Loading...
2036 Opal Pl - COCCity of hp SANITARY SEWER SYSTEM CERTIFICATE OF COMPLIANCE for INFLOW & INFILTRATION City of p' City of Eagan, Minnesota Property Address: C' 5 0 p e, . P COMPLIANCE WITH INITIAL INSPECTION 3`his is to certify that the property listed above has been inspected by authorized City personnel on 5.`a , 201 L and found to be in compliance with Section .3.40 of the City Code and no corrective work was required. [J City Sanitary Sewer Permit COMPLIANCE AFIER CORRECIIVE WORK PERFORMED n This is to certify that the property listed above has been found to be in compliance with Section 3 40 of the City Code after satisfactorily completing the required corrective repair work under (check all that apply): n City Plumbing Permit White Copy: Property Owner NOTE: Applicable only if box recommende Grease Buil a periodic c� Root Inirus is checkedrBased on a review of the Sewer Service video inspection /report on file, it is big or future inspections be performed to minimize a potential blockage due to:. - 7 ip /Settlement in Pipe, Other:. 9 6 • City Approved: VVA , LL (-if-- / / t Print name Signature Date Yellow Copy: City of Eagan (Parcel File) rev 2.23, 2010