610 Opperman Dr - 2010-07-15 Excavation Permit for Work within the County ROWGopher State One Call
651.454.0002
48 hours before digging
1. The Permit Office shall be notified at least 48 hours in advance of the actual start of work in the right of way. The
completed project must be final inspected within 5 working days or a delay penalty may apply. Permit Office phone
number: 952.891.7115.
2. To obtain a permit, the contractor must be registered and have a certificate of insurance on file with Dakota County.
3. If the work needs to be done in the roadway, a traffic control plan must be included with this request.
Application is hereby made for permission to grade, construct, place along or across County Highway No. 28 from MN149 give
reference to nearest crossroad or land lines in accordance with a sketch attached with this application. The project is located
in town or city of Eagan.
Brief Description of Work: Water Service
I. Work to starts on Jul 15, 2010 and be completed by Jul 20, 2010
II. The applicant in carrying out any and all of the work mentioned or referred to in its application and in the Permit issued
here, shall strictly conform to the terms of the Permit, the Special Provisions and the regulations in the Dakota County Right
of Way Ordinance, all of which are made a part of this Permit. The applicant agrees to be bound by all of the terms of this
Permit. The applicant shall comply with the regulations of all other government agencies for the protection of the public as
they apply to the work performed. The work shall be accomplished in a manner that will not be detrimental to the highway
and that will safeguard the public.
Dated this 15 day of July, 2010. Thomson - Rueter
John Caroon (651) 224 -6299
Contact Name Telephone Number
Address 251 Starkey Street St Paul MN 55107
John Caroon
Contractor Name Contact Name
Address 251 Starkey Street , St Paul MN 55107
Telephone Number: Cell Phone Number:
Name and phone of person in charge of construction if other:
Company Name: Carl Bolander and Sons
Applicant's signature: John Caroon Date: 07/15/2010
A COPY OF THIS PERMIT IS REQUIRED TO BE ON THE JOBSITE AND IS NOT VALID UNTIL IT IS APPROVED & SIGNED.
General ExcavationROW. rpt
7; /a Off6--1/2'hq ni
DAKOTA COUNTY TRANSPORTATION
Permits Office
14955 Galaxie Avenue
Apple Valley, MN 55124 -8570
Phone: 952.891.7115 Fax: 952.891.7127
hiphwavpermits anco.dakota.mn.us
GENERAL EXCAVATION PERMIT
FOR WORK WITHIN THE COUNTY HIGHWAY RIGHT OF WAY
Work being done for (owner)
Permits No. 4660
Permit Fee: $320.00
GENERAL
I. Except as otherwise permitted, construction work on county highway right of way shall not commence until an application for a Permit has been made and
such Permit granted. The Permit sketch shall show the location of the proposed construction work with reference to county highway centerline and highway
right of way line. The proper right of way width should be indicated. A copy of the sketch shall be provided for each copy of such Permit.
II. Burning or disking operations and /or the use of chemicals to control or kill trees, brush and other vegetation is prohibited without prior approval from the
County Engineer.
III. All waterways and lines of drainage shall remain operative.
Rules and Regulations for Work on County Highways
IV. Wherever topsoil and sod are disturbed they shall be replaced and maintained satisfactorily until the turf is established.
V. When necessary, barricades, warning devices and flagmen shall be provided by the contractor during all phases of their construction and maintenance
operations on county highway right of way. The design and placement of all signs, barricades, and other warning devices shall conform to the current
Minnesota Manual on Uniform Traffic Control Devices.
VI. At the time of construction and at the times of subsequent maintenance, prior approval shall be obtained from the County Transportation Department for
the cutting and trimming of trees within the county highway right of way. Wherever trees are cut the resulting stumps shall be removed unless otherwise
provided in the Special Provisions of the Permit. Any holes caused by stump removal shall be backfilled, are leveled and all materials associated therewith
disposed of outside the county highway right of way. The contractor shall advise the County Transportation Department at least 48 hours in advance of its
intent to start clearing and grubbing operations.
VII. The City shall notify the Transportation Department of its intent to perform service and maintenance operations which will interfere with the flow of traffic
on county highways, and shall obtain approval prior to performing such operations. However, the City may perform service and maintenance operations on
county highways including opening and disturbing the surface of the right of way without prior approval in those instances where an emergency exists that is
dangerous to the life or safety of the public and which requires immediate repair. The city shall take all necessary and reasonable safety measures to protect
the traveling public and shall within two business days after the occurrence apply for the necessary permit. A permit is not required if the repair is caused by
another permittee's work in the right of way.
VIII. The Applicant, Contractor, Development owner(s) and /or the City or Township shall maintain ownership of and assume all liability for, and save the
County, its agents and employees, harmless from, any and all claims for damages, actions or causes of action arising out of the work to be done herein and
the continuing uses of the same, including but not limited to the placing, constructing, reconstructing, maintaining and using of any facilities constructed under
this application and Permit.
IX. The County may require the applicant, or its contractor to furnish a deposit in the form of a certified check, a surety bond or corporate undertaking, in favor
of Dakota County, for any expense incurred by the County in the repairing of damage to any portion of the county highway right of way caused by work
performed under a Permit, including any out of the ordinary engineering supervision and inspection expense provided by the county. In those instances
wherein a deposit is required, the amount of the deposit shall be specified in the Special Provisions of the Permit. If a check is furnished, any monies
remaining over the above such expense shall be returned to the applicant.
X. The Permit as issued does not in any way imply an easement on public or private property. The Permit does not convey any property rights within the
highway right of way to the permittee. If the highway right of way covered by this Permit needs to be used or changed, the county or its assigns may remove ,
change, or destroy the improvements described in this Permit without any obligation to the permittee or its assigns to restore the improvements or pay any
damages.
XI. The installations shall be made in conformity with all applicable laws, regulations and codes covering said installations. All installations shall be made in
conformity with regulations of governmental agencies for the protection of the public.
XII. Upon completion of the work, the county highway right of way shall be immediately restore to its original condition or better. The County Transportation
Department shall be notified within 5 working days so that a final inspection can be made to determine its acceptability.
OPEN TRENCH
Open trenching in roadbeds maybe allowed only after adequate justification. The Trench will not be allowed to remain open overnight. Excavations shall be
tamped for compaction, backfilled and restored to MN /DOT Specifications using class 5 aggregate equal to or greater than existed. Bituminous surfaced
roadways shall be patched with hot mixed bituminous material of equal or greater quality than the existing surface.
UNDERGROUND
It. All crossings made in the roadbeds of county highways shall be made by boring inside a casing or carrier pipe, by jacking, or by directional boring unless
this procedure is modified in the Special Provisions of the Permit. The auger shall not lead the casing or carrier pipe by more than one inch.
m.
II. At a minimum, bore pits shall be restricted to the area from 5 feet beyond the shoulder of the road, except as modified in the Special Provisions of the
Permit.
III. When pipes with bells or flanges are installed, the crossings of the county highway shall be made by boring inside a conduit as provided in paragraph I of
this section or jacking a conduit of sufficient diameter to permit threading the carrier pipe through it.
IV. All voids caused by jacking or boring shall be filled by pressure grouting. The grout material shall consist of a sand - cement slurry of at least two sacks of
cement per cubic yard and a minimum of water to assure satisfactory placement.
V. The underground utilities shall be so installed as virtually to preclude any necessity for disturbing the roadbeds to perform maintenance operations.
VI. Underground installations shall be accomplished without damaging or destroying the principal root structure of specimen trees.
GeneralExcavationROW.rpt
In accordance with the application herein, a Permit for Work in County Highway Right of Way is granted to Thomson - Rueter to
grade, construct, place along or across County Highway No. 28 in the location(s) described on a sketch which is a part of said
application, or in such location as may be specified by the County Transportation Department in the Special Provisions hereof.
Brief description of work: Water Service
SPECIAL PROVISIONS:
DAKOTA COUNTY TRANSPORTATION
GENERAL EXCAVATION PERMIT FOR WORK WITHIN COUNTY HIGHWAY RIGHT OF WAY
1. Prior to removal of any existing turf, all necessary Erosion Control Devices shall be in place. Wherever topsoil and /or
sod are distributed they shall be replaced within a maximium of SEVEN days or in accordance with the NPDES Permit
- if applicable, and maintained satisfactorily until the new turf is established. In addition, all work shall be in compliance
with local, state and federal regulations.
2. All grading work, such as excavation, sub - cutting, backfilling, topsoil, seeding, sod, etc., shall be done in accordance
with the MN /DOT Standard Specifications for Highway Construction, Current Edition.
3.
Sub grade shall have an 18" minimum depth of sand or granular material under the road.
4. Class 5 base shall be replaced to a minimum depth of 9 inches or as found and compacted in accordance with
MN /DOT Specification, Current Edition. Compaction shall be by the specified density method.
5 Bituminous surfacing shall be replaced to a minimum depth of 6 inches or as found and installed in accordance with
MN /DOT's combined Specification 2350 / 2360 asphalt pavement. (4 inches of base and 2 inches wear.)
6. If it appears that this project will require work within the traveled portion of the roadway or shoulder, the permittee must
submit a traffic management plan along with the permit application. This plan should incorporate whatever signs
and /or flagmen the Contractor will be required to utilize and the Contractor's proposed work operation as it affects
traffic on the County Road. This plan must be approved at least 24 hours in advance of any work in the roadway. A
minimum of two weeks prior public notification is required if a detour is needed. The permittee must also notifiy and
coordinate this work with local police and fire departments. No lane closures are permitted during rush hour time from :
6:00 a.m. to 8:30 a.m. and from 3:30 p.m. to 6:00 p.m. without prior approval in the following cities: Apple Valley,
Burnsville, Eagan, Farmington, Hastings, Inver Grove Heights, Lakeville, Mendota, Mendota Heights, Rosemount,
South Saint Paul, Sunfish Lake and West Saint Paul.
7. The County shall in no way be responsible for damages to an irrigation system from highway maintenance or signing
activities or any other cause. The applicant agrees not to operate the sprinkling system during frost or freezing
conditions with over spay would cause ice conditions on the roadways or sidewalks and will suspend sprinkling when
pedestrian activity is present.
Other Requirements: Layout must follow traffic control manual.
APPROVED BY:
Dakota County Transportation Department
Jul 15, 2010
Issue Date
General Excavation ROW. rpt
Permit No. 4660
Jul 20, 2010
Expiration Date
St Paul, MN 55107
Email: johnc @bolander.com
Phone: (651) 224 -6299
General Excavation ROW. rpt
DAKOTA COUNTY TRANSPORTATION
Permits Office
14955 Galaxie Avenue
Apple Valley, MN 55124 -8570
Phone: 952.891.7115 Fax: 952.891.7127
www.co.dakota.mn.us/doinqbusiness/permits/highwav
PERMIT INVOICE
Date Issued: 07/15/2010 Please pay the following amount:
Applicant Name: John Caroon
Company Name: Carl Bolander and Sons Payment Method: CK
Address: 251 Starkey Street Payment Received by:
INVOICE NO. 4660
$320.00