Loading...
4162 Arbor Lane          ú ÿ þ þýý  üûûú      ùýý ÿ øúí ðâ÷Û  äððâ  þýö  ýüûúùø÷  ñ  ÷ ôö   ÷  ñ    üé ü  ý  ôüòû óòôüòû ýÛ  ý å  ì ðâó ÿ þòð  òíà÷ýÞõ æêäêä õù  ýü  æêãêã ç ü ê  ôó ö òñ øø   òøüòûÿ  ì ú  ðâóêþÚâ û   ÿ  ôð ÿ  ô àâßðâð  ûù öÿ  ë    øø     é ò     ÿ òøùö  øø ûý  é   ý ü  ùé ÿ ì   ê øø õ òýÿ ü  üùýÿ ü  05/2312014 11:25 Les Jones Roofing, Inc. OAX)9528817009 P.0021016 Use BLUE or BLACK Ink For Office Use 75 1 Permit ! 1 City of Wan I ~7 J~ I Permit Fee: ! / I 3830 Pilot Knob Road I r % I Eagan MN 65122 1 Date Received: / I Phone; (661) 576-5676 I t Fax: (661) 6765694 1 Staff: I 2 ! ~a 2014 RESIDENTIAL BUILDING PERMIT APPLICATION Date: SiteAddress: 4%(o0" 41f.2- "eq--4ttet- A12GOR C"ir Unit Name: o T E Aemas Assoc JE Ana", hone: Io Sl - 4 o-S- T SSC' Address / City/ Zip: 4 C C1o AsBO Q : 1- 4mg i Applicant Is: Owner X Contractor Description of work: Ks-M o vE p Construction Cost: , 79 7. y Multi-Family Building: (Yee x / No Company: sS &&AeS RwFe* /NG. -contact: Gillet sAzwa Zsod Address: 'i f W. 80 7I/ .0- City: BGO`vtcs.t&z.,dZ 4r r State: Zip; XfV20 Phone: q5-A - 76 7 - e78/9 License lead certificate WA1- If O 3 9 a = / If the project Is exempt from lead certificatlon, please explain why: (see Page 3 for additional Information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan Issued a permit for a similar plan based on a master plan? _Yes ___,No If yes, data and address of master plan: Licensed Plumber: Phone: Mechanical Contractor; Phone: Sewer l~ Water Contractor.. Phone: CALL BEFORE YOU DIG. Call Gopher State One Calf at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you Intend to dig to receive locates of underground utilities. www.aooherstateonecsll.oro I hereby acknowledge that this Information Is complete and accurate; that the work will be In conformance with the ordinances and codes of the City of Eagan; that I understand this Is not a permit, but only an application for a permit, end work Is not to start without a permit; that the work wilt be In accordance with the approved plan In the case of work which requires a review and approval of plans. Exterior work authorized by a building permit Issued In accordance with the Minnesota State Building Code must be completed within 180 days of permit Issuance. Applicants Printed Name Applicante Signature Page 1 of 3