1020 Discovery Rd - Modern Heating & Air Test Balance ReportILWDJUL LL
HEATING & AIR CONDITIONING
2318 First Street N.E. • Minneapolis, NIN 55418
(612) 781-3358 • Fax (612) 781-3428
September 24, 2007
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122
ATTN: HVAC Inspector
RE: Prime Therapeutics - 1020 Discovery Road - Permit 4EA078098
Attached is a copy of the test and balance report for the above-mentioned project. Please let me
know if you have any questions.
Sincerely,
MODERN HEATING & AIR CONDITIONING
Dustin
Project
p rp
? SEP 2 5 2007 D)
TEST AND BALANCE REPORT
PRIME THERAPEUTICS
PHASE 1
NEBB CERTIFIED TEST, ADJUST, AND
BALANCE REPORT
DATE July 30, 2007
PROJECT: Prime Therapeutics D10882
Phase 1
HVAC CONTRACTOR: MODERN HEATtNG & AIR CONDITIONING, INC.
2318 FIRST STREET NE
MINNEAPOLIS, MN 55418
PHONE: 612-781-3358
FAX: 612-781-3428
NEBB TAB FIRM: MODERN HEATING & AIR CONDITIONING, INC.
2318 FIRST STREET NE
MINNEAPOLIS, MN 55418
PHONE: 612-781-3358
FAX: 612-781-3428
TAB CERTIFICATION NUMBER: 2828
NEBB CERTIFICATION
PROJECT: Prime Therapeutics D10882
Phase i
THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE
AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY
VARIANCES FROM DESIGN QUANTITIES WHICH EXCEED NEBB TOLERANCES ARE NOTED
THROUGHOUT THIS REPORL
THE DISTRIQUTIONS SYSTEMS HAVE BEEN TESTED AND BALANCED AND FINAL
ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL
STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS"
AND THE PROJECT SPECIFICATIONS.
SUBMITTED AND CERTIFIED BY:
NEBB TAB FIRM: MODERN HEATING & AIR CONDITIONING, INC.
TAB SUPERVISOR: ANDY GRAHAM, P.E.
REG. ND.: 2828
CERTIFICATION EXPIRATION DATE: 12/31I2007
DATE July 30, 2007
NEBB CERTIFICATION SEAL r \
N?
i
N
?
?
ANbREW GRAHAM
CEFTIFICATION
2828
? Exp.72/31/07 .
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 1 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
3 Ton 91 %
159 1 La -In 8 200 147 151
159 2 La -In 8 200 186 191
159 3 La -In 8 200 178 183
159 4 La -In 8 200 183 207
159 5 La -In 8 200 221 177
159 6 La -In 8 200 214 183
REMARKS: Design 1200
Final 1092
TEST DATE July, 2007
READINGS BY Tom Weaver
ANDREW GRAHAM
CERTIFICATION
2828
, Exp.12l31107 ,
Page
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1 D10882
SYSTEM RTU # 2 TEST APPARATUS Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO,
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
6.5 Ton 99%
159 1 La -In 10 350 271 325
159 2 La -In 10 350 298 370
159 3 La -In 10 350 270 315
157 4 La -In 8 225 246 235
161 5 La -In 8 150 180 165
161 6 La -In 8 150 172 175
163 7 La -In 8 200 156 187
163 8 La -In 8 200 133 178
REMARKS: Design 1975
Final 1950
TEST DATE
READINGS BY
July, 2007
Tom Weaver
RNnaev?IcRAHara
cEt'1r19car3arv
2e2a
. EXP. 1231I07
,
Page
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTIJ # 3 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINAR FIMAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
6 Ton 92%
160 1 La -In 10 220 228
160 2 La -In 10 220 256
160 3 La -In 10 220 264
160 4 La -In 8 220 161
160 5 La -In 10 220 233
160 6 La -in 10 220 254
160 7 La -In 10 220 248
160 8 La -In 8 220 106
160 9 La -In 8 220 135
160
12 La Lay-In 8 210 149
160 1 La -In 8 210 170
REMARKS: Design 2400
Final 2204
TEST DATE
READINGS BY
Jufy, 2007
Tom Weaver ?„,??A'ir Co..
pa, (
ANOREVV GRHHAM
CERTiFlCR7!0N
2825
? E;:p. 12/; 5/07 ,
Page
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 5 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
N0.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
4 Ton 84%
157 1 La -In 10 275 220
157 2 La -In 10 275 239
157 3 La -In 10 275 215
157 4 La -In 1D 275 257
157 5 La -In 10 275 251
157 6 La -In 10 225 172
REMARKS: Design 1600
Final 1354
TEST DATE July, 2007
READINGS BY Tom Weaver
ANDREW GRAHAM
CERTIFICATION
2828
? Exp.12Y31/67 ,
Page
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 6 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
15 Ton 100%
157 1 La -In 10 300 372 310
157 2 La -In 10 300 418 340
157 3 La -In 10 300 382 320
157 4 La -In 10 300 524 316
157 5 La -In 10 300 437 307
157 6 La -In 10 300 384 323
157 7 La -In 10 300 341 295
157 8 La -In 10 300 318 276
153 9 La -in 8 225 45 218
152 10 La -In 8 225 274 246
Hall 11 La -In S 200 351 290
147 12 La -In 8 240 173 276
147 13 La -In 8 240 289 255
147 14 La -In 8 240 324 270
147 15 La -In 8 240 232 188
Hall 16 La -In 8 200 169 204
150 17 La -In 8 180 274 227
150 18 La -In 8 180 271 221
REMARKS: Design 4570
Final 4882
TEST DATE
READINGS BY
July, 2007
Tom Weaver
7 C _?
??E ??
AP.DREW ^vRAH.SiW '
CERT;FICh1'!0tq
2$?_3
_ e,:p.7a_/3vo7 ?
Page 5
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 7 TEST APPARATUS
D10882
Fiow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO.
TYPE
SI2E AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
3 Ton 100%
102 1 La -In 10 270 195 278
102 2 La -In 10 270 211 285
158 3 La -In 10 220 145 223
158 4 La -In 10 220 166 244
158 5 La -In 10 220 150 213
REMARKS: Design 1200
Final 1243
TEST DATE
READINGS BY
July, 2007
Tom Weaver
?
9R
Page
ANOREW GRAHAM
CERTfFICATVQN
2828
, Ezp.12/31107
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1 D10882
SYSTEM RTU # 8 TEST APPARATUS Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCEN7
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
5 Ton 80°/a
110 1 La -In 8 240 109 192
109 2 La -In 6 50 60 95
108 3 La -In 8 240 123 209
106 4 La -In B 200 116 199
Hall 5 La -In 8 150 130 106
104 6 La -In 8 200 91 160
103 7 La -In 8 200 89 157
158 8 La -In 8 240 93 166
158 9 La -In 8 240 89 155
158 10 La -In 8 240 100 175
REMARKS: Design 2000
Final 1614
TEST DATE July, 2007
READINGS BY Tom Weaver
ANOREW GFiAHAM
CERTIFICATION
2828
, Exp.12/31/07 ,
Page
AIR Ol1TLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1 D10882
SYSTEM RTU # 10 TEST APPARATUS Flow Hood
OUTLET DESIGN PRELIMINAR FINAL PERCENT
AREA SERVED
NO.
TYPE
SI2E AIRFLOW
CFM AIRFLOW
CFM AIRFCOW
CFM OF
DESIGN
5 Ton $5%
Perimeter 1 La -In 10 310 166 201
Perimeter 2 La -In 10 310 222 266
Perimeter 3 La -In 10 310 230 277
Perimeter 4 La -In 10 320 224 268
100 5 La -In 6 100 70 80
101 6 La -In 8 150 140 140
101 7 Slot 8 175 139 168
101 8 Slot 8 175 142 170
107 9 La -In S 150 150 130
REMARKS: Design 2000
Final 1700
TEST DATE July, 2007
READINGS BY Tom Weaver
O?
G
i? g, Air Co?
46B
ANDREW GRAHAM
CER7IFICATION
2828
, Exp.12l39/07
Page 8
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1 D10882
SYSTEM RTU # 13 TEST APPARATUS Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
3 Ton 100%
129 1 La -In 8 130 160 121
129 2 La -In 6 100 170 105
130 3 La -In 8 120 187 126
131 4 La -In 8 170 138 185
132 5 La -In 8 135 133 138
133 6 La -In 8 135 135 127
134 7 Lay-In 8 150 31 151
135 8 La -In 8 130 250 750
135 9 La -In 8 130 83 140
REMARKS: Design 1200
Finaf 1243
TEST DATE July, 2007
READINGS BY Tom Weaver
???SiB a
kN?'JrlcW GRAHAfO
CERTIFICkTION
zsza •
? Exp.92/39/07 .
Page 9
.' w
?
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 14 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
8.5 Ton 81 %
127 1 La -In 10 325 317 246
127 2 La -In 10 325 308 252
127 3 La -In 10 325 287 243
127 4 La -In 10 325 265 298
127 5 La -in 10 325 236 268
127 6 La -In 10 325 269 298
127 7 La -In 10 325 250 287
127 8 La -In 10 325 200 240
125 9 La -In 8 150 170 127
126 10 Lay-In 8 150 200 125
124 11 La -In 8 200 290 151
135 12 La -In 10 300 0 240
REMARKS: Design 3400
Final 2769
TEST DATE
READINGS BY
July, 2007
Tom Weaver
;
ANDR:W GRANADh
CERTI-ICAT!CW
2$L8
e. Er,p.5213?/07
Page 10
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 15 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINAR FINAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
4 Ton 83%
120 1 La -In 8 240 197 200
127 2 La -In 10 250 177 220
127 3 La -In 10 250 166 209
127 4 La -In 10 250 150 188
127 5 Lay-In 10 250 121 210
127 6 La -In 10 250 128 205
118 7 La -In 8 110 149 96
REMARKS: Design 1600
Final 1328
TEST DATE
READINGS BY
July, 2007
Tom Weaver
/ '
Fp,??1
ANDREVV GRAHAtA
GERT!FICRT10l
2826
, Exp.t2J3?/v7
Page 11
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 16 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINAR FINAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
10 Ton gg%
117 1 La -In 10 290 221 286
117 2 La -In 10 290 225 283
117 3 La -In 10 290 176 222
117 4 La -In 10 290 247 302
117 5 La -in 10 290 237 290
117 6 La -In 10 290 225 290
117 7 La -In 10 290 159 222
117 8 La -In 10 290 232 310
117 9 La -In 10 290 200 285
117 10 La -In 10 290 221 300
117 11 La -In 10 290 227 296
119 12 La -In 8 150 149 151
120 13 Lay-In 8 150 123 150
121 14 La -In 8 210 268 206
122 15 La -In 8 150 141 155
122 16 La -In 8 150 156 173
REMARKS: Design 4000
Final 3921
TEST DATE July, 2007
".. Ra A;r tz„ `
READINGS BY Tom Weaver
? NWEEt?BB
?
ANDRcNi uitAH.'tM
CERTIFICkTICN
2?28
, Er.p.52/37lD7
Page 12
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 17 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINAR FINAL PERCEN
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
4 Ton gq%
117 1 La -In 8 240 185
117 2 La -In 8 240 190
117 3 La -In 8 240 190
117 4 La -In 8 240 199
112 5 La -In 8 215 185
112 6 La -In 8 215 208
112 7 La -In 8 210 183
REMARKS: Design 1600
Final 1340
TEST DATE
READINGS BY
July, 2007
Tom Weaver
kNDREW G^nAH.4M
CER°+ IFICAT!QN
2828
6 EYp.S2%3}IO7 ?
Page 13
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 18 TEST APPARATU5
D1D882
Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO.
TYPE
S12E AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
5 Ton g2a/o
112 1 La -In 8 222 224 199
112 2 La -In 8 222 208 188
112
M 3 La -In 8 222 180 191
112 4 Lay-In 8 222 976 191
112 5 La -In 8 222 168 190
112 6 La -In 8 222 174 180
112 7 La -In 8 222 155 178
112 8 La -In 8 222 140 168
112 9 La -In 10 222 227 152
REMARKS: Design 1998
Final 1637
TEST DATE
READINGS BY
July, 2007
Tom Weaver
f s ?-,`? \
?F E
?
??
Page 14
ANDr`;EW G^nAHf,IA
CcRTIFI.ATt'Ji'S
<828
Er,o.f21^ut/07
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 19 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
4 Ton 82%
115 1 La -In 8 220 177 188
112 2 La -In 8 240 172 187
112 3 La -In 8 240 171 192
112 4 La -In S 240 185 196
114 5 La -In 8 220 199 198
116 6 La -In 8 220 177 178
116 7 La -In 8 220 178 176
REMARKS: Design 1600
Final 1315
TEST DATE
READINGS BY
July, 2007
Tom Weaver /„ & R.ir r'
f r,? ?-? N
?v?':??, ?r-8 1-3
aNaRev<<cRAHnM
CERTiF;CqTION
2328
_ EY.P. 12!35iW .
Page 15
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics - Phase 1
SYSTEM RTU # 20 TEST APPARATUS
D10882
Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
3 Ton 100%
112 1 La -In 8 190 222
112 2 La -In 8 190 240
112 3 La -In 8 190
112 4 La -In 8 190
113 5 La -In 8 220
113 6 La -In g 220 t22
REMARKS: D
esign 1200
Final 1379
TEST DATE
READINGS BY
July, 2007
Tom Weaver `
„P. Aicr_
% ?-
??'??
ANDREVi GRnHAM
CcRTIFiCACIOfd
21325
.? Exp.12l,i/07
.
Page 16
4
TEST AND BALANCE REPORT
PRIME THERAPEUTICS
PHASE-2
NEBB CERTIFIED TEST, ADJUST, AND
BALANCE REPORT
DATE September 4, 2007
PROJECT: Prime Therapeutics Phase - 2 D10882
HVAC CONTRACTOR: MODERN HEATING & AIR CONDITIONING, INC.
2318 FIRST STREET NE
MINNEAPOLIS, MN 55418
PHONE: 612-781-3358
FAX:612-781-3428
NEBB TQB EIRNl: MODERN HEATIIJG & AIR CONDfTIONING, INC.
2318 FIRST STREET NE
MINNEAPOLIS, MN 55416
PHONE: 612-781-3358
FAX: 612-781-3428
TAB CERTiFICATION NUMBER: 2828
NEBB CERTIFICATION
PROJECT: Prime Therapeutics Phase - 2 D10882
THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE
AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY
VARIANCES FROM DESIGN QUANTITIES WHICH EXCEED NEBB TOLERANCES ARE NOTED
THROUGHOUT THIS REPORT.
THE DISTRIBUTIONS SYSTEMS HAVE BEEN TESTED AND BALANCED AND FINAL
ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NE86 "PROCEDURAL
STANDARDS FOR TESTING, ADJUSTING, BALANCING OF ENVIRONMENTAL SYSTEMS"
AND TFiE PROJECT SPECIFICATIONS.
SUBNIITTED AND CERTIFIED BY:
NEBB TAB FIRM: MODERN HEATING & AIR CONDITIONING, INC.
TAB SUPERVt50R: ANDY GRAHAM, P.E.
REG. NO.: 2828
CERTIFICATION E%PIRATION DATE: 12/31/2007
DATE September 4, 2007
NEBB CERTIFICATION SERL
?•?'`? ?
?
F,NDRE1iJ GFANF.M
CcRTIFI---kTlON
:'i .'...?j
C;:^ .2/31/07
AIR OUTLET TEST REPaRT
(Flow Hood)
PROJECT Prime Therapeutics Phase - 2 D10882
SYSTEM RTU-4 TEST APPARATUS
5 Ton
Flow Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
AREA SERVED
NO.
TYPE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
162 1 La -In 10 275 327 239
162 2 La -In 10 275 279 225
162 3 Lay-In 10 290 290 230
162 4 La -In 10 290 174 241
162 5 Lay-In 10 290 208 221
156 6 La -In 10 290 235 255
156 7 La -in 10 290 195 225
REMARKS: Design 2000
Final 1636
TEST DATE • September 2007
READiNGS BY Tom Weaver
82% of Design
?
?? r «
?
t,?:pr:e'?? u?,?t;FnA
„_. ,-?=ia??7NG\1
??ry
Page
AIR OUTLET TEST REPORT
(Flow Hood)
PROJECT Prime Therapeutics Phase - 2 D10882
SYSTEM RTU-11 TEST APPARATUS
6 Ton
Flaw Hood
OUTLET DESIGN PRELIMINARY FINAL PERCENT
kREASERVED
NO.
PE
SIZE AIRFLOW
CFM AIRFLOW
CFM AIRFLOW
CFM OF
DESIGN
Trainin Room 1 10 200 235
Trainin Room 2 k 10 200 197
Trainin Room 3 10 200 187
Trainin Room 4 10 200 180
Storage 5 8 100 107
149 6 Lay-In 10 280 158
149 7 Lay-In 10 280 185
151 8 Lay-In 10 245 16$
151 9 La -In 10 245 154
Men 10 Lay-In 8 175 183
Women 11 Lay-In B 175 178
145 12 Lay-In 6 100 5$
REMARKS: Design 2400
Final 1990
TE3T DAFE September 2007
REkDtNGS BY Tom Weaver
83% of Design
?. ?
,..
?? ?
?
S
Page