02/04/1982 - Advisory Parks & Recreation CommissionADVISORY PARKS F RECREATION COMMITTEE
REGULAR MEETING
EAGAN, MINNESOTA
CITY HALL
FEBRUARY 4, 1982
7:00 P.M.
1. CALL MEETING TO ORDER AND PLEDGE OF ALLEGIANCE
2. ADOPT AGENDA AND APPROVAL OF MINUTES OF DECEMBER 10, 1981
3. COMMITTEE ORGANIZATION
4. DEVELOPMENT PROPOSALS
5. OLD BUSINESS
6. NEW BUSINESS
8. ADJOURNMENT
AGENDA
a) Election of chair - person
b) Election of vice chairperson
c) Secretary
d) Meeting day - time
e) Committee appointments
a) Mid - Continent Builders
b) Developers Construction
a) James Plantenberg - Request for easement - Oak Chase Park
b) Matching Gifts Policy
c) Parks Master Guide Plan
a) Shade Tree Program
b) Budget Reductions
7. OTHER BUSINESS /REPORTS
a) 1982 Advisory Committee Objectives
b) Spring - Summer Programs
c) Park Names - Update
d) Report on Skating Rinks
e) Report: Boat Launch Facility
MEMO TO: ADVISORY PARKS & RECREATION COMMITTEE
FROM: KEN VRAA, DIRECTOR OF PARKS & RECREATION
RE: FEBRUARY 4, ADVISORY MEETING
February 1, 1982
The regular committee meeting will be held on Thursday, February 4,
7:00 P.M. in the Eagan City Hall as scheduled.
At the City Council meeting of Tuesday, January 19th, Mr. Carroll and
Mr. Schumaker were reappointed to the Advisory Committee. In addition,
Mr. Tom Gustafson was appointed to fill the vacancy created by Mike
Thomas who had chosen not to seek re- appointment. All terms are for
three years.
On the agenda for consideration is the organization of the Advisory
Committee for the coming year. Selection of a chair - person, vice
chair - person, and secretary is required. In addition, the regular
monthly meeting day and time and as well as appointments to any stand-
ing committee is in order for consideration.
Staff will present two development proposals (material enclosed) for
the Advisory Committee. Mid- Continent Builders are proposing a develop-
ment which consists of approximately 192 dwelling units, which is located
within park service section #9. The second development is from
Developers Construction, Inc. for Hilltop condominiums. Committee
members may recall that the park dedication within this plat was for the
construction of pedestrian /bicycle trails, which has partially been ful-
filled by the developer. Consideration in this preliminary plat will be,
therefore, the location of the trail south from Berry Ridge Road to
County Road 30.
First under Old Business will be the reconsideration of the request from
James Plantenberg for an easement at Oak Chase Park. As committee members
will recall, the direction of the Advisory Committee was to have Mr.
Plantenberg review with Dakota Electric the cost and feasibility of moving
electrical service boxes to align the necessary turning radius into his
property or an easement from Mr. Arnold Carlson. Mr. Carlson has contacted
this office on Mr. Plantenberg's behalf and has indicated that from
conversations with Dakota Electric, it would cost between $3,000 and $5,000
dollars for relocation of the electric box. Mr. Plantenberg and Mr. Carlson
will be present at the committee meeting to again present their request for
the roadway easement across parks property. I've asked Mr. Carlson to pre-
sent as clearly as possible the alignment of the requested road easement.
At the December Advisory Committee meeting it was determined that the policy
on matching gifts should be included on the next agenda for committee review/
action. Enclosed in the packet are copies of the material previously sub-
mitted to the committee for your review.
A brief update on the status of the Master Plan study will be presented
next on the agenda. Staff has made a determination on which firms are to
submit materials. Letter to the firms have gone out on Monday February 1.
•
•
•
February 4, Advisory Meeting - Memo
Page 2
New Business: Committee member Carroll requested that the topic of the
Shade Tree Program be placed on the agenda for discussion. As you may
know, recent action by the State Legislature has virtually eliminated
funding for this program. Previously, the Department of Parks and
Recreation has received reimbursement for its Shade Tree Program and
Reforestation. However, as a result of the recent legislation such
reimbursement will not now be available.
As members are aware, the State Aid payments to Cities, and Eagan, have
been reduced for the current fiscal year. As a result, the City will
be required to trim its budget. The director has met with the department
staff to review which cuts would have the least amount of impact to the
departments current operation; or would minimize the impact on long term
objectives. The area currently being looked at will be reviewed with the
Advisory Committee. It is anticipated that the Council will review these
reductions sometime in mid - March.
Under Other Business: Chairman Martin has requested that the Advisory
Committee consider the need to develop objectives for 1982. Staff will
report on spring and summer programs that are currently being planned/
developed for programming, an update on park names. (see enclosed material)
A report on the 1981 -82 skating season, and finally, a report on the
meeting the Director of Parks and Recreation has had with the Department
of Natural Resources, the Lower Mississippi Watershed District, and the
U.S. Fish and Wildlife Service concerning a potential boat launch facility
beneath the new Cedar Avenue pedestrian bridge.
As always, if you have any questions please feel free to contact the office.
If you are unable to attend, a phone call to the office would be appreciated.
•
•
ZONING AND LAND USE:
COMMENTS
CITY OF EAGAN
SUBJECT: PRELIMINARY PLAT - HILLTOP CONDOMINIUMS
APPLICANT: DEVELOPERS CONSTRUCTION INC
LOCATION: SW4 OF THE 9,14 OF SECTION 22
EXISTING ZONING: R -3 (RESIDENTIAL TOWNHOUSE)
DATE OF PUBLIC HEARING: JANUARY 26, 1982
DATE OF REPORT : JANUARY 18, 1982
REPORTED BY: DAVE OSBERG, PLANNING ASSISTANT
APPLICATION SUBMI'ri1D: The first application submitted is for preliminary plat
approval of Hilltop Condominiums which consists of approximately 10.23 acres and
contains 52 dwelling units.
Presently the parcel is zoned R -3 (Residential Townhouse District). The land
use guide designates this parcel as R -1. However, the Hilltop Estates final plat
was approved with the understanding that this parcel would have R -3 zoning.
The applicant is proposing to develop the parcel with four townhouses and three
coach homes. All four of the townhouses and two of the coach hares will have
eight dwellings per building and one of the coach hares will have four dwelling
units. As stated earlier, the total number of dwelling units on the 10.23 acre
parcel will be 52. The R -3 zoning of the parcel allows for 6 -12 dwelling units
per acre. The proposed development would consist of 5.08 dwelling units per acre.
The total lot coverage of the seven buildings is approximately 51,376 square feet.
Excluding the proposed outlot, the total area of the parcel is 397,263 square feet.
The maximum lot coverage requirement of 20% sets the allowable lot coverage for
this parcel at 79,452 square feet. Therefore, the preliminary plat is under the
allowable lot coverage requirement by 28,076 square feet. Each of the buildings
are also under the 6,000 square feet per unit lot area requirement.
A 48,609 square foot outlot on the parcel will becane a public street for access
into the development site. The applicants are also negotiating with Dakota County
for a private road access onto County road 30.
The zoning ordinance requires 2.5 parking spaces per dwelling unit with one of
those parking spaces being covered. The applicant is proposing one covered park-
ing space for each dwelling unit. There are 78 open parking spaces on the site,
which is 1.5 spaces per dwelling unit, meaning the preliminary plat meets all
parking requirements.
CITY OF EAGAN
PRELIMINARY PLAT - HILLTOP CONDOMINIUMS
JANUARY 26, 1982
Page two
If approved, the preliminary plat should be subject to the following conditions:
1. The plat shall be subject to all easements as required by City staff.
2. A detailed grading, drainage and erosion control plan shall be approved
by City staff.
3. A detailed landscape plan shall be approved by City staff and an adequate
landscape bond shall be submitted with the final plat and not released
until one year after the landscaping has been completed.
4. The developer shall provide the City with a copy of the homeowners' asso-
ciation by -laws for review.
5. All other City ordinances shall be applicable to the overall development.
DCR/jach
ENGINEERING RECOMMENDATIONS
6. An 8" water main lateral must be constructed through this proposed devel-
opment to'the James Refrigeration site for future connection and looping
towards Pilot Knob Road.
7. Internal storm sewer drainage facilities must be located and properly
sized in conformance with City requirements.
8. This proposed development must receive approval from the Dakota County
Plat's Commission and/or Highway Department.
9. Outlot B must be dedicated as public right - of-way in its entirety.
10. A public street designed to City standards must be- constructed within Out -
lot B from Berry Ridge Road to County Road 30.
11. A minimum 60' half right-of-way must be dedicated for County Road 30
with additional land reserved for future acquisition at the time of up-
grading and relocation of County Road 30.
_12. A ponding easement must be dedicated incorporating the 859.0 elevation
for Pond LP -63.
13. The developer shall agree to assume the deferred assessments associated
with Project 88II for lateral benefit from trunk sanitary sewer. All
assessments associated with the extension of water laterals shall be the
responsibility of this plat.
14. All costs associated with the upgrading and installation of the street
within Outlot B shall be the responsibility of Hilltop Condominiums
and/or James Refrigeration only.
15. The developer shall install a pathway in accordance with the recommen-
dation of the Advisory Park Committee.
TAC /jach
•
•
TO: THE ADVISORY PLANNING COMMLISSION, C/O DALE C. RUNKLE, CITY PLANNER
FROM: THOMAS A. COLBERT, DIRECTOR OF PUBLIC WORKS
DATE: JANUARY 21, 1982
RE: PRELIMINARY PLAT - HILLTOP CONDOMINIUMS (LOREN SPANDE)
The Public Works Department has the following comments to offer in consi-
deration of the above- referenced proposed plat:
UTILITIES
Sanitary sewer of sufficient size and depth to handle this proposed devel-
opment is available. The sanitary sewer is located east westerly through
the middle of this proposed plat and also along the easterly line.
There is presently an 8" water main located within Berry Ridge Road with
a lateral stubbed to the south into Outlot B for future extension. This
water main lateral will have to be extended to the south throughout It B
for future connection and looping through the James Refrigeration proper-
ty located to the west of Outlot B.
GRADING AND DRAINAGE
The location of this proposed development is on the side of the hill with
an approximate 80' differential topography sloping to the east into the
existing drainage basin located within Hilltop Estates. There presently
exists a 15" storm sewer from Outlot B to this drainage basin on the eas-
tern side of this proposed plat. This storm sewer was installed to pro-
vide drainage for the James Refrigeration plat. The proposed grading plan
requires the installation of internal storm sewer system to provide posi-
tive drainage for parking lot areas into this easterly drainage basin.
Part of the developer's proposed site plan for storm sewer along the sou-
therly boundary of this plat incorporates a section of rural ditch drain-
age. This storm sewer drainage system should not incorporate the use of
a ditch and should be relocated to the proposed future northerly right -
of -way of the relocated County Road 30. Positive gravity storm sewer
should be provided all the way to the water elevation of the drainage
basins on the easterly edge of this plat.
The developer has indicated that he plans to perform minimum excavation
in the development of this facility due to the steep topography of this
property. The proposed grading plan is feasible and the developer should
be urged to confine his grading operations to a minimum to preserve the
maximum number of trees and minimize the potential for erosion during con-
struction on this steep side slope.
Extensive erosion control measures will have to be maintained throughout
construction around the perimeter of the pond around the eastern edge of
CITY OF EAGAN
HILLTOP CONDOMINIUMS - PRELIMINARY PLAT - DIRECTOR OF PUBLIC WORKS MEMO
JANUARY 21, 1982
PAGE TWO
this proposed plat.
STREETS
The developer proposes to take access into this proposed plat from Berry
Ridge Road, County Road 30 and the future construction of a public street
within Outlot B. The private driveway access from County Road 30 must re-
ceive approval from Dakota County Highway Department. At this time, the
City has not received a response pertaining to this proposed connection.
The intersection of County Road 30 with Pilot Knob Road is proposed to be
relocated approximately 155' to the north from its present location. Sub-
sequently, this relocation will affect a portion of the southerly bound-
ary of this proposed plat. Elevations of future road construction within
Outlot B and the private driveway accesses should take into consideration
the future elevation of County Road 30 to eliminate extensive reconstruc-
tion in the future when County Road 30 is upgraded.
Outlot B was reservee of sufficient width to net the required City stan-
dards for dedication of public right-of-way to incorporate a standard
public street section. Subsequently, a minimum 32' 7 -ton residential
street will have to be constructed within Outlot B connecting Berry Ridge
Road with County Road 30. The southerly portion of this future public
street should be widened to a minimum 40' width to provide proper turn
lanes anticipated by the ultimate development of the James Refrigeration
site combined with this multiple density proposal. Specific design de-
tails will be reviewed by staff prior to final plat approval.
EASEMENTS AND RIGHTS -OF- -WAY
Adequate easements have been dedicated incorporating the existing utili-
ties presently within this proposed plat. Additional easements will be
necessary to incorporate future public utilities (sanitary and water) to
service this proposed subdivision.
Outlot B must be dedicated as a public right - of-way to allow the construc-
tion of the required street. In addition, a minimum 60' half right-of-way
must be dedicated for County Road 30 with a provision made for future ac-
quisition of right-of-way necessitated by the relocation of County Road
30.
This plat must provide for the dedication of a ponding easement incorpor-
ating the 859.0 elevation for the existing pond on the eastern edge of
this proposed plat referenced as Pond LP -63 on the master comprehensive
storm sewer plan. This pond presently has a positive storm sewer outlet
to Carlson Lake.
ASSESSMENTS
Lot 33, Block 5, Hilltop Estates has previously been assessed for sani-
tary sewer lateral under Project 217 which provided for the installation
of sanitary sewer in Berry Ridge Road within Hilltop Estates. It was also
•
•
•
•
•
CITY OF EAGAN
HILLTOP CONDOMINIUMS - PRELIMINARY PLAT - DIRECTOR OF PUBLIC WORKS MEMO
JANUARY 21, 1982
PAGE THREE
assessed for sanitary sewer lateral under Project 300 for the installation
of sanitary sewer through this property to service James Refrigeration.
However, this proposed development will now be responsible for a lateral
benefit from trunk sanitary sewer associated with a 27" trunk sanitary
sewer along the eastern edge of this proposed plat which was installed as
a part of Project 88II in 1972. Assessments associated with this proposed
trunk against the undeveloped property at that time was deferred until de-
velopment occurred with subsequent connection into this trunk. There is
approximately 645 lineal feet of lateral benefit from this trunk sanitary
sewer. This will be assessed at lateral benefit from trunk rate in effect
at the time of final plat. Based on the 1981 rates, it is estimated at
$9,610.00.
Any extension of water main facilities to service this plat, or installa-
tion of storm sewer facilities to handle internal drainage should be the
. entire responsibility of this development. The upgrading of the public
street within Outlot B should be shared between the James Refrigeration
development and this proposed Hilltop Condominiums in a method to be de-
termined at a later date. It is felt that the Beautiful Savior Church
located by the northwest corner of this proposed plat would not benefit
by the installation or construction of public utilities or streets within
Outlot B due to the fact that this property is adequately serviced by
streets and utilities within Berry Ridge Road and/or Pilot Knob Road.
All other trunk area assessments have been levied and no future assessments
are anticipated for trunk area benefits.
TRAILWYS
At the time of the development of the Hilltop Estates plat, the developer
entered into an agreement providing for the construction of a trailway
around the westerly edge of the proposed ponding area on the east side of
this proposed plat. The Advisory Park Committee will be reviewing if this
is still a feasible location, or if it should be relocated to the west side
of the proposed future street within Outlot B to provide adequate pedestrian
access to the James Refrigeration commercial development adjacent to the
west edge of this plat.
I will be available to discuss in further detail any questions the Planning
Commission may have pertaining to this proposed subdivision at the Planning
Commission Meeting of January 26, 1982.
Respectfu - submitted,
TAC /jack
omas A. Colbert, P.E.
Director of Public Works
PC( C88•4N$. 51E CORPORATION
4940 NKING DRNE
MINNEAPOLIS. MN
90435
‘-:CN
DEVELOPERS• ARCON CONSTRUCTION
DEVELOPERS CONSTRUCTION INC
12443 RIVER RIDGE BLVD.
BURNSVILLE. MN '
05375
CONTACT - LOREN WAND( S90.6494
PRESENT ZOM11G B PROP05ED USE T R -3
AREA ; OuTLOT B • 43.609 S.F
LOT 33. BLOCK B • 397.233 IF
LEGAL DESCRIPTION, .0T 33. BLOCK 5 AND
OUTLOT S 911 M HILLTOP
[STATES IM •' The one N
wcar9 M the Wks d MO
DOWN COMMT. $.w*.. I
•
DES4NER-
•ENGINEER -
Su4VETOR•
CHARLES NOVAK ARCHITECT INC.
147SO SOUTH ROBERT TRAIL
ROSEMOUNT. MN 53066
423 - 22'54
RALPH WAGNER
•
PROBE ENGINEERING '(
BURNSV1LLE. Mel 303711 r
432 - 3000
OELMAR N. SC/Iv/ENE
2975 WEST 445* STREET s
ROSEMOUNT. 13* 050411
423 -1749
DATED DECEMBER -31. 1961
i"" -- ._..�..,r..�...
4 ' e '=l ` / HILLTOP CONDOMINIUMS
r /
\ /
044T L; , r G
ComNi r Ro *so No 3o
r.
1 . Z
2l
w_�rN
SCALE 1 u1Ct1`100iee
le
DELMAR IL SCHWANZ
LAND WNW TOR
81 NI
t.
• CITY OF EAGAN
SUBJECT: PRELIMINARY PLAT - COUNTRY GLENN CONDOMINIUMS
APPLICANT: MID- CONTINENT BUILDERS - JACK HAYES
LOCATION: LOTS 3 AND 4, BLOCK 2, FOXRIDGE ADDITION
EXISTING ZONING: R -4 (RESIDENTIAL MULTIPLE DISTRICT)
DATE OF PUBLIC HEARING: JANUARY 26, 1982
DATE OF REPORT: JANUARY 19, 1982
REPORTED BY: DALE C. RUNKLE, CITY PLANNER
APPLICATION SUBMITI` D :
An application has been submitted requesting a preliminary plat, Country Glenn
Condominiums located on Lots 3 and 4, Block 2, Foxridge Addition. The prelimi-
nary plat consists of approximately 13 acres and contains 192 condominium units.
LAND USE AND ZONING
Presently the site is zoned R-4 (Residential Multiple District). The existing
zoning would only allow multiple dwellings on the proposed site. The proposed
site plan is consistent with the existing zoning. The land use for the proposed
site also indicates an R -4 (Residential Multiple District) with a density of 12+
dwelling units per acre. Therefore, the plan is also consistent with the pro-
posed land use guide plan.
SITE PLAN REVIEW
The subject parcel consists of 13.09 acres and the developer is proposing to con-
struct four 42 -unit condominiums buildings and one 24 -unit condominium building
for a total of 192 dwelling units. The site density for this proposed project is
14.6 dwelling units per net acre.
The subject parcel is bordered on the east by Coachman Road and to the north by
Letendre Street. These streets are presently constructed and the site is proposing
to take direct access onto Coachman Road. To the south of this subject parcel is
bordered by an existing apartment complex and to the west by an existing town-
house complex.
The proposed site plan indicates 3 -story buildings and is proposing to have a mix
of 84 1- bedroom units and 108 2- bedroom units. As stated by the plat, the devel-
oper is proposing to construct the project as owner- occupancy for each unit from
the beginning. Therefore, this will not be a rental project but owner- occupied
from the beginning.
In calculating the density for the one and two - bedroom units for a 3 -stow build-
ing, the required square footage of land for the 192 dwelling units would be
578,400 sauare feet. The total site of the 13.09 acres contains 570,395 square
CITY OF EAGAN
PRELIMINARY PLAT - COUNTRY GLENN CONDOMINIUMS
JANUARY 26, 1982
PAGE TWO
feet. Therefore, the applicant is approximately 2 -3 dwelling units over the re-
quired site density. The 8,000 square feet would be approximately 2 -3 dwelling
units in excess according to the square footage requirements. However, looking
at the overall site plan, the applicant is proposing 42 -unit buildings and 24-
unit buildings, and therefore would be impractical to construct a 39 -unit build-
ing. The applicant has indicated that he would not sell two to three units in
the project and keep them for storage vs. trying to redesign a building to make
39 units. Therefore, either a variance would be required for the additional
3 units, or a restriction that the developer would not sell three of the units
within the project to meet the overall site density.
The parking requirement for the project according to Ordinance 52 would require
the developer to provide one garage space and 1.5 parking spaces per dwelling
unit for a total of 480 parking spaces. The applicant is proposing to construct
one garage space per unit and 243 outside parking spaces for a total of 335 park-
ing spaces. The 335 parking spaces equals 1.75 parking spaces per dwelling unit.
If the City would require 2 parking spaces per unit, the parking space require-
ment would be 384 spaces. Again, staff would like to point out that in conver-
sations with other communities, 2.5 parking spaces seems to be in excess of the
parking needs for condominium units, and most communities have 2 parking spaces
per unit as a standard requirement. Therefore, the applicant is requesting to
reduce the number of parking spaces to 1.75 which has been a study they had con-
ducted in Apple Valley to be an adequate amount of parking spaces for condomin-
ium units.
In reviewing the lot coverage of the building and covered parking, the applicant
is proposing to cover 112,193 square feet for a total of 19.6% lot coverage.
This is under the 20% lot coverage for residential dwelling. In reviewing the
site plan, the applicant has met all the setback requirements for the buildings
on the lots. The applicant is also proposing to provide a recreational area in
the center of the complex which would consist of a pool and 2 volleyball courts
plus open space. The applicant should incorporate a tot lot facility in order
to provide the needs of the preschoolers within this neighborhood.
The access to this site is proposed to be taken off of Coachman Road. Each ac-
cess would serve approximately 96 dwelling units. The applicant has proposed
24' access and 24' drive aisles throughout the parking area. Therefore, it
should be adequate to provide circulation in each of the parking areas.
If approved, the preliminary plat should be subject to the following conditions:
1. That a variance should be granted to allow 3 extra dwelling units, or a
stipulation should be required that the developer does not sell 3 of the
units in order to cone into compliance with the square footage requirement.
2. The outside parking spaces shall be a 10 20'dimension and the parking
area shall be surfaced with concrete curbing around the perimeter of the
parking area.
3. Homeowner association by -laws shall be submitted and reviewed for the
CITY OF EAGAN
PRELIMINARY PLAT - COUNTRY GLENN CONDOMINIUMS
•
JANUARY 26, 1982
PAGE THREE
development prior to the final platting of the first stage.
4. A detailed landscaping plan shall be submitted and approved by the City
and a landscape bond shall be required for an adequate amount and not re-
leased until one year after the landscaping has been completed.
5. The subject plan shall be reviewed by the Eagan Park Committee. At the
present time, the staff would be looking at a cash dedication per unit.
This, however, is subject to the Park Committee's review and recommenda-
tion.
6. The applicant is proposing 335 parking spaces which is 1.75 parking spaces
per unit. A variance would have to be granted from the strict require-
ment of 2.5 parking spaces per dwelling unit, or somewhere in between.
7. The applicant shall dedicate all easements as reauired by City staff.
8. All other ordinance requirements shall be met.
DCR/jach
• ENGINEERING RECOMMENDATIONS
9. A detailed grading, drainage and erosion control plan must be approved
prior to final plat.
10. Coachman Road should be ordered for upgrading under a City contract prior
to final plat.
11. A storm sewer outlet must be provided for the proposed ponding area, or,
if the ponding is eliminated, storm sewer must be constructed from Letendre
Road to the Foxridge Addition.
12. This development shall accept the deferred assessment for the lateral bene-
fit from trunk water main along Coachman Road. The amount shall be deter-
mined based on the rates in effect at the time of final plat.
13. The developer shall assume the deferred assessments for lateral benefit
fran sanitary sewer along the south and north property lines. The rates
used to determine this lateral benefit amount shall be those in effect
at the time of final plat.
14. This development shall provide for the installation of a 5' sidewalk along
the west right-of -way line of Coachman Road adjacent to this development.
TAC /jach
T0: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUUNKLE, CITY PLANNER
FROM: THOMAS A. COLBERT, DIRECTOR OF PUBLIC WORKS
DATE: JANUARY 21, 1982
RE: PRELIMINARY PLAT - COUNTRY GLENN CONDOMINIUMS (Mid Continent Bldrs.)
The Public Works Department has the following comments to offer in con-
sideration of the above- referenced proposed plat:
UTILITIES
Sanitary sewer and water main of sufficient size and capacity to handle
this proposed development is available immediately adjacent to this pro-
posed plat. Internal lateral extensions and /or service lines will have
to be installed to provide service to the individual buildings.
STREETS
Access to this proposed development will be provided by way of two indi-
vidual driveway entrances from Coachman Road. Coachman Road is classi-
fied as a collector street with an ultimate design of 44' width with
concrete curb and gutter. Coachman Road has been constructed to a first
stage 24' bituminous surface, gravel shoulders with rural ditch section
under Project 81 in 1973. With the existing Foxridge Apartments to the
south, Coachman Oaks Apartment complex and the recently approved Coachman
Land Company 1st Addition at the intersection of Four Oaks Road and
Coachman, we will generate additional traffic volumes that will require
the upgrading of Coachman Road to its ultimate design section as a collect-
or road. Present City policy requires multiple density zoning to be re-
sponsible for upgrading to City standards collector streets adjacent to
their property.
In addition, collector streets have a 5' concrete sidewalk, or 8' bitum-
inous trail constructed on one side of the roadway. This development
should also be responsible for the construction of the sidewalk along
the west side of Coachman Road when Coachman Road is upgraded.
GRADING AND DRAINAGE
Presently, the entire site drains into an existing long ravine located
adjacent to the west property line of this proposed development. All
surface drainage from this development presently drains into this low
basin. In addition, storm sewer outlets fran the Foxridge Apartments
to the south and the Rivergate Townhouses to the west presently dis-
charge into this law area which presently does not have a storm sewer
outlet provided. This low drainage basin is the upper end of a long
ravine that was isolated when Letendre Road was constructed. Letendre
Road presently acts as a dike restricting a natural outflow from this
•
•
•
CITY OF EAGAN
PRELIMINARY PLAT - COUNTRY GLENN CONDOMINIUMS
JANUARY 26, 1982
PAGE Two
low drainage basin. The developer proposes to construct a long, narrow
ponding area adjacent to the east property line incorporating this ex-
isting dead end drainage basin. A storm sewer overflow would have to
be provided at the northern end connecting into the existing trunk storm
sewer within the Letendre Road which has a positive outlet down to the
Minnesota River. The proposed grading plan would create a pond approx-
imately 750' long by 85' wide and 9' deep. However, because of the
existing subgrade material, water presently does not pond in this area
due to the percolation capabilities of the soil. This would provide
a temporary sedimentation basin for the runoff from the paved surface
areas of Foxridge, Rivergate and the proposed Country Glenn parking lots.
If this temporary ponding area is found to be undesirable, approximately
1,000 feet of storm sewer would have to be constructed within this area
to intercept the proposed storm sewer discharges from this development
in addition to connecting to the existing storm sewer outlets from River -
gate and Foxridge.
ASSESSMENTS
This property has been previously assessed for its trunk area sanitary
sewer, water and storm sewer assessments. There has been a deferred
assessment for lateral benefit fran trunk water main along Coachman Road
which was installed under Project 61 until the time of development and/
or connection. This lateral benefit from trunk water main assessment
will be the responsibility of this development if it should occur.
Based on 1981 rates, its approximate frontage of 765' (corner lot credit
applied) would result in approximately $11,000.
This property has not been assessed for sanitary sewer which is avail-
able adjacent to the southwest and north property lines. These sewers
were installed under Projects 8, 29 -3 and 61. Based on benefit received
and anticipated points of sanitary sewer connection at the north and
south end of this development, results in approximately 1,194 feet of
lateral benefit which, if levied at the 1981 rates, would result in ap-
proximately $15,650.00.
In accordance with existing City policy, this development would be re-
sponsible for its share of the cost of upgrading Coachman Road to the
ultimate design standards for a collector street necessitated by this
proposed and other existing developments adjacent to Coachman Road.
Future costs associated with this upgrading and trailway construction
would be delineated in a future feasibility report yet to be prepared.
In addition, all costs associated with the installation of internal san-
itary sewer, storm sewer and water main facilities to provide service
to the individual buildings will be the entire responsibility of this
proposed development.
CITY OF EAGAN
PRELIMINARY PLAT - COUNTRY GLENN CONDOMINIUMS
JANUARY 26, 1982
PAGE THREE
EASEMENTS AND RIGHTS -OF -WAY
Sufficient half right -of -way for Coachman Road and Letendre Street has been
previously dedicated. No additional right -of -way for streets are anticipa-
ted as a result of this development. Sufficient easements incorporating
existing utilities and proposed future public utilities must be dedicated
as a part of the final plat.
I will be available to discuss in further detail any aspect of this report
at the Planning Commission Meeting of January 26, 1982.
Respectfully submitted,
Thomas A. Colbert, P.E.
Director of Public Works
TAC /jach
•
•
O. - 1 Ora. .r•.wM
Q Eoo 00
SCAL! IN P AL
Mh
11,
o
0
1
.... ......... : .
E
238.00 223,00 ....—
N S9 78' If t
: iW
0
0
.... 4:4" o
$. '•. o
0
27B.Oo
r i - -..= r7.
1
BLOCK I
~ N •0
17,404.4.a . W •
.0 1
.2
N
h0gN1 t
I p
yj ..
to
PI
N Y9
L E TENOR!
5 es• r,'
LOTG C
♦ 1
1- It
t ue
1 • 3 sr so' oo -C
PRELIMINARY PLAT
COUNTRY GLENN CONDOMINIUMS
223.04.
23.00
4 W
... ae
°
• .N ° a N 74.00 l4.•).
o a S==.
STREGT
I hereby certify that thl• wintry, pltn at
:port w., prrrucd by rle or und.c mI
,1,, ct . „., ,od tF. t 1 tat a I ,1,
LEGAL DESCRIPTION
LOTS 3 AND }, BLOCK 2, PDX. R /OGE
ADD/T /ON DAKOTA COUNTY, MINNESOTA
AREA
570,393: I I SQ. Pr
/3. 0944 ACRES
11- 2 /b R., .ZV2
C. E. DAI/��LGREN 4 ASSO(
/ 71 RANOOLP 1 A■.
ST PAUL N.INNESG
•CUTE. 1 N a,)O AT'
AMfOVEY BY
DATE: .J ^ft/ M..96 2
M /DCONTIN,EN 6 UILO
30 E. PLATO BLVD., .5 77 P/
COAL $ O T CUNOOMrM W
G AG, e 1 � M i 11
.y i/i' /L[M[N TE PLAN (fYiFL/M I/i'
illy/111"E 11,0A D
to to*
••
1111111i111111,11
L
111111111111
to Si. AMU.%
41 - VIJIT
uurr I.
MP+
+1.• uurr st04.
HM1111111111111
sit. Plan
••■■■••••••
J
1111111111111111
*s ...A dM1I
1111111111111111111
14 fle■■■■■■■■•
till
1.
11
iwi1iiiiriiiiiI11111 1--
1 1 1'
UIfl
11111111111111111i1
111111
I 11 I 1111 I1i 111;
i
1 " •- Mot St..•
7/
•1•1• I SO' 11.
1
ZoL73
I- Bebe. COH 84-
l 15438.-COH
Tor I IL
P #4-1 SPA era
Go .4 WA eqe.
0 Pet"
`r or". I— +4 0
•
t 0II
1.6.81
as,
•
•
>rr
• *.•.POs
•
II
II
1
•
111111111M1.1 1111J1JI
t• /e• "•
e•w. • �ecw •`
ICIIIJI1(I11rI1IIlIII!IllIll
t
H• w•T M•
•7r1. •t. •f•t
4t•u•iT ►4•.'
•t►
K• uu1T ►w
It •ro•►•
/•
•r•w••
•: •
•/w •
•••••
t • •.
7 j . 1 `
'� � � .r a �- •o
N • ••
NI •K
11
Mill 1111111 1
wM
t1TiIII I rt III I
•.I
E LI llltffllll
1 1
•n .•
•e•
t•• uu1T
•
• • 1 .•••
tet
J
1 it Ili III!IL1+
••• •
21:ilf 1111111111
X1111111
•t• I.MT •••••
N +R • K i
i4
�1
I
a =w
• 11
•
0
•
•
1
5.11• Plan
••.1• Iw• {.•
14. •.
•■•
CODDOMIUIUH UPITS:
. 1- Booto LI 8••
eeotmn Loa
TOT •I- 1 9 L
PA- 1 Sew fL1:
G A aw•t• 1 ,1.
Tor/. L. t/•
4i•411 ••••• • N Mil
44
•••• •
n:cb • ,• 1e• ,..
•
1(
r
4 1
. .
0•
i 0
1.0 •
1
eaww -•:d. ��•i.. r•..1y
GRADING DRAINAGE * EROSION CONTROL PLAN
CI UNTRY GLENN CONDOMIN /UN1S
1
R I I
' Ind.
„22.2,E
21.20, 22.22'__ 2
A
OUNJ
• COMMERCIAL (fl
PLANNED DEVELOPMENT
R -II
Ind.
. -5 - Pas..
RII
• R-II
/ /
7/ cLue
MD.1O TO: ADVISORY PARK AND RECREATION COMMITTEE
FROM: KEN VRAA, DIRECTOR OF PARKS $ RECREATION
RE: PRELIMINARY DRAFT - MATCHING GIFTS
December 1980
Background: At the time the Advisory Committee discussed the South Oaks soccer
kick board, (October 1980) the Advisory Committee questioned if it should not
develop some type of policy guidelines, when approached to "match" neighborhood
requests for parks development /equipment. Staff was asked to review this
possibility.
Issues to be Considered: Generally, the City will want to be sensitive to the
desire of a neighborhood group in planning and developing a park. This is also
true of "special interest groups," who may desire some type of special equipment
to enhance a program. When a group proposes to pay for a portion of the develop-
ment /purchase costs, the City should review both the positive and negative impli-
cations.
First, it shows genuine interest by the group by its willingness to fund the
development. This interest will have a positive impact on how the park /equipment
is cared for. The feeling of ownership generally translates into one of care.
Two, it allows the City to accomplish park development with less tax dollars.
Three, it encourages local groups to take pride in their parks while providing
a service to the community.
There is some negative implication of "cost matching" for parks development:
1. Matching may lead to "possession" attitude towards the park to the
extent that the park or fixture is not a City or neighborhood facility/
fixture but for the exclusive use of the few who may have helped finance
the gift.
2. The "gift" may be used as leverage in obtaining future park /City
considerations by the use of the argument "after all we paid for this
we want - . - - - "
3. In some situations a gift may cause future development problems in the
park. "You can't take that (piece of equipment) from the park, our
neighborhood paid for that 15 years ago."
4. "Lower priority" items may be developed in one park prior to a higher
priority item in a distant park. This may lead to the feeling that one
neighborhood group is being favored over another.
For these reasons, the following ideas for guidelines are proposed for consideration.
1. Each matching request should be reviewed on its merits. The development
should be consistent with the established park development plan or C.I.P.
2. Matching money should be provided so as not to take away from committments
to other parks or developments.
3. An understanding or policy that the match is seen as being something that
may have to be changed, removed, modified, etc., as future park develop-
ment occurs or as the equipment ceases to provide the type of use
originally intended.
4. The "gift" is consistent with the City wide systems priority for
development.
5. A limit on the dollar amount the City would be willing to match for any
one group /park area.
Action: The Committee may wish to discuss the implications of a matching program
and possible guidelines to determine if an adopted review procedure is necessary.
•
MEMO TO: ADVISORY PARKS AND RECREATION COMMITPEE
FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION
RE: PARK NAMES
February 1982
The Sub - Committee on Park Names has drafted the following article which
is being suggested to be placed in the next issue of the City's Newletter.
A map showing park locations will also be inserted in the Newsletter. Re-
view and approval of the letter and recommendation to the City Council is
in order for consideration.
NAMING OUR PARKS
One of the Advisory Parks and Recreation Committee's goals is to erect signs
at park entrances. However, most City parks do not have official names.
This involves a recommendation by the Advisory Committee and formal action
by the City Council.
You, who are park neighbors and hopefully users of the parks should have
a voice in the selection of park names. Please give us your suggested
names for your neighborhood park as well as any of the community parks
which are not officially named.
A map showing location of parks is provided on the (next page)(reverse
side of this page). All existing parks are listed by category below.
Space is provided after each listed park for your suggested names. Fold
the sheet and drop in the mail - no postage is required.
For your general guidance parks may be named after the subdivision or
neighborhood, school or adjacent street; lake, pond or creek; name used
by most people in reference to the park; topographical or dominant
feature or vegetation common to the site; creative name based on his -
rorical use or events relating to the site; or the name of a person,
usually in memoriam and significant to the history of the area.
We appreciate your interest and help in the project. If you have any
questions please call the City Park and Recreation office at 454 -7802.
A BLOMQUIST
MAYOR
THOMAS EGAN
MARK PARRANTO
JAMES A. SMITH
THEODORE WACHTER
COUNCIL MEMBERS
January 27, 1982
Mr. Tom Gustafson
4428 Dodd Road
Eagan, Mn 55123
Dear Mr. Gustafson:
CITY OF EAGAN
. 9795 PILOT KNOB ROAD
P.O. BOX 21199
EAGAN, MINNESOTA
55122
PHONE 454
On behalf of the Advisory Parks and Recreation Committee, as well
as the Department, I would like to Welcome you to the Committee.
As you know, the Advisory Committee meets on the first Thursday
of the month. The agenda for the Committee is prepared and out prior to
the Wednesday preceeding the meeting to allow you some prepartory time.
Should you ever have any questions in regards to items contained within
the packet, please feel free to contact the office.
To assist you with some of the items that the committee has recently
been dealing with, I've taken the liberty of enclosing the packets and
minutes from the meeting of November and Pecember of 1981. Also enclosed
is a "Scope of Services" which has been prepared in anticipation of a
Master Parks Plan study to be done by an outside consulting firm.
The Advisory Committee has been studying the issue of park develop-
ment for several months and has concluded that a Master Parks Plan study
could detail this needed effort.
Another enclosure relates to the responsibility of an Advisory
Committee member. This was recently prepared and adopted by the City
to assist new members of the committee.
I would like to offer to you the opportunity to visit with me con-
cerning any matters that you may wish to discuss concerning parks and
recreation.
Again, welcome to the committee. I look forward to meeting you
personally at the next Advisory meeting on February 4th.
Since
Ken Vraa,`Director
Parks $ Recreation
KV:bp
cc: Roger Martin, Chairperson
THE LONE OAK TREE ... THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY
THOMAS 111 111.1
CI IV AOMINP.tU..nnu1
EUGENE VAN ■VI 14IWKE
CITY I:I I ISM
ADVISORY PARKS AND RECREATION COMMITTEE MEMBERS EAGAN
TELEPHONE TERM EXPIRES
Roger Martin, 454 -8921 (h) 456 -4654 (w) 12 -83
Chairperson
4435 Oak Chase Road
Eagan, MN 55123
Carolyn Thurston 454 -5843 12 -82
Vice - Chairperson
4454 Oak Chase Way
Eagan, MV 55123
Richard Carroll 452 -7597 12 -84
Secretary
4485 Oak Chase Lane
Eagan, MN 55123
George Kubik
3053 Pine Ridge Dr.
Eagan, MN 55121
Margaret Tilley
1055 Wescott Rd.
Eagan, MN 55123
Douglas McNeely
2060 Shale Lane
Eagan, MN 55122
Mike Fedde
1662 Norwood Dr.
Eagan, MN 55122
Sandra Masin
1795 Carnelian Lane
Eagan, MN 55122
452 -3887
454 -7819 (h)
452 -3475 (h)
452 -2966 (h)
452 -3411 (h)
Donn Schumaker 452 -5629
4367 Andromeda Way
Eagan, MV 55123
853 -6065 (w)
887 -7300 (w)
733 -6206 (w)
September 8, 1982
12 -82
12 -82
12-82
12 -83
12-83
12 -84
Tom Gustafson 423 -4083 (h) 457 -9530 (w) 12 -84
4822 Dodd Road
Eagan, MN 55123
COMMI FTEES
Development: C. Thurston, Chairman, Sandra Masin, D. McNeely, R. Carroll, M. Fedde,
R. Martin.
Park Names: M. Tilley, Chairman, R. Carroll, S. Johnson, S. Masin
Teen Program Study: D. McNeely, Chairman, T. Gustafson, C. Thurston.
Trails: R. Carroll, Chairman, D. McNeely, S. Masin, C. Thurston.
Recreation: M. Fedde, Chairman, C. Thurston, D. Schumaker, T. Gustafson.
Dorothy Peterson will act as staff liaison to the Teen Committee and Recreation.
Ken Vraa, will act as staff liaison to the Development, Trails, Park Names as
well as Recreation.