2000 Cliff Lake Rd - Structural Steel Special Inspection15 _u SEP23 4 1)1 U M B P# M-0 935 A Structural Steel Special Inspection Final Report Target Store T -0360 Remodel 2000 £-Hff-Road &J 17 L•kk - i Eagan, Minnesota Prepared for Target Property Development Project BL- 10- 05666N September 21, 2010 Braun Intertec Corporation BRAUN BRAUN !NTERTEC Braun Intertec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 September 21, 2010 Project BL- 10- 05666N Mr. Dan Ahrens Target Property Development 50 South 10th Street, Suite 400 TP3 -0710 Minneapolis, Minnesota 55403 -2054 Re: Structural Steel Special Inspection Procedural and Final Report Submittal Target Store T -0360 2000 Cliff Road Eagan, Minnesota Dear Mr. Ahrens: Phone: 952.995.2000 Fax: 952.995.2020 Web: braunintertec.com Please find attached to this procedural report the Structural Steel Special Inspection Final Report for the Target Store T -0360 Remodel and the supporting Special Inspection Daily Reports. Special Inspection and Testing Procedures The special inspection services were periodically provided by International Code Council (ICC) certified special inspectors in accordance with the requirements of the Minnesota State Building Code, Chapter 1700 of the International Building Code (IBC) and the project plans and specifications. The purpose of special inspections is to provide a review of the contractor's work designated by the project structural engineer as needing special inspection under the guidelines of the IBC to determine compliance with the approved construction documents. The special inspector does not have the responsibility or authority to, nor is it the intent of special inspections to have them, judge or modify the construction documents. Only the structural engineer of record can do this. As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize the results of our inspections and testing. A copy of this report was provided to the contractor's site representative for their review and records. As part of this report, items needing correction or discrepancies observed from the approved construction documents were noted. We also summarized the discrepancies documented in a Discrepancy Log. As needed, we also contacted the project structural engineer for additional clarification on specific issues related to the drawings or discrepancies observed. Plans and Specifications The plans and project documents available at the site were used for our inspections. From time to time, we received plan modifications from the structural engineer. When received, these were used to evaluate the work completed in the field. Providing engineering and environmental solutions since 1957 Visual Examination of Field Welds Visual examination of the field welds was conducted in accordance with American Welding Society (AWS) D1.1 -2008, Figure 5.4 and Table 6.1 requirements and the requirements of the project plans and specifications. Drilled in Expansion Anchors Observations were preformed after the installation of the drilled in expansion anchors to determine if they were installed according to the project documents. Items observed included the placement, if the nuts were fully engaged, if the adjoining plies were in contact with one another and if the nuts were snug tight. General In performing its services, Braun Intertec used that level of care and skill ordinarily exercised by reputable members of its profession currently practicing in the same locality. No warranty, express or implied, is made. Thank you for the opportunity to provide the special inspection and testing services for this project. After review of the attached Special Inspection Final Report, if you have any questions or require additional information, please call Troy Baumann at 952.995.2554 or Mary Denne at 952.995.2510. Sincerely, BRAUN INTERTEC CORPORATION / 7 Troy W. Baumann ICC Certified Special Inspector - Structural Steel and Welding Michael M. ` euer, P Vice Presi • ent- Principal Engineer Attachment: Structural Steel Special Inspection Final Report c: David Johnson, PE; Van Sickle Allen & Associates Mr. Dale Schoeppner; City of Eagan Inspections Department Struct Steel Final Rpt Target Property Development Project BL- 10- 05666N September 21, 2010 Page 2 BRAUN INTERTEC BRAUN INTERTEC Structural Steel Special Inspection Final Report City of: Eagan, Minnesota Project: Target Store T -0360 Remodel 2000 Cliff Lake Road Eagan, Minnesota Braun Intertec Project: BL- 10- 05666N Braun Intertec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 Date: September 21, 2010 Attention: Mr. Dan Ahrens Phone: 952.995.2000 Fax: 952.995:2020 Web: braunintertec.com In accordance with the Minnesota State Building Code, Section 1704 of the International Building Code and the agreed upon scope of services, the required special inspections and testing have been provided for the following items: Structural Field Welding. The welded connections detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the project plans and specifications. There are currently no outstanding or unresolved structural welding - related issues. Drilled in Expansion Anchor Bolts. The drilled in expansion anchor connections detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the plans and specifications. Discrepancies were noted and documented. The procedures used by the contractor to install the anchors were not documented by the special inspector as required. The placement was done in accordance with the construction documents, the nuts were fully engaged, the adjoining plies were in contact with one another and the nuts were snug tight. The installation was found acceptable after review by the structural engineer. Conclusion Based upon the inspections conducted and the attached reports, it is our professional judgment that, to the best of our knowledge, the inspected work was performed and completed in accordance with the approved plans, specifications, structural engineer provided modifications and applicable workmanship provisions of the Minnesota State Building Code and the International Building Code. Inspecting Firm: Braun Intertec Corporation I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws.pt the °r, ° ° � State of Minnesota. ti v�i c..OF WI /, 4;1 !! ' 571 euer, P ent- Principal Engineer SSIOItitX ichael M. Vice Presi� License umber: 15571 September 21, 2010 Attachments: Special Inspection Daily Reports 1 through 4 Summary of Special Inspection Discrepancy Log Providing engineering and environmental solutions since 1957 BRAUN INTERTEC Report No.: Project Name: Project Address: Client: Project Manager: Description and location of work completed: List tests performed: Signed: c -\AGAR -0 \ , ct"•v. C1nca win kve S - IJ tr-c Print Full Name: Th,t- T �loo a oa'J CI; Lekko Trtr k City of e'n S CAN" IMtt-V J QQ1nv.0 Date of This Report: Project No.: onV111 Client Project No.: Temp /Weather: Special Inspection Daily Report Sv. -vt,.y Type of Inspection: Inspection Coverage: ❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations 4 1. Periodic a Welding & Bolting ❑ Concrete Placement ❑ Fireproofing ❑ Piles & Piers ❑ Tendon Placement ❑ Soils Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No ❑ Special Cases Nl RRCC\2 Sv,RTort ' t „ R bv.zC G.. - 9,2-C h/( t ‘94 1•-11 t � cty CAAmt,• ' 'v 3 Sk c1/•6.1)•142t 'fib 2 k - • Are there any discrepancies noted from this day's observations? Yes ❑ No � �ti�'�t.� Awn" �ttoc fy • Are there any outstanding discrepancies on this project? Yes ❑ No (°fi 2 � ' X4�:v w. Lh N'1 • If yes, see attached Summary Sheet. Sv�2 fo 1 �,V_a ( O I SQ,,. ? t02 1 - 'L.I.00 t % %4i To the best of our knowledge, work inspected was done i"n accordance with the approved plans, specifica pl M cable workmanship provisions of the current IBC, except as noted above. Date: I.D. No.: White copy to Braun Intertec file. Yellow copy to Project Site Representative. Page of SIDRPT Rev 1 0/09 (L— t• - o�OtGto tug VC S' -&S- S t F S 2_ Providing engineering and environmental solutions since 1957 BRAUN INTERTEC Report No.: Project Name: Project Address: Client: Project Manager: Signed: Print Full Name: City of LQ av\ S S 1�vck, tat, 41eQ T4 50k- T 0 3�� 2.DoO CV:4 LcA.Ite_ Description and location of work completed: Type of Inspection: ❑ Continuous ,RP' Periodic Inspection Coverage: ❑ Masonry Welding & Bolting ❑ Piles & Piers ❑ Rebar Placement ❑ Concrete Placement ❑ Tendon Placement ❑ Foundations ❑ Fireproofing ❑ Soils Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No ❑ ❑ Special Cases cceNt as `!S, x.1,1 < <I y 1 I 7{, 41 List tests performed: R o$ ■\) d`\ v k∎4 /LAW tr-6 rov„ctA ?Lize si S 11L ev use.(. Date of This Report: Project No.: g 00.0 Client Project No.: Temp /Weather: • Are there any discrepancies noted from this day's observations? Yes ❑ • Are there any outstanding discrepancies on this project? Yes ❑ • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was clone in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC, except as noted above. ( Ki( TtM6n._, Date: I.D. No.: Special Inspection Daily Report rrnw..as Celr` a - 9 9 White copy to Braun Intertec file. Yellow copy to Project Site Representative. Page _ of SIDRPT Rev 10/09 C Q- 4. • Providing engineering and environmental solutions since 1957 BRAUN 1 NTE RTEC Report No.: Project Name: Project Address: Client: Project Manager: City of tj. di 3 "</ir c a To36o ,Ro a C1. P[' tdc( kac i Pt 44C /4 Date of This Report: Project No.: Client Project No.: Temp /Weather: Page of SIDRPT Rev 10/09 Special Inspection Daily Report di_ /o•o,s Type of Inspection: ❑ Continuous Periodic Inspection Coverage: ❑ Masonry 2'Weldin & Bolting ❑ Piles & Piers ❑ Rebar Placement ❑ Concrete Placement ❑ Tendon Placement ❑ Foundations ❑ Fireproofing ❑ Soils Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No ❑ ❑ Special Cases Description and location of work completed: /) /C /L6M( ) ti:J6 c1 QWV� jj c JJ n /c ifo -) . L 2 : / ' / ' R 4 1/ ,S IC.0 1 Si C I L.: ICJ !do :J C l c c-1 c i.. r4 j ig it kw: lo if.S C1 EiliC 1 i 9 / J t pit( c jr) L ?J I t. 11. r 1. n of Lo `S 1, m 01 eJ of List tests performed: • Are there any discrepancies noted from this day's observations? Yes No ❑ • Are there any outstanding discrepancies on this project? Yes No ❑ • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC, except as noted above. Signed: Print Full Name: �C Y"►C l (60lc.) k, Wet); t E7rl 4fr('Sfo. n lC e, l . qt// CJc COL) - nn k c_ gel , J c luck b /C t ‘4. Date: I.D. No.: 7 -h.? ' /J rS b .)(Co - 8 t White copy to Braun Intertec file. Yellow copy to Project Site Representative. J /ruz Providing engineering and environmental solutions since 1957 BRAUN I NTE RTEC Report No.: Project Name: Project Address: Client: Weather: List tests performed: Signed: Print Full Name: City of 4t A) Date of This Report: cf' c L �D3 C �? Project No.: JOOD �:►: fp Ld1 L,J Y 4 Description and location of work completed: • Are there any discrepancies noted from this day's observations? • Are there any outstanding discrepancies on this project? • If yes, see attached Summary Sheet. / bfC(; Page _ of SIDRPT Special Inspection Daily Report Client Project No.: Temperature: Type of Inspection: Inspection Coverage: ❑ Continuous ❑ Masonry ❑ Rebar Placement Periodic .0 Welding & Bolting ❑ Concrete Placement ❑ Piles & Piers ❑ Tendon Placement ❑ Foundations ❑ Fireproofing ❑ Soils Did the architect or engineer authorize changes to city approved plans? Yes 7 (Listed Below) No ❑ ❑ Special Cases 4/1,. kfac';citt, //ii: FL,, ) >>, Yes ❑ No Yes ❑ No Date: 2 " r /J I.D. No.: „ j`�C), (:7 J. White copy to Braun Intertec file. Blue copy to Project Site Representative. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC /UBC, except cis noted above. • Providing engineering and environmental solutions since 1957 Daily Report No. Report Date Description Resolution to Discrepancy Date Corrected/ Observed by Status O/C 1 /j t }f n 4 ) -,.) . tf c 2 f / / BRAUN 1 NTE RTEC Summary of Special Inspection Discrepancies Items)eeding C orrrection or Review by the Design Engineer or Architect Project Name. iC /J (L - rt /3t Project Address ,� a l t ' I t Lt /tc C - - � r The following items must be reviewed and approved by the engineer and /or corrected and /or re- inspected before work can continue in the area. White copy to Braun Intertec file. Blue copy to Contractor. Page SODIS Rev 6/04 • Providing engineering and environmental solutions since 1957