3040 Eagandale Pl - MDH Letter 1987-03-24a 0
Lai&
minnesota-departrrent;of health
O 717 s.e, delaware st. p.o, box 9441 ',minnespoils 55440
(612) 623-500
% March 24, 19137
Carlson, M,lorud Architecture Ltd.
c!o Mr.-William
Rova
1000 Shelard Parkway
Minneapolis, Minnesota 55426
Gentlemen/Loies:
IVA.
ire are enclosing a copy of our report covering an examination of plans
and saecifications on the above-designated project. Also enclosed is a .
copy of the report, transmittal letter and plans to be forwarded to the
project tiyaner. IT-IS THE PROJECT OWNER'S RESPONSIBILITY TO RETAIN THE
PLANS AT THE.PROJECT LOCATION.
Your attention is directed to the attached statel". 0 pertaining.to
inspection of the nlumhinq.' It is important that we receive the
information indicated in order that the necessary-inspection may be
made.
If you have any questions in regard to plumbing inswtions.'`please
contact Donald Stanley at 612/823-5328.'
It ybu have any questions in regaarid to the information contained•in.this
report, please contact Milton A. Bellin at 612/673-5517;
Sincerely yours,
Gary L. Englund, P.E.,.Chief :
Section of Rater Supply '
and Engineering
GLE:MRR:gh
Enclosures'
cc: Project Owner.
Mr. William Adams, Plumbing Inspector
an equal opportunliy employer.; - . , - -
MINNESOTA DEPARTMENT OF HEALTH
Division of Environmental Health
REPORT OF PLANS.
Plans and specifications on
Plumbinq for the Residence Inn
Location Eagan, Minnesota Date Examined March 17, 1987
Prepared and submitted by Carlson, Mjorud Architecture Ltd.,
100 Shelard Parkway, Minneapolis MN 55426 Date Received
Ownership -
William Hova
March 3, 1987
Scope - This examination is limited to the design of this particular project only insofar
as the provisions of the Minnesota Plumbing Code, as amended, apply, and does not cover
the water supply or sewerage system to which this plumbing system is connected. The examina-
tion of plans is based upon the supposition that the data on which the design is based are
correct, and that necessary legal authority has been obtained to construct the project.
The responsibility for the design of structural features and the efficiency of equipment
must be taken by the project designer. Approval is contingent upon satisfactory disposition
of any requirements included with this report.
Inspections - Special care should be taken to insure that the material and installation
of the plumbing system are in accordance with the provisions of the Minnesota Plumbing Code.
It is necessary that the State Health Department make roughing-in and final inspections
of the plumbing system to determine whether it complies with the Code. Provisions should
be made for applying an air test at the time of the roughing-in inspection as outlined in
Minn. Rules p. 4715.2820 of the Code. In order to facilitate this work, there is attached
a self-addressed card which should be returned, indicating the name of the plumbing contractor
so that arrangements can be made for the State Health Department to be notified by him as to
the time that the installation will be ready for test and inspections.
No acceptance of the plumbing installation can be given until inspection and test of the
roughing-in work (Minn. Rules p. 4715.2820, subp. 2), finished plumbing (Minn. Rules
p. 4715.2820, subp. 3), and inspection of the completed installation by a representative
of the State Health Department indicates compliance with the provisions of the Code.
Requirements - (OVER)
Authorization for construction in accordance with the approved plans may be withdrawn if
construction is not undertaken within a period of two years. The fact that plans have been
approved does not necessarily mean that recommendations or requirements for change will not
be made at some later time when changed conditions, additional information or advanced
knowledge make improvements necessary.
Milton R. Bellin, P.E.
Public Health Engineer
Section of hater Supply
and Engineering
Requirement: round
the line to the lawn sprinkler system to be
1. Verify the vacuum which is breaker i in installed at least 12 inches above the ground
a pressure type elevation.
NOTE:
laps for the two swimming pools must be submitted for review an
complete plans ool construction.
approval prior to any p
I
I
YFtlMY y??i