2019 Zircon Lane - COCCity of Eapn
SANITARY SEWER SYSTEM
CERTIFICATE OF COMPLIANNCE for
INFLOW & INFILTRATION
411 City of hp
City of Eagan, Minnesota
Property Address: a Zt V.
COMPLIANCE WITH INITIAL INSPECTION
This is to certify that the property listed above has been inspected by authorized City personnel on c , 2010
and found to be in compliance with Section 3.40 of the City Code and no corrective work was required.
COMPLIANCE AFTER CORRECTIVE WORK PERFORMED
This is to certify that the property listed above has been found to be in compliance with Section 3 40 of the City Code
after satisfactorily completing the required corrective repair work under (check all that apply):
n City Sanitary Sewer Permit
City Approved: l 1Nl
Print name
NOTE: Applicable only if box is checked. ased on a review of the Sewer Service video inspection /report on file, it is
recommended that ► ' ''' ' leaning or future inspections be performed to minimize a otential blockage due to:
Grease Build -up, Root Intrusion, ip /Settlement in Pipe, Others 8) _5 FA--
, - •
White Copy: Property Owner
City Plumbing Permit
Signature
Yellow Copy: City of Eagan (Parcel File)
Date
rev 2 23 2010