Loading...
722 Marsh Ct - Engineering Release HoldC!ty of Eagan Project Name tt -x141 CO YE Address Project Number / Permit Number Legal Description: Lot 0 Block Section/Subdivision Parcel #: 1 4�S 7 - O (e o Reason For Hold: ig0 M M PC, /AN` C rD ArJ (.0 o1\3 CO n) T L Release Hold On: G:FORMS/Release of Hold 2'07 °72 MA tz- i & RELEASE OF HOLD Issuance of building permit Certificate of Occupancy Other (please explain) Hold Released By Date Reviewed by City En !neer Please return this form to Building Inspections. MAC -S Cvi. sip �cZ�c� G - I -`1 - ( 0 - 7 - 9 - Date INSULATION INSPECTION CHECKLIST FOR RESIDENTIAL BUILDING PERMITS PROPERTY LEGAL: I—err 63 R_AL.1 CrE 2, PROPERTY ADDRESS: 722. AR.S14 L-r: INSPECTOR: 1^A A3zhc. l tZEL�r�ty INSPECTION DATE: 1 d o a > - z z SITE GRADING 11 ❑ ❑ All slopes 3:1 or flatter? ❑ ❑ V Slopes steeper than 3:1 require retaining wall. Are retaining walls present? V I O ❑ Does grading conform to As -Built Grading Plan ( +/- 1 foot approximately)? E1 ❑ ❑ Does perimeter grading tie in well with adjacent properties /undisturbed land? ❑ ❑ IiI / Is there proper grading and /or drainage around Lookout or Egress Windows? EROSION CONTROL /0 ❑ Is Silt Fence (or approved equal) installed and in good working order? i ❑ ❑ Is Sod /Fiber Blanket installed behind curb? Si ❑ ❑ Is the Rock Construction Entrance /Driveway installed and in good working order (proper type /size of aggregate, clean -not covered with soil, etc.)? ❑ ❑ ❑ Is temporary vegetative cover w/ mulch present? ❑ ❑ ❑ Is permanent vegetative cover w/ or w/o mulch present? (circle one) 1 CITY EASEMENTS AND UTILITIES �1 ❑ ❑ Are all easements clear -no part of any building /deck/porch /retaining wall /etc. / encroaching in easement? l�f ❑ ❑ Are catch basins present within the property or in the street in front of the property, if so are they clean, do they have the proper erosion control in and /or around them? ❑ Does the property have an Emergency Over Flow (EOF)? This can be found on the Certificate of Survey. If so, is it present and has it been graded properly? MISCELLANEOUS ITEMS ❑ 1 ❑ Is there tracking present on Public Right -of- Way /Street from construction site? 2( ❑ Is the driveway at the proper width at ROW line? (22 ft. max.)(Curb stop is at ROW line) 31 ❑ Is the site clean, no trash and /or construction debris lying around? ( ❑ ❑ Was the proper type of building constructed according to the approved grading plans? (LO, WO, FB, R, etc.)