAPOLIS, MN 55416 PHONE: 612-781-3358 FAX: 612-781-3428 TAB CERTiFICATION NUMBER: 2828 NEBB CERTIFICATION PROJECT: Prime Therapeutics Phase - 2 D10882 THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGN QUANTITIES WHICH EXCEED NEBB TOLERANCES ARE NOTED THROUGHOUT THIS REPORT. THE DISTRIBUTIONS SYSTEMS HAVE BEEN TESTED AND BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NE86 "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS" AND TFiE PROJECT SPECIFICATIONS. SUBNIITTED AND CERTIFIED BY: NEBB TAB FIRM: MODERN HEATING & AIR CONDITIONING, INC. TAB SUPERVt50R: ANDY GRAHAM, P.E. REG. NO.: 2828 CERTIFICATION E%PIRATION DATE: 12/31/2007 DATE September 4, 2007 NEBB CERTIFICATION SERL ?•?'`? ? ? F,NDRE1iJ GFANF.M CcRTIFI---kTlON :'i .'...?j C;:^ .2/31/07 AIR OUTLET TEST REPaRT (Flow Hood) PROJECT Prime Therapeutics Phase - 2 D10882 SYSTEM RTU-4 TEST APPARATUS 5 Ton Flow Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT AREA SERVED NO. TYPE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN 162 1 La -In 10 275 327 239 162 2 La -In 10 275 279 225 162 3 Lay-In 10 290 290 230 162 4 La -In 10 290 174 241 162 5 Lay-In 10 290 208 221 156 6 La -In 10 290 235 255 156 7 La -in 10 290 195 225 REMARKS: Design 2000 Final 1636 TEST DATE • September 2007 READiNGS BY Tom Weaver 82% of Design ? ?? r « ? t,?:pr:e'?? u?,?t;FnA „_. ,-?=ia??7NG\1 ??ry Page AIR OUTLET TEST REPORT (Flow Hood) PROJECT Prime Therapeutics Phase - 2 D10882 SYSTEM RTU-11 TEST APPARATUS 6 Ton Flaw Hood OUTLET DESIGN PRELIMINARY FINAL PERCENT kREASERVED NO. PE SIZE AIRFLOW CFM AIRFLOW CFM AIRFLOW CFM OF DESIGN Trainin Room 1 10 200 235 Trainin Room 2 k 10 200 197 Trainin Room 3 10 200 187 Trainin Room 4 10 200 180 Storage 5 8 100 107 149 6 Lay-In 10 280 158 149 7 Lay-In 10 280 185 151 8 Lay-In 10 245 16$ 151 9 La -In 10 245 154 Men 10 Lay-In 8 175 183 Women 11 Lay-In B 175 178 145 12 Lay-In 6 100 5$ REMARKS: Design 2400 Final 1990 TE3T DAFE September 2007 REkDtNGS BY Tom Weaver 83% of Design ?. ? ,.. ?? ? ? S Page