Loading...
3232 Denmark AveCity of Eagan G° 3830 Pilot Knob Rd Eagan, MN 55122 (651) 675 -5675 www.ci.eagan.mn.us Site Address: 3200 Denmark Ave Lot: Block: Addition: PID: Use: USPS Fee Summary: Contractor: Gray Construction 10 Quality Street Lexington KY 40507 (859) 281 -5000 Base Fee - $2.50 sq. ft. Applicant/Permitee: Signature - Applicant - PERMIT City of Eaaan Description: Sub Type: Pylon Work Type: New Feet Inches Description: PlasticNinyl Graphics Length: 7 9 Height: 10 0 Sign Message: Width: 1 6 UNITED STATES POSTAL SERVICE Business Mail Entry Unit SqFt: 77.50 Location: Setback: MINIMUM 10' FROM PROPERTY LINES 40' E. of Setback: Min. 10' from PL Denmark/50' N. of Home Depot entrance. Elevation: 0 Zoning: Electric: Y Double: Y Comments: PLEASE CALL FOR INSPECTION (651) 675 -5690 OR (651) 675 -5678. Total: $193.75 Permit Type: Sign Permit Number: EA095142 Date Issued: 07/28/2010 $193.75 0720.4089 Owner: United States Postal Service 3165 Lexington Avenue Eagan MN 55121 I hereby acknowledge that I have read this application and state that the 'nformation is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Issued By: Signature • .;. • City of Eaaall 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675 -5675 Fax: (651) 675 -5694 x Applicant's Printed Name JUL 26Re Date Received: Staff: I hereby acknowledge that I have read this application, state the application is correct, and agree to comply with Eagan, MN laws regulating construction and placement. x Applicant's Signature Use BLUE or BLACK Ink Permit #: Permit Fee: 1 q . / 2010 SIGN PERMIT APPLICATION Submit two (2) copies of drawing showing proposed sign and site plan or building elevation showing location on property. Pylon signs are a Conditional Use and subject to all conditions, regulations, and fees required for conditional uses. Temporary Advertising signs -- complete both sides of the application. Awning Building Canopy Construction Lease Monument X Pylon Temporary Other Feet Length 7' Feet 9 3/8" x Height 10' x Inches Inches 0" 1 ?.5 Total Square Feet: SF UNITED STATES POSTAL SERVICE Sign Message: Business Mail Entry Unit Feet x Depth 1' x Inches 6 1/4" Location on Structure: -Eiteccim=balt trnN RI PRana PROP Setback: 40' E. of Denmark / 50' N. or home Depot entrance Elevation: J am_ Temporary Use Days X Has Electricity X Is Double Faced Date: 7 / 21 / 10 Applicant is: Owner B Address where sign is to be located: Denmark Ave. Tenant or Business Name: United States Postal Service Tenant X Sign Company / Contractor Tenant Contact Name: Joe Cherrier, Maintenance Manager Telephone #: 651 - 681 -2120 Sign Company / Contractor: Gray Construction Address: 10 Quality St. City: Lexington Telephone #: 859 281 - 5000 State: KY Zip: 40507 Property Owner: United States Postal Service Telephone #: Address: 3165 Lexington Ave. South City: Eagan State: MN Zip: 55121 CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454 -0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.orq Fee: $25.00 # of Signs: (maximum of 3) Person responsible for placement / removal of sign: Telephone #: 2010 TEMPORARY SIGN PERMIT FOR SPECIAL BUSINESS SALES Sizes of the Sign(s): 1. 2. 3. • Total Sq. Ft. of all signs: (All 3 signs cannot exceed 25 sq.ft.) Sign Permit Expiration Date: • Sign permit(s) expires 60 days from first day of placement. 10 Days Sign(s) Are To Be Placed: Sign(s) will be attached to: building elevation pylon monument • Signs must be attached to the building or to an existing monument or pylon sign. DO NOT WRITE BELOW THIS LINE First Day of Placement: • Signs can be placed for 10 days out of a 60 -day period which commences the first day a sign is placed. Sign(s) will be attached using the following method: • Signs must be placed securely and in a sound manner to ensure safety of the public & in accordance with reasonable standards employed by sign makers. Management Co. (if applicable) Telephone #: Approval of the building Owner or Management Company may be required. Check your lease or call your Management Company for additional information. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454 - 0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.Qopherstateonecall.orq This drawing. including graph,c layout and technical details is the property cif Transworld Signs Inc and cannol be reproduced, copied or used without widen authonzahon from Transworld S,gns Inc 555 Hall, Renfrew, Ontario K7V 3Z4 Phone' (888,830-8030 Fax. (613)432-8578 E- mail. Iwsinfo transworldslgns corn No Revisions X X X X X X Description Date By Drawn BY R. Trudel Acc Exec Address X 810 MONUMENT SIGN Work Order X Page 1 OF 2 Date August 14, 2007 File B10 Monument.cdr 9 8 4'-6' 11 1 N G v m m 0 0 1 T 3' -3 1/4' 0 N rn m 10'-0" 9 3 -3 114" 6" -8 3/4' 6-8 3/4' 16" • • • • 1 1/4" 7-1/T L r W th V 0 � 0 mz m m -n 0 33 0 0 rn � rn � 0 m ,8/E 31VDS aNN MMI NM 5701Wi( euaniw fit • 667.71 27.360 5f g's LAN 2 O n CD P 1 j a I.F.XINGTON AVF.NIIF 82 m x x x x x x 07 -28 -10 Jon and Mike R asked that I at least try to get them to comply with the monument standards, or if that isn't possible, get them to apply for a sign permit for the pylon. Chet Harrison called. They want an approx. 10 x 8 sign on Denmark and a 3 x 5 directional on Lexington. Gave him setbacks, told him directional is ok. I explained to Chet Harrison, Civil Engineer from Transystems (651- 216 -4755, ciharrison@transystems.com) that a CUP would be needed for a sign of that height; he said they are an entity all their own and wouldn't do it. I said the height should be reduced to 7'; he said they likely wouldn't do it but he'd get back to me. I said at the minimum, a sign permit is required. Aaron from Gray Construction called. They will submit a sign permit and fee. Received permit and fee. Discussed this application with Mike Lence. Pylons require a CUP, sign permit, building permit and engineer drawings. But because it's the USPS, they weren't accepting of making the necessary applications and getting the necessary approvals for their sign. Mike reviewed the footing, commenting he is not an engineer so his review is basic and cursory. I reviewed the sign permit application and approved it as presented. mg LOGISMap Output Page Page 1 of 1 efJ�fi - // % r /'�nj Mao oeled wort MASS Copmp l LO(L http://gis.logis.org/LOGIS_ArcIMS/ims?ServiceName=ea_LOGISMap O V SDE &ClientV ersion= 4.0 &Fo... 7/28/2010 Mary Granley From: Jon Hohenstein Sent: Thursday, July 22, 2010 3:30 PM To: Mike Ridley; Mary Granley Subject: RE: Fax on Post Facility signage There's rarely any harm in the asking. Good job and good to hear. Thanks. From: Mike Ridley Sent: Thursday, July 22, 2010 3:28 PM To: Mary Granley; Jon Hohenstein Subject: RE: Fax on Post Facility signage Score! Original Message From: Mary Granley Sent: Thursday, July 22, 2010 3:01 PM To: Jon Hohenstein; Mike Ridley Subject: RE: Fax on Post Facility signage Jon and Mike, Sometimes, things go right in amazing ways. Aaron from Gray Construction just called. He is sending in a sign permit and fee to my attention in today's mail. Mary Granley I Senior Code Enforcement Technician I City of Eagan City Hall 1 3830 Pilot Knob Road I Eagan, MN 55122 1 (651) 675 -5690 1 (651) 675 -5694 (Fax) 1 mgranley @cityofeagan.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND /OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. Original Message From: Jon Hohenstein Sent: Friday, July 16, 2010 3:36 PM To: Mary Granley; Mike Ridley Subject: RE: Fax on Post Facility signage Roger that. Jon Hohenstein 1 Director of Community Development 1 City of Eagan City Hall 1 3830 Pilot Knob Road Eagan, MN 55122 1 651 - 675 -5653 1 651- 675 -5694 (Fax) 1 jhohenstein @cityofeagan.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND /OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. 1 Original Message From: Mary Granley Sent: Friday, July 16, 2010 3:31 PM To: Mary Granley; Jon Hohenstein; Mike Ridley Subject: RE: Fax on Post Facility signage I did my part. If they cough up the $193.75 and permit, I'll be delighted and you'll be the first to know. Mary Granley 1 Senior Code Enforcement Technician 1 City of Eagan City Hall 1 3830 Pilot Knob Road 1 Eagan, MN 55122 1 (651) 675 -5690 1 (651) 675 -5694 (Fax) 1 mgranley @cityofeagan.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND /OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. Original Message From: Mary Granley Sent: Friday, July 16, 2010 3:14 PM To: Jon Hohenstein; Mike Ridley Subject: RE: Fax on Post Facility signage I gave him the whole 9 yards. I just got to hear about how they built a 600,000 s.f. building without any permits from the city and he doubts the "tribal community" of the federal government is going to start now. BUT, he did agree to take a sign permit I'm emailing to him over to the general contractor and ask that it be filled out and paid for. He isn't sure they'll do it, but it's worth a try. Mary Granley 1 Senior Code Enforcement Technician 1 City of Eagan City Hall 1 3830 Pilot Knob Road 1 Eagan, MN 55122 1 (651) 675 - 5690 1 (651) 675 - 5694 (Fax) 1 mgranley @cityofeagan.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND /OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. Original Message From: Jon Hohenstein Sent: Friday, July 16, 2010 2:51 PM To: Mike Ridley; Mary Granley Subject: RE: Fax on Post Facility signage Mike, Good points. I have no heartburn on the size either for the reason you note and we made our big picture deal back when they blinked and agreed to the road connection, but there's no harm in the asking. Mary, 2 Get back to Mr. Engineer and let him know how a 10' sign would be considered for a private project and see if they will do the CUP. Whether they will or won't, shoot for the permit fee. Thanks. Jon Jon Hohenstein 1 Director of Community Development 1 City of Eagan City Hall 1 3830 Pilot Knob Road 1 Eagan, MN 55122 1 651- 675 -5653 1 651- 675 -5694 (Fax) 1 jhohenstein @cityofeagan.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND /OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. Original Message From: Mike Ridley Sent: Friday, July 16, 2010 2:47 PM To: Jon Hohenstein; Mary Granley Subject: RE: Fax on Post Facility signage I agree we should definitely go after the permit fee. As to the size of the Denmark sign, it doesn't give me any heartburn at all; that is one massive facility and we're getting Denmark connected at their expense. Original Message From: Jon Hohenstein Sent: Friday, July 16, 2010 2:43 PM To: Mary Granley; Mike Ridley Subject: RE: Fax on Post Facility signage Mary, Based on our past experience, I suspect that we cannot force them to conform, but I wouldn't give up on the permit fee. We may or may not get it, but they did pay for their land use application. You might even tell them that it is permitted if they get a CUP for a pylon. See how that flies. Mike, Do you concur or do you have a different take? Jon Jon Hohenstein 1 Director of Community Development 1 City of Eagan City Hall 1 3830 Pilot Knob Road Eagan, MN 55122 1 651- 675 -5653 1 651- 675 -5694 (Fax) 1 jhohenstein @cityofeagan.com 3 THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND /OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. Original Message From: Mary Granley Sent: Friday, July 16, 2010 2:38 PM To: Jon Hohenstein; Mike Ridley Subject: FW: Fax on Post Facility signage Jon and Mike, Attached is the plan submitted for the Postal Facility signage. One sign to be placed at the Denmark entrance to the facility is 10' high x approx 8' wide (sign B10). The other sign is a 3'x 5' directional to be placed at the Lexington entrance (sign K6). I gave the contact the requirements for signage, and told him the directional was fine but the entrance sign should be 7' max. He is a civil engineer and explained his dilemma working with the postal facility and them doing as they saw fit. I told him I understood completely. I gave him setback info and he said he could meet that. I'll expect then that the signage will be as they presented in the plan, and I won't see any permits. Let me know if I should expect otherwise. Mary Granley 1 Senior Code Enforcement Technician 1 City of Eagan City Hall 1 3830 Pilot Knob Road ( Eagan, MN 55122 1 (651) 675 -5690 1 (651) 675 -5694 (Fax) 1 mgranley @cityofeagan.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND /OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. Original Message From: Connie Edwards Sent: Friday, July 16, 2010 1:55 PM To: Mary Granley Subject: Fax The message is ready to be sent with the following file or link attachments: 20100716_123429 Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled. 4 Erin Taylor Subject: FW: USPS Eagan MN = City of Eagan Sign requirements Importance: High From: Mary Granley [ mailto:MGranley @cityofeagan.com] Sent: Friday, July 16, 2010 3:24 PM To: MN- Chester Harrison Subject: Sign requirements Chet, Thanks for contacting me about the pylon sign for the postal facility. I reviewed your plan. Typically, a private project would require a Conditional Use Permit with Council approval for a pylon over 7' in height at the Denmark location. I realize the postal facility is an entity all its own though, so it would be exceptional if we could keep things compliant with City Code by meeting the 10' setbacks from all property lines, and get a sign permit and fee ($193.75) for the pylon sign to keep things in order at our end. The directional on Lexington is fine as presented, no permit requirement on that one. Thanks for your assistance, and have a pleasant weekend. Mary Granley 1 Senior Code Enforcement Technician 1 City of Eagan City Hall 1 3830 Pilot Knob Road 1 Eagan, MN 55122 1 (651) 675 -5690 1 (651) 675- 5694 (Fax) maranlev(citvofeaaan.com 7/22/2010 THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND /OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. Page 1 of 1 llse BLUE tu BU4CK tnk ; For Office Use ----�f.^--1 ((��• ���i 3� � U��� ���� �� i Permit#: . o i � ! 3830 Pilot Knob Road � � 1'ermit Fee: �Q�. � � � Eagan MN 55122 � � - � �`' � Date Received:� ' �"J ���"7 � Phone:(651)675-5675 . � j Fax:(651)6�5-5694 r �:;:, � Staif: � � 3�3a- -----------------� 2015 COMMERCIAL. PLUMBING PERMiT APPL.ICATIQN ❑ Plea e submlt two(2)sets of plans with ali co erciat appiications. Date: � �-" c Site Address: �� �� �---1 �v '�--� Tenant• �rJ r t'• trC �'�1 °� 1.'tr` Suite�• Praperty �/'�+ � j � � �Wll@f Name: � `� `•✓�-�� Phone: SL �� r �� Name: � � ' �Cs� f Ih 011� License#: ��sVd-(� C011tl'8Ct0� Address: �L"1 �� �. �' O t V C-'�ty._ � State� Zip:� ��� Phone Email: �.' �� �l � . � '��� .,����W�� �New �Replacement Repair �Rebuild _Modify Space _Wor1c in R.O.W. Descriptian of work: e � � COMMERCIAL New CanstrucYron ____Modify Space �S f— �`��y' _Irrigation System(_yes/_no}(_RPZ/^PVB) • Rain sensors required on irrigation systems �°i�-' �_� � Perrttit Type . Ave.GPM �2"turbo required uniess smalier size aflowed by Public Works) J Meters Call(657)675-5646 to verity that tests passed prior to picking uo meter. �j l � �� Domestic:Slze&Type Fire: 1 Avg.GPM High d�nand devices? Yes No Flushometers Yes No COMMERCIAt FEES Contract Value$ ���� x.01 $60.00 Permit Fee Minimum,inciudes State Surcharge _$ P�lt�� "If contract value is GREATER than$2,010,Surcharge=Cont�act Value x$0.0005 =$ Surcharge* If the praject valuation is over$1 miilion,please catl for Surcharge /'� _$ [✓ � TOTAL FEE Foliowing fees apply when instat{i�g a new lawn irrigat�on system $ Water Pem�d Contact the Gty's Englneering Department,(651)675-5646,for requirec3 fee ama�rrts. $ Treatrnerrt F'IaM $ Wate�Supply&Stc�rage $ State Surc�arge =$ TOTAl..FEE CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against urzderground utility damage. � I hereby acknovvledge that thfs InMrmafion ts compiete ancf axurate;that the wu►k wrilt be in conformar�e with the ordinances arxl�c�ttie Gity of Eagan; that i understand this is not a permit, but only an application far a perm�, and is not to start without a pprmit; �at U�e w�k wii(6e in accordance with the approved plan fn the case ot v�rork which requires a review and approv 1 ans. x�L?�l0'1/'�-� �t/'� t_!'� x ��� AppiicanYs PriMed Name caM's 3ignature FQR OFFICE USE APNroved By: Date:� Required inspections: Under Ground Rough-In �,Air Test Gas Test Fina1 PRV Required:�Ye� No Meter Retated Items: Metec Size Radio Read" Manorneter Staff: Page 1 of 3