No preview available
 /
     
2805 Dodd Rd - Balance ReportsALLAN MECHANICAL, INC. 7875 Fuller Road EDEN PRAIRIE, MINNESOTA 55344 1 (952) 934-3999 FAX (952) 934-3757 TO 6,A E- G A,-> fI? ? 3 O Pr-I o ? E' na,h (L e1. LA-64oy. .vi A). SS/ L 2 DATE JOB NO. ATTENTION RE: P€TX ?-a. nti, p P2-r WE ARE SENDING YOUched ? Under separate cover via the following. items: ? Shop drawings ? Prints ? Plans ? Samples ? Specifications ? Copy of letter ? Change order p:NL4N r°Pa.i3-- ? For approval ,tQ For your use [2A&-requested ? Approved as submitted ? Approved as noted ? Returned for corrections ? For review and comment ? ? FORBIDS DUE REMARKS ? Resubmit copies for approval ? Submit copies for distribution ? Return corrected prints ? PRINTS RETURNED AFTER LOAN TO US ? ee `l S 2- c3.? 4-f - 7 t 9 COPY TO SIGNED: If enclosures are not as noted, kindly notify us at once. THESE ARE TRANSMITTED as checked below: TEST AND BALANCE ANALYSIS REPORT FOR DEX MEDIA EAGAN, MINNESOTA SYSTEMS MANAGEMENT & BALANCING OF MINNESOTA, INC. 332 Summit Avenue, P.O. Box 339 " 651-257-7380 Center City, MN 55012 FAX: 651-257-7382 E-Mail: walUQsmbmn com Web Site: smbmn.com SYSTEMS MANAGEMENT & BALANCING OF MINNESOTA, INC. 332 Summit Avenue, P.O. Box 339 651-257-7380 Center City, MN 55012 VQW FAX: 651-257-7382 A.4BC TEST AND BALANCE ANALYSIS REPORT FOR PROJECT-. DEX MEDIA CONTRACTOR ALLAN MECHANICAL ARMTECI: UNKNOWN ENGINEER UNKNOWN EAGAN, MINNESOTA MINNETONKA, MINNESOTA CERTIFICATION: Mechanical systems have been completelytested and balanced to their optimum capabilities and in accordance with engineering design. CERTIFICATION NO.: 99-0425 By. Systems Management & Balancing of Minnesota, Inc. DATE: July 18, 2007 APPROVED: W D. Kalen, TBE, CxA sOs O c 1% : LAZ"CA , Dex Media Eagan, MN Dex Media Eagan, MN 1. The VAV address assignments need to be looked at by the controls contractor to eliminate duplication or conflicts. 2. The conference room is a former storage room and may need more air to satisfy. Set at maximum CFM attainable. -2- Test & Balance by Systems Management & Balancing of Minnesota, Inc. Dex Media Eagan, MN Outlet Schedule 3- NUMBER OUTLET TYPE SIZE" "K" REQUIRED VEL CFM PREL. VEL FINAL VEL CFM NOTE 1.05 131 NW CD 8 1.0 265 265 275 281 281 SW CD 8 1.0 265 265 317 288 288 STORAGE CD 8 1.0 265 265 255 249 249 SE CD 10 1.0 345 345 215 315 315 NE CD 10 1.0 345 345 253 351 351 1.06 OFFICE W LD 4' 1.0 265 265 272 271 271 N LD 4' 1.0 265 265 309 288 288 23 W LID 4' 1.0 265 265 293 281 281 + LID 4' 1.0 265 265 277 263 263 E LD 4' 1.0 265 265 246 251 251 1.07 LD 4' 1.0 250 250 236 246 246 LD 4' 1.0 250 250 242 281 281 LD 4' 1.0 250 250 237 239 239 LD 4' 1.0 250 250 258 271 271 LD 4' 1.0 250 250 198 228 228 LD 4' 1.0 250 250 208 232 .232 L LD M 4' 1.0 250 250 192 95 95 NOTES: Test & Balance by Systems Management & Balancing of Minnesota, Inc. Dex Media Eagan, MN Outlet Schedule 4- NUMBER OUTLET I TYPE SIZE" F] is REQUIRED VEL CFM PREL. VEL FINAL VEL CFM NOTE 1.08 W LID 4' 1.0 250 250 254 271 271 +' LID 4' 1.0 250 250 220 251 251 E LID 4' 1.0 250 250 215 241 241 S LID 4' 1.0 250 250 198 229 229 E CD 12 1.0 400 400 327 391 391 W CD 12 1.0 400 400 320 379 379 1.11 S LD 4' 1.0 240 240 309 261 261 N LID 4' 1.0 240 240 271 232 232 E CD 4' 1.0 250 250 486 271 271 1.12 N LD 4' 1.0 265 265 265 265 265 LD 4' 1.0 265 265 247 247 247 LD 4' 1.0 265 265 283 283 283 LD 4' 1.0 265 265 266 266 266 LID 4' 1.0 265 265 270 270 270 S LID 4' 1.0 265 265 268 268 268 NOTES: Test & Balance by Systems Management & Balancing of Minnesota, Inc. Dex Media Eagan, MN Outlet Schedule -5- ROOM OUTLET REQUIRED PREL. FINAL NOTE NUMBER TYPE SIZE" "K" VEL CFM VEL VEL CFM 1.13 1 N CD 10 1.0 340 340 309 316 316 NW CD 10 1.0 340 340 263 291 291 SW CD 10 1.0 340 340 314 318 318 SE CD 10 1.0 340 340 316 325 325 S CD 10 1.0 340 340 312 320 320 1.14 2 CONF. CD 8 1.0 125 125 71 188 188 WAITING W CD 8 1.0 265 265 169 245 245 E CD 8 1.0 265 265 222 281 281 WAITING E CD 8 1.0 275 275 258 286 286 W CD 8 1.0 275 275 147 251 251 1.15 S CD 10 1.0 400 400 418 437 437 CD 10 1.0 400 400 356 386 386 CD 10 1.0 400 400 340 362 362 N CD 10 1.0 400 400 389 399 399 ?d l I - ---] --- L-j NOTES: 1. Maximum air obtainable without further reduction in air delivery at other outlets. 2. Now a conference room. Airflow at maximum. Test & Balance by Systems Management & Balancing of Minnesota, Inc. Dex Media Eagan, MN Outlet Schedule -6- ROOM OUTLET B REQUIRED PREL. FINAL NOTE NUMBER TYPE SIZE" K" VEL CFM VEL VEL CFM 1.16 117 LID 4' 1.0 250 250 214 228 228 115 LID 4' 1.0 250 250 226 233 233 114 LID 4' 1.0 250 250 183 251 251 112 LD 4' 1.0 250 250 187 246 246 117 CD 8 1.0 150 150 228 162 162 115 CD 8 1.0 150 150 195 158 158 114 CD 8 1.0 150 150 215 161 161 112 CD 8 1.0 150 150 243 152 152 LA NOTES: Test & Balance by Systems Management & Balancing of Minnesota, Inc. Dex Media Eagan, MN Terminal Box Test 7- MAXIMUM CFM MINIMUM CFM FAN CFM UNIT SIZE" REQD ACTUAL READ ACTUAL READ ACTUAL NOTE 1.05 14 1485 1472 450 455 1485 1479 1.06 14 1325 1330 400 411 1325 1354 1.07 14 1600 1591 480 476 1600 1562 1.08 14 1800 1788 540 536 1800 1762 1.51 10 730 741 220 216 730 764 1.52 14 1590 1581 480 486 1590 1599 1.53 14 1700 1638 510 508 1700 1570 1.54 12 1205 1200 362 355 1205 1251 1.55 14 1600 1591 480 488 1600 1584 1.56 14 1600 1610 480 476 1600 1591 NOTES: Test & Balance by Systems Management & Balancing of Minnesota, Inc. AABC Associated Air Balance Council Annual Certificate ?joarWaal,er Walter D. Kalen Systems Management & Balancing of Minnesota, Inc. %Irry171Cion; of 1mv pa6v ?ca wnw; a , a- ana?cr° l?r rrr/:r; rc(rtlatiarrs arw1l rywr rnerrly r1 ties J"J'oeuxtetd_,lrr Oa%rncc ?aruui.. '77e/a/na?nrcrrua?r arr?.o> rzw11a 1 cr o>'In; total 6-e&trr; GeWwncF,irr; acayr kneel raif?i t?i .S/ar1.e?J/`C?.Ga6; ?iLf??6?7,f,'? ? ?LG.,?'liG??? a/ZC?a?S; CU nacnr?cr° ?,/zc ;G?sociatecl lir° C?rclarra; G'oarrar°l.Ja.rr 2007 T/us; r e's ti ar irrrz rurnrGer `29- o4-26 r? ilk; rv'cywizul J Gyltrrvv rricee!cfurrtcr o pia?roz%eeiofa aspocicatirrrv. Orr,fccar%on1 rr; renuocz4?1, on, arr a limad Ga mG r fu czXw?'ina,%orr. /' dw, q'yMV111Y1 1'ecol'a!11- dw yareceCXr:?r dear: ccl. cate r4.5&c-4-4 Oecemler° S1, 2007. Pre 'de t Executive Director Aua.11. 2007 7:34AM No-2362 P. 1 Legacy Companies, Inc. 885o Wentworth Avenue South, Bloomington, MN 55420 Phone (6It) 866-135i Fax (6=7-) 866.6829 Fax Cover Sheet To: •¢h T1-? s From: /hikes Tc1--,? .e Company: Date: •!? 7 Fax:. & fo7 S- 5 Pages: (inc. cover) Comments: 0 Design-Build. Heating. Air Conditioning. Controls. Z41tr Service Pev ; W * gEj9C9 7 8"SF4! VAV-2 1 8 180 211 180 2 8 180 239 186 3 8 180 198 183 4 8 180 175 178 5 8 180 124 175 6 6 150 124 155 7 8 180 243 181 8 8 180 212 185 9 8 180 199 177 10 8 180 '201 179 11 8 180 185 183 12 8 180 233 187 TOTALS 2130, 2344, 2149 FPVAV-3 1 8 175 229 180 2 8 175 208 176 3 8 250 237 259 4 8 250 255 247 5 8 250 212 254 6 8 250 189 244 7 8 250 123 260 TOTALS 1600 1453 1620 FPVAV-4 1 8 235 250 259 2 8 235 143 245 3 8 235 230 233 4 8 235 222 225 TOTALS 940 845 962 o-? Aug.17. 2007 7:35AM No-2362 P. 2 VAV-7 1 8 200 188 205 2 8 180 190 185 3 8 180 176 175 4 8 180 ,7 0 176 5 6 150 176 160 6 6 150 165 160 7 8 180 190 180 8 8 180 150 175 9 8 180 160 180 TOTALS 1580 1545 1596 C3 Aua.17 2007 7:35AM No-2362 P. 3 Aug•11. 2001 7:35AM No•2362 P. 4 VAV-10 1 8 200 220 202 2 8 200 210 205 3 8 200 225 200 4 8 200 190 195 5 8 200 225 210 6 8 200 200 200 7 8 200 170 200 8 8 200 210 210 9 8 200 230 190 10 8 200 240 195 TOTALS 2000 i_ 2120 2007 Aus.11. 2001 7:35AM No.2362 P. 5 FPVAV-14 1 8 260 300 250 2 8 260 310 260 3 8 260 220 245 4 8 260 250 250 5 8 260 280 260 6 8 260 '300 260 TOTALS FPVAV-15 1 6 1560 150 1660 200 1525 160 2 10 300 330 300 3 10 300 290 300 4 6 150 120 150 TOTALS 900 940 910 VAV-16 1 10 300 S00 300 2 8 250 300 260 3 6 150 200 160 TOTALS FPVAV-17 1 10 700 300 1000 500 720 310 2 10 300 500 310 3 8 200 400 220 TOTALS VAV-18 1 8 800 225 1400 ° 250 840 225 2 6 150 `200 160 3 8 200 220 200 4 8 200 200 200 5 8 250 240 250 6 6 100 120 100 7 8 225 250 230 TOTALS 1350 1480 1365 FPVAV-19 1 10 320 350 330 2 10 320 400 330 3 10 320 400 320 4 10 320 400 300 5 10 320 410 320 TOTALS FPVAV-20 1 10 1600 320 1960 400 1600 300 2 10 320 `410 310 3 10 320 440 330 TOTALS 960 1250 940 Aug.11. 2007 7:35AM No-2362 P. 6 VAV-21 1 6 150 200 150 2 6 150 200 160 3 6 150 230 - 150 4 6 150 200 165 5 6 150 220 145 6 6 150 200 155 7 6 150 210 150 6 6 150 200 150 TOTALS 1200 1660 1225 FPVAV-22 1 10 320 400 300 2 10 320 410 330 3 10 320 420 310 4 10 320 380 320 5 10 320 ;.390 325 TOTALS FPVAV-23 1 8 1600 250 2000 300 1585 245 2 8 250 350 255 3 8 250 320 250 4 8 250 240 260 5 8 250 270 240 6 8 250 300 260 7 8 175 200 200 FPVAV-25 1 8 250 290 260 2 8 250 300 250 3 8 200 230 200 4 8 250 290 250 5 8 250 275 250 TOTALS 1200 1385 1210 1TOTALS 1675 1980 1710 Aug-17. 2007 7:36AM No-2362 P. 7 VAV-27 1 8 200 300 200 2 8 200 250 210 3 8 200 300 210 4 8 200 280 210 5 8 200 250 190 6 8 250 300 260 7 8 250 310 250 8 8 200 250 200 9 8 200 220 200 10 S 200 225 210 TOTALS 2100 2685 2140 <_ Ir C Prepared by: 9/25/12 Gerald Lancette Certified HVAC Commissioning Administrator National Environmental Balancing Bureau NEBB Certification No. BSC - H 2483 225 Bridgepoint Drive SOUTH ST PAUL, MN 55075 8943 prepared for SCHADEGG MECHANICAL INC. Bal Tech, Inc 700 E. Broadway St. Paul Park, MN 55071 - Phone: (651) 459-2325 Fax: (651) 459-6618 Specialists in BALancing TECHnology of Environmental Systems Email: Mail@Bal-Tech.net File Number TESTING AND BALANCING VA VISN 2nd Fl Grand Oaks Business Park Page 1 CLIENT:SCHADEGG MECHANICAL INC. CONTACT PERSON:Greg Rustad PROJECT:VA VISN 2nd Fl Grand Oaks Business Park CONTENTS TESTING AND BALANCING TEST DATA Page 2 CERTIFICATION PROJECT:VA VISN 2nd Fl Grand Oaks Business Park THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGN QUANTITIES WHICH EXCEED NEBB TOLERANCES ARE NOTED THROUGH OUT THIS REPORT. THE DISTRIBUTIONS SYSTEMS HAVE BEEN TESTED, BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB PROCEDURAL STANDARDS FOR TESTING - ADJUSTING - BALANCING OF ENVIRONMENTAL SYSTEMS AND THE PROJECT SPECIFICATIONS. SUBMITTED & CERTIFIED BY: NEBB FIRM:BAL TECH, INC. ADMINISTRATORGERRY LANCETTE REG. NO.:BSC H-2483 DATE: 9/25/12 Page 3 Bal Tech, Inc.VAV Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: OpeningLocation SizeFactorVEL CFMVEL CFM %VEL CFM VAV#2-1 1255FH 1.03218225230237105%185191 2255FH 1.03218225219226100%203209 VAV Total:8 450462103% 400 <-CFM-><-CFM-> DDC Flow Coefficient:0.9Max: 450Min: 135 Comments: VAV#2-2 1257FH 1.0320921520621299%200206 2257FH 1.03209215215221103%206212 VAV Total:8 430434101% 418 <-CFM-><-CFM-> DDC Flow Coefficient:0.97Max: 430Min: 130 Comments: <- Preliminary -> 2nd Floor AC 9/14/2012 <-- Scheduled --><---------- Actual ----------> Page 4 Bal Tech, Inc.VAV Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: OpeningLocation SizeFactorVEL CFMVEL CFM %VEL CFM VAV#2-3 1258FH 1.0330631529630597%296305 VAV Total:6 31530597% 305 <-CFM-><-CFM-> DDC Flow Coefficient:0.97Max: 315Min: 90 Comments: VAV#2-4 1261FH 1.0325726523123890%233240 2260FH 1.03325335333343102%342352 VAV Total:10 60058197% 592 <-CFM-><-CFM-> DDC Flow Coefficient:0.96Max: 600Min: 180 Comments: VAV#2-5 1262FH 1.03218225222229102%229236 2262FH 1.03218225218225100%223230 VAV Total:8 450453101% 466 <-CFM-><-CFM-> DDC Flow Coefficient:1.04Max: 450Min: 135 Comments: 2nd Floor AC 9/14/2012 <-- Scheduled --><---------- Actual ----------><- Preliminary -> Page 5 Bal Tech, Inc.VAV Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: OpeningLocation SizeFactorVEL CFMVEL CFM %VEL CFM VAV#2-6 1269FH 1.03223230238245107%229236 2268FH 1.0322323021722497%250258 3267FH 1.0322323021622297%196202 4266FH 1.0322323021622297%202208 5265FH 1.03223230235242105%260268 6264FH 1.03218225225232103%214220 7263FH 1.03218225236243108%223230 VAV Total:14 16001630102% 1621 <-CFM-><-CFM-> DDC Flow Coefficient:1Max: 1600Min: 480 Comments: VAV#2-7 1270FH 1.03243250244251101%256264 2271FH 1.0324325023324096%231238 3272FH 1.03243250257265106%251259 4273FH 1.03243250261269108%261269 VAV Total:12 10001025102% 1029 <-CFM-><-CFM-> DDC Flow Coefficient:1.01Max: 1000Min: 300 Comments: VAV#2-8 1278FH 1.03233240247254106%264272 2277FH 1.0323324021722493%246253 3276FH 1.03233240244251105%296305 4275FH 1.0323324022323096%255263 5274FH 1.0323324022723497%263271 VAV Total:12 1200119399% 1364 <-CFM-><-CFM-> DDC Flow Coefficient:1.14Max: 1200Min: 360 Comments: <- Preliminary -> 2nd Floor AC 9/14/2012 <-- Scheduled --><---------- Actual ----------> Page 6 Bal Tech, Inc.VAV Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: OpeningLocation SizeFactorVEL CFMVEL CFM %VEL CFM VAV#2-9 1233FH 1.03262270267275102%241248 2232FH 1.03175180183188105%239246 3231FH 1.03194200212218109%202208 VAV Total:10 650682105% 702 <-CFM-><-CFM-> DDC Flow Coefficient:1.07Max: 650Min: 195 Comments: VAV#2-10 1254FH 1.0321822520821495%202208 2239FH 1.0322323021321995%256264 3238FH 1.0322323021121794%266274 4237FH 1.03223230223230100%251259 5236FH 1.0322323020020690%269277 6235FH 1.0322323021922698%274282 7234FH 1.0321822521722499%192198 VAV Total:14 1600153696% 1761 <-CFM-><-CFM-> DDC Flow Coefficient:1.08Max: 1600Min: 480 Comments: VAV#2-11 1227FH 1.0397100929595%8689 2229FH 1.039710099102102%108111 3226FH 1.0397100929595%9093 4230FH 1.039710099102102%9598 5225FH 1.0397100919494%9598 6224FH 1.0397100919494%8891 VAV Total:10 60058197% 579 <-CFM-><-CFM-> DDC Flow Coefficient:0.96Max: 600Min: 180 Comments: 2nd Floor AC 9/14/2012 <-- Scheduled --><---------- Actual ----------><- Preliminary -> Page 7 Bal Tech, Inc.VAV Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: OpeningLocation SizeFactorVEL CFMVEL CFM %VEL CFM VAV#2-12 1241FH 1.0378808284106%8284 2241AFH 1.0378808385107%8385 3221FH 1.0317518016216793%162167 4221FH 1.0310711010210596%102105 VAV Total:8 45044298% 442 <-CFM-><-CFM-> DDC Flow Coefficient:1Max: 450Min: 135 Comments: VAV#2-13 1253FH 1.0397100101104104%110113 2252FH 1.0321422019720392%213219 3250FH 1.0321422020821497%213219 VAV Total:8 54052197% 552 <-CFM-><-CFM-> DDC Flow Coefficient:1.03Max: 540Min: 160 Comments: VAV#2-14 1242FH 1.0378808385107%7577 2243FH 1.0378808588109%8082 3244FH 1.03126130137141109%143147 4245FH 1.0397100949797%7880 5246FH 1.0397100103106106%102105 6247FH 1.039710099102102%9396 7248FH 1.005050484896%9090 VAV Total:10 640667104% 678 <-CFM-><-CFM-> DDC Flow Coefficient:1.06Max: 640Min: 190 Comments: <- Preliminary -> 2nd Floor AC 9/14/2012 <-- Scheduled --><---------- Actual ----------> Page 8 Bal Tech, Inc.VAV Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: OpeningLocation SizeFactorVEL CFMVEL CFM %VEL CFM VAV#2-15 1219FH 1.03291300307316105%337347 2219FH 1.03291300314323108%300309 VAV Total:10 600640107% 656 <-CFM-><-CFM-> DDC Flow Coefficient:1.08Max: 600Min: 180 Comments: VAV#2-16 1217FH 1.03175180183188105%131135 2218FH 1.03175180187193107%148152 3212FH 1.0387909396106%8487 VAV Total:8 450477106% 374 <-CFM-><-CFM-> DDC Flow Coefficient:0.77Max: 450Min: 160 Comments: #3 not on plan. VAV#2-17 1200FH 1.0324325023524297%125129 2200FH 1.0324325023524297%134138 3203FH 1.0314615013513993%151156 4204FH 1.0314615014014496%167172 5205FH 1.0314615014114597%167158 VAV Total:10 95091396% 752 <-CFM-><-CFM-> DDC Flow Coefficient:1.02Max: 950Min: 240 Comments:#3 not on plan. 2nd Floor AC 9/14/2012 <-- Scheduled --><---------- Actual ----------><- Preliminary -> Page 9 Bal Tech, Inc.VAV Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: OpeningLocation SizeFactorVEL CFMVEL CFM %VEL CFM VAV#2-18 1287FH 1.03267275272280102%299308 2287FH 1.03267275288297108%294303 3287FH 1.03267275279287104%311320 VAV Total:12 825864105% 931 <-CFM-><-CFM-> DDC Flow Coefficient:1.15Max: 825Min: 248 Comments: VAV#2-19 1279FH 1.03175180190196109%186192 2280FH 1.03175180180185103%171176 VAV Total:8 360381106% 368 <-CFM-><-CFM-> DDC Flow Coefficient:1.01Max: 360Min: 108 Comments: Fan Powered VAV #2-20 1285FH 1.0020020018018090%312312 2285FH 1.0020020019719799%318318 3285FH 1.0020020019619698%336336 4285FH 1.00200200212212106%302302 5285FH 1.00200200215215108%285285 6285FH 1.00200200220220110%296296 Fan Total: 12001220102% 1849 Primary Max:10"RD0.552182120022011211101%23441289 <-CFM-><-CFM-> DDC Flow Coefficient:2.17Max: 1200Min: 360 Comments: <- Preliminary -> 2nd Floor AC 9/17/2012 <-- Scheduled --><---------- Actual ----------> Page 10 Bal Tech, Inc.VAV Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: OpeningLocation SizeFactorVEL CFMVEL CFM %VEL CFM VAV#2-21 1285FH 1.03257265261269101%290299 2285FH 1.03257265283291110%297306 3285FH 1.03262270270278103%269277 4285FH 1.03257265270278105%250258 5285FH 1.03257265274282106%229236 6285FH 1.03262270277285106%244251 VAV Total:14 16001684105% 1626 <-CFM-><-CFM-> DDC Flow Coefficient:1.07Max: 1600Min: 480 Comments: VAV#2-22 1284FH 1.03146150152157104%145149 2283FH 1.0314615013814295%133137 3202FH 1.0349505052103%6668 VAV Total:8 350350100% 354 <-CFM-><-CFM-> DDC Flow Coefficient:1.1Max: 350Min: 105 Comments: VAV#2-23 1288FH 1.03320330340350106%340350 2288FH 1.03320330343353107%343353 VAV Total:10 660703107% 703 <-CFM-><-CFM-> DDC Flow Coefficient:1Max: 660Min: 200 Comments: 2nd Floor AC 9/17/2012 <-- Scheduled --><---------- Actual ----------><- Preliminary -> Page 11 Bal Tech, Inc.VAV Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: OpeningLocation SizeFactorVEL CFMVEL CFM %VEL CFM VAV#2-24 1220FH 1.0324325023023795%221228 2220FH 1.0324325023924698%231238 VAV Total:8 50048397% 466 <-CFM-><-CFM-> DDC Flow Coefficient:0.94Max: 500Min: 150 Comments: VAV#2-25 1211FH1.0358605961101%133137 2214 Turnvane0.272777527775100%409111 3214 Turnvane1.21659800657798100%10161234 VAV Total:14 935934100% 1482 <-CFM-><-CFM-> DDC Flow Coefficient:1.44Max: 935Min: 300 Comments: <- Preliminary -> 2nd Floor AC 9/17/2012 <-- Scheduled --><---------- Actual ----------> Page 12 Bal Tech, Inc.Constant Volume Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: Air Balance Data OpeningLocationSizeFactorVELCFMVELCFM%VELCFM 1213 Turnvane0.272777530583110%31986 2211 Turnvane3.35157525168564107%176590 Total: 600646108% 677 DAT 55f Fan on high AC-1 9/17/2012 <-- Scheduled --><---------- Actual ----------><- Preliminary -> Page 13 Bal Tech, Inc.Equipment Data Project Name:VA VISN 2nd Fl Grand Oaks Business Park BTI File Number:8943 System: Start Date: System Data Make:Greenheck Model No.:SP-A90-QD Motor Data Horsepower:Frac. Phase:1 Frame:NA S.F.:NA Volts:115 Actual Volts:115115115 F.L. Amps:0.4 Actual Amps:0.30.30.3CFLA:0.4 MTR. RPM:900 Static Pressure InOutTotal Fan:-0.16-0.01Rise=0.15 Air Balance Data (Fan Total) OpeningSizeFactorVELCFMVELCFM%VELCFM 1256Turnvane0.38199751455573%13953 Total:755573%53 <- Preliminary -> F-2 (EF2) 9/19/2012 <-- Scheduled --><---------- Actual ----------> Page 14