2805 Dodd Rd - 2007 Structural Steel ReportA Structural Steel Special Inspection Final Report Grand Oak 10 Office Building Blue Gentian Road Eagan, Minnesota Prepared for Interstate Partners Project LV-06-00362A January 26, 2007 Braun Intertee Corporation `JAN 3 p 2607 i January 26, 2007 Mr. Gregory Miller Interstate Partners 860 Blue Gentian Road, Suite 175 Eagan, MN 55121 Braun IMertec Carporafion 11001 Hompshwe Avenue S Minneapolis, MN 55438 Project LV-06-00362A Re: Structural Steel Special Inspection Procedural and Final Report Submittal Grand Oak 10 Office Building Blue Gentian Road Eagan, Minnesota Dear Mr. Miller: Phone: 952.995.2000 Fax: 952 9952020 Web: 6rooninlerteacom Please find attached to this procedural report the Structural Steel Special Inspection Final Report for the Grand Oak 10 Office Building and the supporting Special Inspection Daily Reports. Special Inspection and Testing Procedures The special inspection services were provided by International Code Council (ICC) certified special inspectors in accordance with the requirements of Chapter 1700 of the International Building Code (IBC) and the project plans and specifications. The purpose of special inspections is to provide a review of the contractors work designated by the project structural engineer as needing special inspection under the guidelines of the IBC to determine compliance with the approved construction documents. The special inspector doesn't have the responsibility or authority to, nor is it the intent of special inspections to have them, judge, or modify the construction documents. Only the structural engineer of record can do this. As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize the results of our inspections and testing. Copies of this report were provided to the contractor's site representative for their review and records. As part of this report, items needing correction or discrepancies observed from the approved construction documents were noted. We also summarized the discrepancies documented in a Discrepancy Log and provided it to the contractor for their use. As needed, we also contacted the project structural engineer for additional direction and clarification on specific issues related to the drawings or discrepancies observed. Plans and Specifications The plans and project documents available at the site were used for our inspections. From time to time, we received plan modifications from the structural engineer. When received, these were used to evaluate the work completed in the field. Visual Examination of Field Welds Visual examination of the field welds was conducted in general accordance with American Welding Society (AWS) D1.1-2006, Figure 5.4 and Table 6.1 requirements and the requirements of the project plans and specifications. Visual examination of the light gauge metal stud welds was conducted in general accordance with AWS D1.3-1998, Section 6.0 requirements and the requirements of the project plans and specifications. Celebrating 50 years of growth through service and trust Interstate Partners Project LV-06-00362A January 26, 2007 Page 2 Bolted Connection Observations Bolted connection observations were conducted to determine if the bolt holes were filled and if the splined end of the tension control bolts had separated from the body of the bolt. Removal of the splined end is a direct indicator the bolt has been torqued to the minimum snap-off load. In addition, each connection was observed for fit-up and to determine if the various plies were in contact with one another. Deck Weld Observations Deck weld observations were conducted in general accordance with AWS DL3-1998, Section 6.0 requirements and the requirements of the project plans and specifications. In addition, the location and the completeness of the side lap fasteners were observed and evaluated. Anchor Bolt Observations The anchor bolts were observed to determine if they were in place, and if the nuts were installed, fully engaged and snug tight. If required by the construction documents, we also observed if the plate washers were installed. General In performing its services, Braun Intertec used that level of care and skill ordinarily exercised by reputable members of its profession currently practicing in the same locality. No warranty, express or implied, is made. Thank you for the opportunity to provide the special inspection and testing services for this project. After review of the attached Special Inspection Final Report, if you have any questions or require additional information, please call Dan Graham at 952.9952524 or Marv Denne at 952.995.2510. Sincerely, BRAUN INTERTEC CORPORATION/ Daniel P. Graham ICC Certified Special Inspector-Structural Steel and Welding Michael M. euer, PE Vice Presi ent-Principal Engineer Attachment: Structural Steel Special Inspection Final Report c: Mr. Louis Ho, Building Consulting Group Mr. Scott Wiestling, Finn Daniels Mr. Jack Grotkin, R. J. Ryan Construction Company Mr. Craig Novaczyke, City of Eagan Inspections Department Mr. Greg Bialon, Braun Intertec aroun Interte Corpomdon Phone: 952 995.2000 11001 Hampshire Avenue 5 Fax: 9529952020 Minneapolis, MN 55438 Web: brouninterfeeoon, Structural Steel and Precast Special Inspection Final Report City of Eagan, Minnesota Date: January 26, 2007 Attention: Mr. Gregory Miller Project: Grand Oak 10 Office Blue Gentian Road Minnesota Braun Intertec Proiect: LV-06-00362A In accordance with Section 1704 of the International Building Code and the agreed upon scope of services, special inspections and testing has been provided for the following items: Flting. The bolted connections detailed in the attached Special Inspection Daily Reports were observed general accordance with the requirements of the plans and specifications. There are currently no Structural Welding. The welded connections detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the project plans and specifications. Discrepancies were noted and documented. Following the required corrections or review with the structural engineer. The connections were found to be acceptable. There are currently no outstanding or unresolved structural welding related issues. The deck welding and side-lap fasteners detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the project plans and specifications. There are Conclusion Based upon the inspections performed and the attached reports, it is our professional judgment that, to the best of our knowledge, the inspected work was performed and completed in accordance with the approved plans, specifications, structural engineer provided modifications and applicable workmanship provisions of the International Building Code. Inspecting Firm: Braun Intertee Corporation I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed ;ichael fessional Engine under the laws of the% a 4 1W sota. ` .0 . NN euer, PE a'?o a rr e Vice President-Principal Engineer _ •Q_ License Number: 15571°. 166,78 January 26, 2007 Attachments: Special Inspection Daily Reports Summary of Discrepancy Log 1 through 9 Celebrating 50 years of growth through service and trust Page _ of BRAUN SIDRPT I NTE RTEC Special Inspection Daily Report Report No.: City of , .': , Project Name:°>n:;+{ Project Address: Client: Weather: Date of This Report: 6 "- X - - ''; Project No.: Client Project No.: Temperature: ,:• Sri' -,?.. Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Reber Placement ? Foundations ? Special Cases Periodic "`Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or engi neer authorize changes to city approved plans? Yes ? (Listed Below) No ? Description and location of work completed: -kn i l ) ? a: 1 il 's 4. •' ?.i VfT_. !J? S y? r ri ' p ?V j )rf ]?t)` Clwl L" - C?Ch9L.'6?G P; .°?`.. ? l? " s[C• l?.l?.t ? LJr ??Sr ?.c 17f•;i ,.' .?? . i . /'.. { 1 . 1 o s /L b4W- ?r List tests performed: Are there any discrepancies noted from this day's observations? • Are there any outstanding discrepancies on this project? • If yes, see attached Summary Sheet. Yes ? No Yes /? Nc,7 f To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. m: Signed: Date: v 's3 ' F Print Full Name: I.D. No.: n is 6)euO White copy to Braun Intertec file. Blue copy to Project Site Representative. Providing engineering and environmental solutions since 1957 BRAUN City of `'• Date of This Report Project No.: ?A I NTE RTEC Special Inspection Daily Report Report No.: Project Name: Project Address: Client: Weather: Page _ of_ SIDRPT Client Project No.: Temperature: Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Rebar Placement ? Foundations ? Special Cases Periodic `Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or engineer authorize changes to city approved plans? Yes ? (Listed Below) No ? Description and location of work completed: 1 ; 1 1'/ ?t /, J- t tR 1 I 1 ? List tests performed: I:OCrr ??,• ,..1* _VJ `VC ?4 O'Y.? d~,n? ?crC :? 1A? I r n, ` • Are there any discrepancies noted from this day's observations? Yes ? No • Are there any outstanding discrepancies on this project? Yes ? No • If yes, see attached Summary Sheet To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/LIBC, except as noted above- Signed: li Date: Print Full Name: ff'v ?y<;./ r c I.D. No.: y ?? G? ' F"` White copy to Braun Intertec file. Blue copy to Project Site Representative. Providing engineering and environmental solutions since 1957 Page tof BRAUN INTERTEC SIDRPT Special Inspection Daily Report City of L=?,,nyo , lw .} Report No.: S k, f S n ( ?_ Date of This Report: 8 f 7 ' O %o Project Name: GGMAntA oo,-K to Project No.: L V ob - oo3(.?, i Project Address:__ 1n'X1S,.e (2?? Client: Zkk/S-4c'1t? R? Client Project No Weather Gam-.-r ! ('S kEga,-, Temperature: Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Reber Placement ? Foundations ? Special Cases Periodic Eir Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or engineer authorize changes to city approved plans? Yes ? (Listed Below) No ? De?s(:ription and location of work completed: 1 PC A& ,,Ic U , RoJ?s-- LQV2? ?D/ S'?`vcl?+.,rut tn?I?c.1 . Gr:?. f?-T ?-II 11 rt st "U+ocfer.Ped: C1 14 f^ jx:reda • Are there any discrepancies noted from this day's observations? Yes ? No ? • Are there any outstanding discrepancies on this project? Yes No ? S, ) f vw- s. • If yes, see attached Summary Sheet. v: }'22.ot J `%pi s r^' TJ ? 4 1$ To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. L,OO?% Ho Signed: tiOJ.? Date.: Print Full Name: `C\L.- rG: ,S,•ti•_ I.D. No.: 1 Oy"Z(o White copy to Braun Intertec file. Blue copy to Project Site Representative. Providing engineering and environmentat solutirms since 1957 Page \ of t 13RAU N SIDRPT INTERTEC Special Inspection Daily Report Report No.: Project Name: Project Address: Client: Weather: City of Lam vtiy? /S?v CAW u? S ??? `l Date of This Report: 9-2 3 -0t, C?1'mn?. _ _ l7aK 1 O Project No.: L V -'D In ^ 0 03 ?o Z?f Client Project No.: Temperature: Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Reber Placement ? Foundations ? Special Cases Periodic JW Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or engineer authorize changes to city approved plans? Yes ? (Listed Below) No ? De;scjption and location of work completed: e i S Y? r', ?_ ?_' % O'k 1Joae 11?at?'oNn v.?`?? f?i t'1L0? tlo ?Wl? nJ'? COwD??EO? • Are there any discrepancies noted from this day's observations? Yes ? No 1`5F • Are there any outstanding discrepancies on this project? Yes No ??,? ts? • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. Signed: --b- Date: Z3.Jrb Print Full Name: I.D. No.: eu Ny6Qi('-46 White copy to Braun Intertec file. Blue copy to Project Site Representative. Providing engineering and environmental solutions since 1957 BRAUN Page_ of SIDRPT INTERTEC Special Inspection Daily Report Report No.: Project Name: Project Address: Client: Weather: City of L?cti? Sj,r sh. .l S?? ?S? % vv.r']l Date of This Report: $'; (^ O to Project No.: L V-,x.^ chb?i fo ?? .J SyLk?z?Izu as F'wr% Client Project No.: Temperature: Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Reber Placement ? Foundations ? Special cases Periodic f9 Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or engineer authorize changes to city approved plans? Yes ? (Listed Below) No ? DeOption and location of work completed: '?QMU C, ?E?21 Gv. b A° ?l°I S ..rr..? r n.a nfF lMi ^ K? o e G r [? 3 - t i ckZ? r t ,? at cs 3 l2 i$ ?S'Lt,tS rSY3 ?ls ? lcc ?S4 - ?a r1 ,c.,?a.t.?.. Lied: • Are there any discrepancies noted from this day's observations? Yes ? No • Are there any outstanding discrepancies on this project? Yes No rr mt3 • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. Signed: Date: Q? 3 f 0(a Print Full Name: _a Ink Q` (q ?W- I.D. No.: j u (O? r°46 White copy to Braun Intertec file. Blue copy to Project Site Representative. Providing engineering and environmental solumms since 1957 Page 1 of I BRAUN SIDRPT INTERTEC Special Inspection Daily Report Report No.: Project Name: Project Address: City of t, 0,-.? M 11i 5M V.C'u!u S bW J Date of This Report 7 ^ 1^7r,..rJ 00.1F, to - Owl•.Q (3v'14. r Project No.: L V^ O(v- Oo %o ZA Client: -?LE'Qi 11L.1?Q Pwr?hG+l Client Project No. Weather: Temperature: Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Rebor Placement ? Foundations ? Special Cases .®ri'eriodic -PFiWelding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or engi neer authorize changes to city approved plans? Yes ? (Listed Below) No ? Description and location of work completed: C?_CkC/ 4!.!K 4 aj ct A ,.n ( /`mil at" too., c l`Jrt , c?_- t`Y-J List tests performed: • Are there any discrepancies noted from this day's observations? Yes ? No 91 • Are there any outstanding discrepancies on this project? Yes "a No ? I*fQpJ t-y3 • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. Q Signed: %. Date: (^,(?. Uto Print Full Name: _ %k-,,Lkq- GI.D. No.: v t o S'?E'a4 -~ White copy to Braun Intertec file. Blue copy to Project Site Representative. Providing engineering and environmental solutions since 1957 Page t of BRAUN SIDRPT INTERTEC Special Inspection Daily Report city of t=ic n,A Report No.: 5?{y`?'c f?tt I S ?§21 •`' Date of This Report: 9-19-0c, Project Name: G e':"'tk oak t7 Project No.: I V -or, - no 54,ZA Project Address: Client: ? G +hgm Client Project No.: Weather: Temperature: Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Rebor Placement ? Foundations ? Special Cases Periodic ..Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or engineer authorize changes to city approved plans? Yes ? (Listed Below) No ? PScription and location of work completed: t . fl - 3 f - t ! '3'r".l i*=- f od r - rt o C?.n!¢ Eec/? - 'J ? ?= -et- G„ ? G Z a,,.cSL f= q nt?4?S v? o? • Are there any discrepancies noted from this day's observations? Yes 9 No ? Peafo•+ to 3 • Are there any outstanding discrepancies on this project? Yes No ? • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of he current IBC/UBC, except as noted above. c'- Signed: Date: orc, Print Full Name: K6kV,.Q \ ?? ?9 r v T 4 - o? 0.?. I.D. No.: ! White copy to Braun Intertec file. Blue copy to Project Site Representative. Providing engineering and environmental solutions since 1957 Gi,. C t4' j `lt 2bSY ln.1G! + ?`iS e4,CfkF4.-A%.t.• Page \ of _21 BRAUN SIDRPT INTERTEC Special Inspection Daily Report Report No.: Project Name: Project Address: Client: Weather: City of Lac t`v`\ / 5'-'.C'4c.? i S+- t Y L Date of This Report: Project No.: ,. G'•-0 L.?J" l.Y " C7U)IcZ? -2rSa?t?scc???} Client Project No.: Temperature: Type of Inspection: Inspection Coverage: ? Continuous Q- Masonry ? Rebar Placement ? Foundations 421 Periodic Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils the architect or engineer authorize changes to city approved plans? Yes ? (Listed Below) No ? ? Special Cases D,esFription and location of work completed: -)__ O[1Y?.1 1f. ?..anw ??... ? ?i/Cg-}C?4 aP?C?g t- S?aQS? ?G.tJ '?C'?-QuE'/S o? Ca?ns{??? QQ ``r^te . 1 J?- "°? L ?t/f{ ?Cl?l L/ ?° ??) ?\?Lr?P tl?IA ?. w•i ,ALA V i4K?r +b\r-A o v Qn ti,a G.tn.,r>_ (40kr.1 IlAf 4o o,t n l ?c ) t + W "H-1 _ n t u ? i? xt n?b fc CG.yk PIlk n0i' et^.S4c_a ryQtn? pr2ceLJ • Are there any discrepancies noted from this day's observations? Yes No El Re.(or*'m 3 4-40 • Are there any outstanding discrepancies on this project? Yes No ? • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. Signed: Date: - I o- Z- OyO Print Full Name: P- I.D. No.: SN J rt ('? dto White copy to Braun Intertec file. Blue copy to Project Site Representative. Providing engineering and environmental solutions since 1957 Page ;_?Of SIDRPT2 BRAUN I NTE RTEC Continuation of Special Inspection Daily Report " City of .Ct? Cx Y--, Report No.: ct 1, {+o Dare of This Report: L" - .'? tv k-, Project Name: _ U /? GkL t i) Project No.: 003 6 Note v This is a continuation of a report. The first page of this report has information which should not be separated from this continuation) C .l 7?L1 ?'LS ? 4` IU V7 f ('n P T. , l r. n ,.? I LI ?- P1 ...a. e3 Q CIA P n 4 _ ?^I Se,° To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. Signed: ? --- Date: t?''??Qta Print Full Name: ?JL,2.t Pr?I.D. No: White copy to Braun fntertec file. Blue copy to Project Site Representative. Providing engineering and environmenml solutions since 1957 Page 1_ of L BRAUN SIDRPT INTERTEC Special Inspecti Daily Report Report No,: Project Name: Proied Address: Client: Cityof rti A I* I Date of This Report 1 -1 7-O 7 ?G Project No.: LL V-dfi ^ Gti = (a Weather: + n no Client Project No.: Temperature: Type oflnspection: Inspection Coverage- El Con -nuous dk ,E-l, Masonry 1 9-W ldi & B ? Rebor Placement ? ? Foundations ? Special Cases e ng olting Concrete Placement ? Fireproofing ? Piles $ Piers ? Tendon Placement ? Soils Did the architect or engineer authorize changes to city approved plans? Yes ? (Listed Below) No ? Description and location of work completed: List tests Performed_ L? • Are there any discrepancies noted from this day's observations? Yes ? No • Are there any outstanding discrepancies on this project? Yes ? No • If yes, see attached Summary Sheet_ To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. Signed: `- _ Date: Print Fu11 I.D. No.: C"Gy? 9`71 'J - White ropy to Braun intertec file. Blue copy to Project Site Representative. T/T:d 9S62S662S6:01 Providaig mgmeering and environmental sofutiuru since 1957 :WOJd IdWSO L002-6T- BRAUN' INTERTEC Summary of Discrepancies Needing Correction or Review by the Design Engineer or Architect Sheet _ of Project Name: Project Address: ?- r t v;. The following items must be reviewed or approved by the engineer and/or corrected and/or inspected before work can continue in the area. Report No. Report Date Description Resolution to Discrepancy O/C Status -l? ?h 15 S r v?q ?J 6I.??Q ??Q_? ?$ Q?'v.t%? t?taa ? Sidl2?a ?.S}e s l.?t trG°9? ? ?? 3 (ZQtk?r?utwf.4? ?t?$tt.? r?cLt:?°,reop a.ra.av.e? Gl?v'd LL n-Z 4 ` ?2tir.? ?}jS gv tau d If St(o We t A¢r1 0. Ft l ?t Al n jmk:mjs\f mWmrcp.2 1/10/95