Loading...
2067 Opal Dr - COCCity of Eapil COMPLIANCE WI III INITIAL INSPEC HON #' Ihis is to certify that the property listed above has been inspected by authorized City personnel on S - 201 and found to be in compliance with Section 3 40 of the City Code and no corrective work was required COMPLIANCE AFTER CORRECI'VE WORK PERFORMED n This is to certify that the property listed above has been found to be in compliance with Section 3 40 of the City Code after satisfactorily completing the required corrective repair work under (check all that apply): n City Sanitary Sewer Permit n City Plumbing Permit NOTE r Applicable only if box is checked: - .Based on a review of the Sewer Service video inspection /report on file, it is recommended that • < aning or future inspections be performed to minimize a potenti l blockage due to: Grease Build -u i Root Intrus'• • Dip /Settlement in Pipe, Other: 1B, Cc 3 S 6. 4- -S City Approved: lr White Copy: Property Owner SANITARY SEWER SYSTEM CERTIFICATE OF COMPLIANCE for INFLOW & INFILTRATION City of Eagan, Minnesota Property Address: (on Q �� ic■ V �' Print name Signature Yellow Copy: City of Eagan (Parcel File) City of Eapli l —14 l J Date rev 2 23.2010