2009 COMMERCIAL BUILDING PERMIT APPLICATION
Date: 1 DI 2A oc\ Site Address:C SO l N T R. L p P52tw A -`c.
Tenant Name: (Ill L of- EA— ,j
(Tenant is: New / Existing) Suite #:
Former Tenant:' t4f 8L W04ret—Tett
PROPERTY OWNER
Name:
Phone: )( S 3 2c(
Address / City / Zip:
Applicant is: Owner Contractor
TYPE OF WORK
Description of work: QE ST /� 00 r"
Construction Cost:
rIOQ0
P RJB LToAd S -`OA) LTOR £
2-1
CONTRACTOR
Name: GT I" A 0 A -G P-, (Qo ) License #:
Address: 35-6 1 Ldp 1 dk"'
City: t%A
State: M N Zip: 56(T2-
Phone:
StZZ
Phone: C S 2,-`1 Contact Person: T P L 6 Q -A-146
ARCHITECT /
ENGINEER
pg -M11-1174 I.rb
Name: AN o P- L�-i-o��Jie Es
Address: jO 1 M MN ITDgA P VE- '5 -
Registration #: 14 ft �J
City: WM/7_,A-ri1/4
Phone: C 2_ i S -
State: M N • Zip: 55311
Contact Person: AIU
Licensed plumber installing new sewer/water service: %U 115G14 VIL LE, CO-- Phone #: %%3 " 4q7• 414z-
OTE:
142
OTE: Plans and supporting documents that you submit are considered to be publi!cinformation. P
he information may be classified as non-public if you provide specific reasons that would permit t
conclude that they are trade secrets.
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and
codes of the City of Eagan; that I underst
permit;
that the work will be in accordance
x i_. C7 ( ikH am
Applicant's Printed Name
tljizjsA t a permit, but, my an application for a permit, and work is not to start without a
rt -e0 jia`n)tll case of whicvires a review and approval of plans.
pk
OCT 2.1 ietri
x
Applicant's Signature
Page 1 of 3
DO NOT WRITE BELOW THIS LINE
SUB TYPES
Foundation
Apartments
Lodging
Miscellaneous
WORK TYPES
✓ New
Addition
Alteration
Replace
Retaining Wall
/ Public Facility
Commercial / Industrial
_ Greenhouse / Tent
Antennae
Interior Improvement
Exterior Improvement
Repair
Water Damage
DESCRIPTION
Valuation Lube--. f1P-v1
Plan Review tib
leo%
Census Code
# of Units
# of Buildings
Type of Construction V • P�
O
REQUIRED INSPECTIONS
✓ Footings (New Building)
Footings (Deck)
Footings (Addition)
Foundation
Drain Tile
Occupancy
Code Edition
Zoning
Stories
Square Feet
Length
Width
Accessory Building
Exterior Alteration -Apartments
Exterior Alteration -Commercial
Exterior Alteration -Public Facility
Siding _ Demolish Building*
Reroof Demolish Interior
Windows Demolish Foundation
Fire Repair
Salon Owner Change
*Demolition of entire building — give PCA handout to applicant
ft -3 `''1
2vo7 Nt RG
7Y
1
2`553
/ Roof: _Decking ,Insulation i Ice & Water `'Final
v Framing
Fireplace: _Rough In _Air Test Final
VI Insulation
Meter Size:
Final CIO Inspection: Schedule Fire Marshal to be present:
Reviewed By: (.e1144. , Building Inspector
MCES System
SAC Units
City Water
Booster Pump
PRV
Fire Sprinklers
Sheetrock
Final / C.O. Required
Final / No C.O. Required
HVAC
Other:
Pool: _Footings _Air/Gas Tests _Final
Siding: _Stucco Lath _Stone Lath _Brick
Windows
Retaining Wall
Erosion Control
Yes '/No
Reviewed By: kf-.4<fI 1
Planning
COMMERCIAL FEES
Base Fee
Surcharge (37 •SD
Plan Review 0 • DO
MCES SAC g' a of . e--6
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication
Trail Dedication
0.DD
Water Quality
to. e 0
O•SD
Water Quality
Water Supply & Storage (WAC)
Storm Sewer Trunk
Sewer Trunk
Water Trunk
Street Lateral
Street
Water Lateral
Other:
TOTAL4 /'
Page2of3
Metropolitan Council
November 10, 2009
VIM 162009
Dale Schoeppner
Building Official
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122
Environmental Services
Dear Mr. Schoeppner:
The Metropolitan Council Environmental Services (MCES) Division has determined SAC for the Central
Park building to be located at 1501 Central Pkwy within the City of Eagan.
This project should be charged 4 SAC Units, as determined below.
SAC Units
Charges:
Park Building
61 f.u. @ 17 f.u./SAC Unit
3.59 or 4
The business information was provided to MCES by the applicant at this time. It is the City's
responsibility to substantiate the business use and size at the time of the final inspection. If there is a
change in use or size, a redetermination will need to be made.
Please keep in mind that on January 1, 2010 our SAC credit rules will change. If you have any questions,
call me at 651-602-1118 or email karon.cappaert@metc.state.mn.us.
Sincerely,
CAA. (IVA /704
Karon Cappaert
SAC Technician
Environmental Services Division
KC:kb: 091110A9
Determination expiration: November 10, 2011
cc: J. Nye, MCES
Peggy Fleck, Eagan
Paul Graham, Eagan (email)
www.metrocouncil.org
390 Robert Street North • St. Paul, MN 55101-1805 • (651) 602-1005 • Fax (651) 602-1477 • TTY (651) 291-0904
An Equal Opportunity Employer
X1 7 303
41,11/ City of kali demo
TO: Scott Peterson, Building Inspections
Peggy Fleck, Community Development
Jon Hohenstein, Community Development
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Wayne Schwanz, Utilities
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 10/29/2009
RE: Plan Review For: Cit roject ('"67
entral Pkwy
Restroom/Pavilion Bldg
The plans are in our plan review section for your review and comment.
# 25
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No
❑ Yes ❑ No
O Yes ❑ No
❑ Yes ❑ No
O Yes 0 No
❑ Yes 0 No
Landscape Security Required Zoning:
Water Quality Dedication Meter Size:
Park Dedication
Trail Dedication
Tree Dedication
PRV Required
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
9a
‘* City of kali MeMo
TO: Scott Peterson, Building Inspections
Peggy Fleck, Community Development
Jon Hohenstein, Community Development
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Wayne Schwanz, Utilities
lectrica sector
FROM: Craig Novaczyk, Senior Building Inspector
DA
RE: Plan Review For: Cit
Central Pkwy
estroom/Pavilion Bldg
1501
# 25
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes D No
D Yes ❑ No
❑ Yes 0 No
O Yes 0 No
O Yes 0 No
❑ Yes 0 No
Landscape Security Required Zoning:
Water Quality Dedication Meter Size:
Park Dedication
Trail Dedication
Tree Dedication
PRV Required
e mai
Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
411,1/
City of Eagan memo
TO: Scott Peterson, Building Inspections
Peggy Fleck, Community Development
Jon Hohenstein, Community Development
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Wayne Schwanz, Utilities
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
FROM:
Craig Novaczyk, Senior Building Inspector
DATE: 10/29/2009
lSO 1
RE: Plan Review For: C. Pr
Central Pkwy
estroom/Pavilion Bldg
The plans are in our plan review section for your review and comment.
# 25
30
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments: 11
5i be r•e./lc l cz,--r 9 Lt / ,[
it t pCs.
re -r ker i c % at C ', tr'a c.t ( 9 - 2 3.
Indicate below any fees that are to be collected with the building permit.
Amount
111 No Landscape Security Required Zoning:
❑ No Water Quality Dedication Meter Size:
O No Park Dedication
❑ Yes
❑ Yes
❑ Yes
❑ Yes
❑ Yes
❑ Yes
O No Trail Dedication
O No Tree Dedication
Eallo PRV Required
Si
nature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
City of Eagan
TO: Scott Peterson, Building Inspections
Peggy Fleck, Community Development
Jon Hohenstein, Community Development
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Wayne Schwanz, Utilities
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 10/29/2009
RE: Plan Review For: Cit Pro'e
Central Pkwy
estroom/Pavilion Bldg
The plans are in our plan review section for your review and comment.
1507
# 25
92
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes 0 No
❑ Yes 0 No
❑ Yes No
❑ Yes ❑ No
Signature
Landscape Security Required Zoning:
Water Quality Dedication Meter Size:
Park Dedication
Trail Dedication
Tree Dedication
PRV Required
il- it -or
Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
i
4 I! ok
CityofEa�au
TO: Scott Peterson, Building Inspections
Peggy Fleck, Community Development
Jon Hohenstein, Community Development
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Wayne Schwanz, Utilities
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 10/29/2009
RE: Plan Review For: /501
Central Pkwy
Restroom/Pavilion Bldg
# 25
q
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
Landscape Security Required Zoning:
Water Quality Dedication Meter Size:
Park Dedication
❑ Yes ❑ ,No
❑ Yes No
❑ Yes No
❑ Yes 0 No
❑ ❑ No
Yep 0 No
Sign -sere
Trail Dedication
Tree Dedication
PRV Req
Date
IV/ 3 /0
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
1,/
City of Evan
TO: Scott Peterson, Building Inspections
Peggy Fleck, Community Development
Jon Hohenstein, Community Development
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Wayne Schwanz, Utilities
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
FROM: Craig Novaczyk, Senior Building Inspector
DATE: 10/29/2009
RE: Plan Review For: Pro'
i ► Central Pkwy
estroom/Pavilion Bldg
f,7
# 25
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required
❑ Yes ❑ No Water Quality Dedication
❑ Yes 0 No Park Dedication
O Yes 0 No Trail Dedication
O Yes 0 No Tree Dedication
O Yes 0 No PRV Required
l
Zoning: ID
Meter Size:
Signature Date •
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
3115
RECEIVED NOV 0 3 2009
1
1
D & S Cement Company, Inc. 8090 Bagley Avenue, Northfield, MN, 55057
Email: dnscement c@earthlink.net Ph. (507) 663-1294 Fax (507) 663-1295
Web: www.DandSCementCompany.com
09/29/2010
To: City of Eagan
Attn: Paul Graham
3501 Coachman Point
Eagan, MN 55155-1810
(567
al Grounds Pavilion
Central Parkway
agan, MN
The concrete columns installed around the pavilion posts were installed per the structural plans. There are
4- # 6 rebar bent into the footing and # 3 ties at 10" tied to the vertical dowels. Sorry for the mix up, with
the anchor bolts already in the footings the guys didn't think about needing an inspection for the piers.
Please call with any questions.
Mick Scofield
D & S Cement Company, Inc.
8091 Bagley Avenue
Northfield, MN 55057
507-663-1294
ENGINEERING
TESTING, IC;
CONSULTANTS
* ENVIRONMENTAL
• GEOTECFI11CAL
• MATERIALS
• FORENSICS
QT7:l3
REPORT OF SOIL DENSITY TESTING
PROJECT:
PARK BUILDING
C Y CONTRACT No. 09-23
ENTRAL PARKWAY
AN, MINNESOTA
507
AET JOB NO: 20-09496
REPORTED TO:
CITY OF EAGAN
3830 PILOT KNOB ROAD
EAGAN, MN 55122
ATTN: 1 w egenerCdlcityofeagan. com
DATE: NOVEMBER 30, 2009
SCOPE
This report concerns the aggregate base compaction and moisture testing we performed for the
referenced project. The scope of work pertinent to this report was specifically limited to the following:
• Perform 4 soil density tests in fill placed below the bike trail and in the park building.
• Perform Standard Proctor tests for each type of soil encountered at our test locations.
• Determine the compaction level at each test location, and compare the results to the compaction
levels required by the project specifications.
• Present the results of our services in a formal report.
All tests were performed in general accordance with the applicable ASTM methods which are indicated
on the attached test data sheets.
TEST. RESULTS
The results of our tests indicate the specified compaction levels were met or exceeded in the fill within
the park building, at the locations and elevations tested.
The result of the test below the bike trail did not satisfy project specifications.
REMARKS,
Our testing was performed on a will -call basis. This level of involvement by AET relies on others to
control the filling and compaction processes used. As such, AET cannot comment on the uniformity of
the lift thicknesses, the material types used, the moisture conditioning of the till, or the compactive
effort used to compact the fill. The tests only provide the compaction and soil type data for the specific
locations and elevations tested.
550 Cleveland Avenue North j t. Paul; MN 551141
Phone 651-659-9001 !Toil Free
Thi n yczm t sh .i
.7. be ,,,protiur.
-972-6364 j Fax 651-559-1379 lwww.amen test.co
tul , rtr}L:)t written apprQ di tT.. trTIWrIC if":EI', neerrfi7 Te
IERICAN
ENGINEERING
TESTING. INC.
REPORT F ENSITY TESTS
CONSULTANTS
• ENVIRONMENTAL
• GEOTECHNICAL
• MATERIALS
• FORENSICS
PROJECT: REPORTED TO:
PARK BUILDING CITY OF EAGAN
CONTRACT NO. 09-23 3830 PILOT KNOB ROAD
ENTRAL PARKWAY EAGAN, MN 55122
GAN, MINNESOTA
(5c1
AET PROJECT NO.: 20-09496
FIELD DENSITY TEST DATA
ATTN: lwegener(cityofeagan.com
DATE: NOVEMBER 25, 2009
Test
Depth
Below Dry Moist:,
Test Test Existing Density Content Proctor Percent
No. late Test a 'on •Depth/ Q,rade (pen (*A) MI. Compaction $pees.
EIev
1 11/10/09 Watermain backfill under bike 3'z* 'IA' 117'.4 10.6 1 89'%** 95
trail; 20E of water valve
11/10/09 Park building pad fill; ION & 96)/2 W 107 4.3`` 2 95 95
15E of SW building corner
11110!09 Park building pad fill; 5'N & 98 '/z' 108 11,7 2 96 95
20E of SW building corner
11/10/09 Park building pad Fill; 15'S & 981A W 111'4 93 2 99 95
10'W of NE building corner
Method: Sand Cone (ASTM D1556, AET #20 -SOI -1) Nuclear (ASTM D2922, AET #20 -SOI -2) 3C
*Depth (f) below subgrade elevation
**Test result below project specifications.
levetand Avenue North 1St. Pa
Frye $04-972-53641'Fax 651-659-137
:'a_pr;d icedexcept in full
arrtonglt:t.corn IAA/EE0
^..an Er ine no Testinr1. {iEr....
g? 3o3
AET Project No. 20-09496 Page 2 of 2
LABORATORY MOISTURE -DENSITY RELATIONS OF SOILS (PROCTOR)
Soil Description
Silty sand with a little gravel, fine to medium grained, brown
(SM)
Sand, mostly medium grained, brown (SP)
Max. Dry
Gravel Test Opt. Moisture Density
Content (%) Method Content (%)
9.8 131.0
16.6 112.8
Procedure & Method: Standard (ASTM D698, AET #20 -SOI -3) X Modified (ASTM DI 557, AET #20 -SOI -4)
To protect the addressee, the public, and ourselves, this report (and all supporting information) is provided for the addressee's own use.
No representations are made to parties other than the addressee.
Reviewed By:
American Engineering Testing, I
Mi ' =el P. McCarthy, PE
Principal Engineer/Division Man
A
AMERICAN
ENGINEERING
TESTING, INC.
November 19, 2009
Eagan Parks
3501 Coachman Point
Eagan, Minnesota 55122
Attn: Mr. Paul Graham
RE: Supplemental Geotechnical Review
Park Service Building
Eagan, Minnesota
AET Project No. 20-09276
Dear Mr. Graham:
CONSULTANTS
• ENVIRONMENTAL
• GEOTECHNICAL
• MATERIALS
• FORENSICS
REVIEWED PLANS MUST
REMAIN ON JOB SITE
1507 C i i'CP#L W l
EAGAN
By. REVIEWED
DATE. II/7iYOIBUILDING IN PEONS DIVISIO
Following our discussion on November 18, 2009, we have prepared this addendum to our
original report dated September 22, 2009 (AET Project No. 20-09276). We are submitting two
copies of this report to you and one copy to J. Andre LaTondresse at JAL Architects.
Project Information
The project consists of a new unheated service building for restrooms and storage. This will be a
single story, slab -on -grade structure of masonry construction. The roof will extend out over
open-air portions and will be supported on the building and exterior columns.
At the time of our original report, the building was planned to be supported on conventional frost
footings. You are now planning to support the building on a thickened -edge slab; the exterior
columns would still extend to below frost depth.
It is our understanding that the building pad area was recently excavated to about 5 feet below
grade and backfilled with imported non frost susceptible sand. Although we performed some
density testing on the new fill, we did not document the excavation oversize. You indicated that
the excavation typically extended about 2 feet outside the perimeter of the building.
Supplemental Recommendations
In our opinion, the building can be supported on a thickened edge slab provided some additional
lateral oversizing is done to replace site soils with non frost susceptible sand. The oversizing
should include stripping/subcutting the existing soil to a depth of at least 5 feet below proposed
finished floor elevation. The lateral zone of stripping/subcutting should be extended horizontally
at least 1 foot from the outside edges of the slab for every foot of fill required below the base of
the slab (1:1 lateral oversize). This lateral oversize should be measured at the base of the
excavation.
550 Cleveland Avenue North 1St. Paul, MN 55114
Phone 651-659-9001 1 Tolt Free 800-972-6364 Fax 651-659-1379 I www.amengtest.com IAA/EEO
This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc.
G
4,111,
"1
Park Service Building
AET Project No. 20-09276
November 19, 2009
Page 2 of 2
We recommend using only granular soil with less than 5% passing the No. 200 sieve and less
than 40% passing the No. 40 sieve as new fill. The building pad fill should be placed in thin lifts,
compacted to at least 95% of the maximum Standard Proctor dry density (ASTM: D698). The fill
should be placed in lifts thin enough to attain the specified compaction level throughout the
entire lift thickness.
We recommend the subcutting be observed by a geotechnical engineer to verify adequate
oversizing. Soil density , testing should also be performed on new fill placed at the site to
document that our recommendations and the specifications for compaction have been satisfied.
We recommend that the ground surface around the building be sloped away from the structures
to promote surface runoff and reduce infiltration into the sand fill. The roof drainage system
should be designed to discharge away from the building.
Limitations
Within the limitations of scope, budget, and schedule, we have endeavored to perform our
services according to generally accepted geotechnical engineering practices at this time and
location. Other than this, no warranty, either express or implied, is intended.
Closure
If you have questions regarding this addendum, please contact us.
Report Prepared by:
American Engineering Testing, Inc.
y P. Brekke, P.E.
Staff Engineer II
MN Lic. #25631
jbrekke@amengtest.com
Report Reviewed by:
American Engineering Testing, Inc.
K `L, R. Anderson, P.E.
ff Engineer II
9303
A
AMERICAN
ENGINEERING
TESTING, INC.
November 20, 2009
Eagan Parks
3501 Coachman Point
Eagan, Minnesota 55122
Attn: Mr. Paul Graham
RE: Supplemental Geotechnical Review
Park Service Building
Eagan, Minnesota
AET Project No. 20-09276
Dear Mr. Graham:
CONSULTANTS
• ENVIRONMENTAL
• GEOTECHNICAL
• MATERIALS
• FORENSICS
You indicated that there was some concern with differential settlement between the columns and
building. For the revised building plans (with the building supported on a thickened -edge slab
over compacted sand fill and the exterior columns at frost depth) we estimate differential
settlement would not exceed "A inch.
We trust this provides you with the information requested. If you have any further questions
regarding our services performed at the site, you can contact me at (651) 789-4645.
Sincerely,
American Engineering Testing, Inc.
id4
Jay P. Brekke, P.E.
Project Engineer
jbrekke@amengtest.com
EAGAN
E61EWED
DATE: --
BUILDING INSPECTIONS DIVISION
REVIEWED PLANS MUST
REMAIN ON JOB SITE
550 Cleveland Avenue North 1St. Paul, MN 55114
Phone 651-659-9001 IToll Free 800-972-6364 IFax 651-659-1379 Iwww.amengtest.com IAA/EEO
This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc.
?IV
9? 303
AET Project No. 20-09496 - Page 2 of 2
Our services for this project have been conducted to those standards considered normal for services of
this type at this time and location. Other than this, no warranty, either express or implied, is intended.
American Engineering Testing, Inc.
Cityofaafl
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
Permit #:
Permit Fee:
Date Received:
Staff:
2010 COMMERCIAL PLUMBING PERMIT APPLICATION
Date: / — /Q Site Address: /50 / (1,6.411#71- Y Q 3/
p
Tenant: �,�A/��P<JL %'.�iP/(' FES'✓"fi L /A F«Y 11`.°4/ Suite #:
PROPERTY
OWNER
Name: err- Otc 6,i 4A/ Phone:
CONTRACTOR
Name: L✓ef'CL"/'/c v7.3( /7468 LLC cense #: (903:5'5.0914
Address: / 7/0 6h069 J ,A0 City: e, 4761,4A/ State: /14Zip: 65/Z
Phone: f e - T/37 Email: C ' c4J &/S' W.°P41,, Co #
TYPE OF
WORK
X New _ Replacement _ Repair _ Rebuild _Modify Space _ Work in R.O.W.
Description of work:
PERMITCOMMERCIA4,
TYPE
-
jr New Construction Modify Space
Irrigation System ( yes / _ no) ( RPZ / _ PVB)
• Rain sensors required on irrigation systems
• Avg. GPM (2" turbo required unless smaller size allowed by Public Works)
Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter.
Domestic: Size & Type — //Z Fire: 1
/
Avg. GPM High demand devices? _Yes _No Flushometers )(Yes _No
COMMERCIAL FEES:
$50.50 Minimum (includes State Surcharge) OR Contract Value $ x 1%
= $ Permit Fee
Required on ALL new buildings and boulevard irrigation systems 3 = $ Radio Meter Read
- If Permit Fee is Tess than $1,000, surcharge is $.50 = $ Meter(s)
- If Permit Fee is > $1,000, surcharge increases by $.50 for each $1,000
$1,000 Permit Fee (i.e. a $1,001-$2,000 Permit Fee requires a $1.00 surcharge). = $ State Surcharge
Following fees apply when installing a new lawn irrigation system. $ Water Permit
Call the City's Engineering Department, (651) 675-5646, for required fee amounts.
$ Treatment Plant
ECIEVS
$ Water Supply & Storage
1 2010
$ State Surcharge
FSP 1 3
AR TOTAL FEES $
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility
damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I
understand this is not a permit, but only an application for a permit, and work is not to start without a per ; that the work will be in accordance with the approved
plan in th se of work which requires a review and approval of plans. -
X ez /V./de/s
Applicants Printed Name
FORK OFFICE USE'
.equired Inspections r
rider Groun• -` ough- nl
pprovec
x
Applicant's Signature
est
Final PRV Required:
Page 1 of 3