Loading...
2225 Liberty Lane( 33_3y 7une 30, 2005 ZTASCA ENGTNTFERZMG, Irrc. P.O. BOX 616 SHAKOPEE, MN 55379-0616 952-445-7993 Mr. Bill Diedrich Diedrich Builders, Inc. 13223 Grand Oak Court Apple Valley, MN 55124 Re: Townhouse Residence,2216 Liberty Lane, Eagan, MN Dear Bill: On May 24", I reviewed the townhouse residence at the above address, and find the following. The header For the double gazage doors was a 6B 16# Light Beam (steel) that provided approximately 10,000 plf support for the floor above. The beam was also laterally suppoRed and encased in '/a " plywood. I consider this proper support fo: the structure above. The ends had adequate support on at least three studs. The transferred load to the footing below would be spread over more than three feet of 20 wide footings which would also give adequate support assuming a minimum soil bearing pressure of 2,000 #s per squaze foot of footing.area. A question of corner bracing was considered. I deterniined the following: • The plywood facing on the beam (above) gave the comer some support. • I recommended that the corner be sheathed with'/a° CDX plywood from the door jamb to the comer and for 18" to 24" on the return wall. This would give the corner adequate support for wind loads. • Considering wind loads, the townhouse gouping of 2 story structures was so close as to negate most side wind loads. In other words, the wind forces will be broken by the adjacent units and construction and will be significantly diminished by the next-door houses. The wind forces against the front face will be taken by the sidewalls of the gazage. X I noticed that similaz situations were found at 221 2225, 2239 and 2243 Liberty Lane. The above considerations would apply to those units as well. Two photos ofthe garage door lintel aze enclosed With this plywood corcectior, the townhouses aze, in my opinion, are adequately supported by the reviewed construction details. THIS IS NOT A GENERIC RECOMMENDATION OR APPROVAL AND DOES NOT APPLY TO ANY OTHER LOCATION QR INSTALLATION. I hereby ceRify that this report has been prepared by me or under my direct supervision and that I am a duly registered Professional Civif Engineer under the laws of the State of Minnesota. If you have any further questions or if I can be of any further assistance, please do not hesitate to phone or write. Sincerely, / h,;:?.?•- ????'?f ?• Y/ Ll,> Lawrence E, 5?m,` stad;?P2F., L? gineer, Minn. Reg. No 6220 Encl: Brief Relquiie?,<'?- ?: _ ?J,;::='°' ? -` ?r???0 T ?1? fl ??u? 15 200? 6 ,3f k4 7une 30, 2005 ZTASCA ENGZNEERII?TG, Irrc. P.O. BOX 616 Mr. Bitl Diedrich Diedrich Builders, Inc. 13223 Grand Oak Court Apple Valley, MN 55124 SHAKOPEE, MN 55379-0616 952-445-7993 Re: Townhouse Residen 216 Liberty Lane, agan, MN Deaz Bill: On May 24'", I reviewed the townhouse residence at the above address, and find the following. The header for the double gazage doors was a 6B 16# Light Beam (steel) that provided approximately 10,000 plf suppoR for the floor above. The beam was also laterally supported and encased in'/< " p(ywood. I consider this proper support fo* the structure above. The ends had adequate support on at least three studs. The uansferred load to the footing below would be spread over more than three feet of 20 wide footings which would also give adequate support assuming a minimum soil bearing pressure of 2,000 #s per square foot of footing.azea. A question of corner bracing was considered. I deterniined the following: • The plywood facing on the beam (above) gave the comer some support. • I recommended that the corner be sheathed with'/<" CDX plywood from the door jamb to the corner and for 18" to 24" on the retum wa1L This would give the comer adequate suppoR for wind loads. • Considering wind foads, the townhouse grouping of 2 story stnictures was so close as to negate most side wind loads. In other words, the wind forces will be broken by the adjacent units and construction and will be significantly diminished by the next-door houses. The wind forces against the front face will be taken by the sidewalls of the garage. y s4 I noticed that similaz situations were found at 2212, 2225, 2239 and 2243 Liberty Lane. The above considerations would apply to those units as well. Two photos of the garage door lintel aze enclosed With this plywood correction, the townhouses aze, in my opinion, aze adequately supported by the reviewed construction details. THIS IS NOT A GENERIC RECOMMENDATION OR APPROVAL AND DOES NOT APPLY TO ANY OTHER LOCATION QR INSTALLATION. I hereby certify that this report has been prepared by me or under my direct supervision and that I am a duly registered Professional Civil Engineer under the laws of the State of Minnesota. If you have any further questions or if I can be of any further assistance, please do not hesitate to phone or write. ? Sincerely> i ` ---- ?' ITAS A •u ?.L'11?'?y ? - I5 Lawrence ki. ` tad?.P?b.> Givil''hg€ Encl: Brief Re?\um?" , Ivfinn. Reg. No. 6220 il ,;UI_ t 5 2 0 0 S January 29, 2007 Mike Maguire MAYOH PaulBakken Peggy Cadson Cyndee Fields Meg Tilley COUNCIL MEMBEHS Thomas Hedges Cm Anwwisrnaroa MUNICIPAL CENTEN 3830 Pilot Knob Road Eagan, MN 55122-1810 657.675.5000 phone 657.675.5012 fax 651.454.8535 TDD MAINTENANCE FACILRV 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.ciryofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community. BILL DIEDRICH DIEDRICH BUILDERS 13320 CEDAR AVE S APPLE VALLEY MN 55124 RE: INCOMPLETE PERMITS AT EAGAN HEIGHTS TOWNHOMES Dear Bill, Enclosed is a list of 10 addresses at Eagan Heights with permits (some over three years old) that have not been finalled, including the inspection record and correction comments. These units are in various stages of completion. We have information alleging that 2220 Liberty Lane has been occupied since December 15, 2006 without passing a final inspection or a temporary Certificate of Occupancy as of that date. This is in violation of the Minnesota State Building Code. A Temporary Certificate of Occupancy was issued on 1/23/07. The residence at 2247 Liberty Lane has no siding on the back side. The gyp sheathing has been exposed to the weather since July 2003. Please provide an affidavit from the gyp sheathing manufacturer stating if the Gyp sheathing is still adequate. The 3 units (4169 - 4177) on Old Sibley Memorial Highway currently do not have valid mechanical permits. Please familiarize yourself with the excerpts from the Minnesota Building Code below and respond accordingly: Minnesota Rules Chapter 1300.0120 Permits Subpart 11 Expiration Every permit issued shall become invalid unless the work authorized by the permit is commenced within 180 days after its issuance, or if the work authorized by the permit is suspended or abandoned for a period of 180 davs after the time the work is commenced. The building official may grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writinq and iustifiable cause demonstrated. I Minnesota Rules Chapter 1300.0130 Construction Documents 5ubpart 9.(C) C. Work regulated by the code shall be installed according to the reviewed construction documents, and anv chanqes made durinp construction that are not in compliance with the approved construction documents shall be resubmitted for aqqroval as an amended set of construction documents. Minnesota Rules 1300.0220 Certificate of Occupancy Subpart 1 Use and Occupancy No building or structure shall be used or occuoied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the building official has issued a certificate of occupancv for the building or structure under this part. Issuance of a certificate of occupancy is not approval of a violation of the code or other ordinances of the municipality. Certificates presuming to give authority to violate or cancel the code or other ordinances of the municipality are not valid. Minnesota Rules 1300.0220 Subpart 6 Temporary Occupancy The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that the portion or portions shall be occupied safely. The Buildinq Official shall set a time period durinq which the temporarvi certificate of occupancv is valid. Minnesota Rules 1300.0140 Violations It is unlawful for any person, firm, or corporation to erect, construct, alter, extend, repair, move, remove, demolish, or occupv anv buildinq, structure, or equipment regulated by the code, or cause any of those actions, in conflict with or in violation of the code. The building official may serve a notice of violation or order on the person responsible for the erection, construction, alteration, extension, repair, moving, removal, demolition, or occupancy of a building or structure in violation of the code, or in violation of a permit or certificate issued under the code. The order shall direct the discontinuance of the illegal action or condition and the abatement of the violation. Minnesota Rules 1300.0150 Violations, Penalty A violation of the code is a misdemeanor under Minnesota Statutes, Section 16B.69. ? Please respond in writin by Februarv 15• 2007 with vour plan for brinqinq these ep rmits into compliance. If you have any questions regarding the above information, please do not hesitate to contact me at 651-675-5680. Sincerely, /? f.%, ? ^l + / ?? r Jeffrey T Wheeler Building Inspector cc: Dale Schoeppner, Chief Building Official MN Department of Labor & Industry, Residential Building Contractors, 443 Lafayette Road N., St. Paul, MN 55155 Sharon Hills, City Attorney Date: O 1/26/2007 PermFRes.rpt Permit# Type Sub Type / Description EA067461 PL Residentia( Water Softener EA067172 BL Single Fam Deck stairs & landing EA063940 SW Residentiai R# 65545 / 6-Plex EA063767 PL Residential 6-Plex EA063766 ME Residential 6-Plex EA063765 BL 01 of _-plex 25% Plan Review / 6-Plex City of Eagan PERMIT FIND RESULTS WorkTypelValuation Issued Final ? r Page: 1 ? Address Replacement 12/20/2004 // 2225 Liberty Lane $ 0.00 Alteration 11/26/2004 2225 Liberry Lane $ 2,000.00 New 04/22l2004 05/24/2004 2225 Liberty Lane $ 0.00 New 04/2112004 10/26l2004 2225 Liberty Lane $ 0.00 New 04/21/2004 10/15/2004 2225 Liberty Lane $ 0.00 New 04/21/2004 // 2225 Liberty Lane $ 104,000.00 . 1 PermAddrlRes.rpt City of Eagan Date: 01/26/2007 ADDRESS INSPECTION RESULTS Address: 2225 Liberty Lane Permit Type Date Inspection Type Inspected By EA063765 BL 07/I S/2005 Final - C.O. Required Jeff Wheeler BL 07/15/2005 Framing Jeff Wheeler BL 11/09/2004 Final - C.O. Required Jeff Wheeler BL 1 I/OS/2004 Final - C.O. Required Jeff Wheeler BL 10/15/2004 Fireplace Final Jeff Wheeler BL 10/15/2004 Final - C.O. Required 7eff Wheeler BL 10/15/2004 Fireplace Air Test Jeff Wheeler BL 09/23/2004 Sheetrock Tom Miklya BL 09/21/2004 Sheetrock Jeff Wheeler BL 09/2012004 Sheetrock 7eff Wheeler BL 09/17/2004 Insulation Terry Zelenka BL 09/17/2004 Fueplace Rough-In Terry Zelenka BL 09/15/2004 Framing Terry Zelenka BL 09/14/2004 Framing Terry Zelenka BL 08/20/2004 Footings Jeff Wheeler BL 05/21/2004 Foundation Jeff Wheeler BL 05/17/2004 Footings Jeff Wheeler BL 05/11/2004 Footings Jeff Wheeler BL 04/22l2004 Footings Jeff Wheeler EA063766 ME 10/15/2004 Gas Service Test Jeff Wheeler ME 10/15/2004 Fina] Ieff Wheeler ME 09/14/2004 Rough In Terry Zelenka EA063767 PL 10/26/2004 Final Scott Peterson PL 10/25/2004 Fina1 Scott Peterson PL 10/14/2004 Final Scott Peterson PL 09/15/2004 Rough In Scott Peterson PL 09/15/2004 Air Test Scott Peterson PL 08/09/2004 Underground Craig Novaczyk EA063940 SW 05/24/2004 Sewer and Water Tim Pahr SW 05/24/2004 Sewer and Water Tim Pahr EA067172 BL 12/17/2004 Footings Tom Miklya Result Comments PAGE Partial InspE see remarks Correction i see remazks Pass Not Ready see remarks Pass Partial Inspc see remarks Pass manometer Pass Partial Inspc see remarks Correction i see remarks Pass Pass Pass Correction t see rem. Pass porch footings - 1 at 12" AND 2 AT 24" Pass see remazks Partial Inspc see remazks Partial Inspa see remarks Partial Inspc see remarks Pass manometer, all gas Pass need ORSAT test, see corrections for bldg fmal Pass Pass Partial Inspc Partial Inspc Only passed manometer test Pass Pass Pass AIR TEST OK TOO Pass San - Sch. 40 thru wall only, grade obvious Water - 1" copper connected to curb box,no apparentleaks Pass Pass / . Date 01/26/2007 Page Permit Inspections Entry Comments Identification: EA063765 - 2225 Liberty Lane Comments: 04/22/04 JTW footings - Partial OK to pour footings for main building - gazage and porch footings not ready 05/11/04 JTW footings - garage footings OK to pour - porch footings not ready - block out missing 36"X36" pad at the west side of the gazage and pour monolitlilc with the matching pad for unit 2229 05/17/04 7TW garage footing OK - still need porch footings 05/21/04 JTW foundation - OK to backfill - still need porch footings 9 14 04 [z framing 1 add squash blocks to footing from girder in master bedroom 2 firestop soffit areas 3 add nuu & washers ro Illook out wall 4 add squash block at ll 6ay window 09/20/04 TI'VJ sheetrock - screw sheets as per the sound channel assembly (6" OC at the horizontal joints and 12" OC in the feild) DONE jtw - provide access to llu wall at the diagonal wall in the 2nd floor bath at the vanity ( lhr wall must be continous behind) 09/21/04 JTW sheetrock - fireblock the lid at the tringle dead space behind the vanity sink in the 2nd floor 6ath ' - lhr wall must be continous at the same location - firecaulk Fire wall penetration at the loose wire in the kitchen - west wall of the garage is not ready - add a gap in the verticat framing at the mech chase in the gazage (cannot be continous from the garage slab to the floor uvsses above) 10/15/04 JTW final CO - Temp CO issued, expires Nov 5,2004 pending the following coaecrions - need plbg final (permanent kitchen sink and master bath) DONE jtw - need Orsat test for the furnace DONE jtw - provide the appliance Balance sheet DONE jtw - install permanem guard rails at the stairs DONE jhv 11/5/04 JTW final - not ready, Temp CO extended 2weeks (Nov 19, 2004) DONE jtw Dare 01/26/2007 page Z Permit Inspections Entry Comments Identification: EA063765 - 2225 Liberty Lane Comments: 07/15/05 JTW framing - new engineering submitted for change in braced wall line at the front of the garage, must be mspected to meet this engineering (see parcel file) - ' 2004 RESIDENTIAL BUILDING PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 FAX # 651-675-5694 New ConsWCtion Reauirements RemodellReoair ReawremenGs 3 registered site surveys showirg sq. ft oi lof, sq. ft o( house, and all roofed areas 2 wpies of plan (20% mazimum lot coverage allowed) 1 set of Energy Cakulations for heeted addNons 2 copies of plan showing beam 8 window sizes; poured found design, etc. 7 site suney for additions & decks 7 set of Eneigy Calculations Addifion - irrdkate ilarske sepfic sysfem 3 copies of Tree Preservation Plan if lot platted after 711193 Rim Joist Oetail Options selection sheet (bldgs with 3 or less units Offce Use Onlv Cert ofSurveyRecd _Y _N Tree Pres Plan Recd _Y _N, Tree Pres Required _ Y_ N On-sile Septic System _ Y_ N Date d / -5, / 0 7 Construction Cost Site Address n2s ?/??y ??L ? UnidSte # Descrip[ion of Wor?? Multi-Family Btdg /f Y _ N Fireplace(s) _ 0 2 Property Owner %iPc-'?/l,( Telephone # ( ) Contractor D jZE??c/? Address / 5"53/7 C/G .??lr4u?E /-"197ff City State /1J/?!'//a'T q>fJ Zip _5-5-,O/v r Telep6one #((PS/ ) 3 2z - G 930 COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING - Minnesota Rules 7670 Cateeorv 1 _ Minnesota Rules 7672 Energy Code Category , Residential Vendlation Category 1 Worksheet • New Energy Code Worksheet (Jsubmissiontype) Submitted Su6mitted • Energy Envelope Calculations Submitted Have you previously constructed a building in Eagan with a similar plan2 _ Y _ N If so, 25% plan review fee applies. Licensed Piumber? Mechanical Contractor Sewer/Water Contractor Telephone #( Telephone #( Telephone #( ! . ?. , ? U N6 V 05 2004 ?gy - I I hereby apply for a Residential Building Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a pernut, but only an application for a pernut, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. ApplicanYs Printed Name ApplicanYs Signature OFFICE USE ONLY Sub Types ? 01 Foundation ? 07 05-plex ? 13 16-plex ? 20 Pooi ? 30 Accessory Bldg ? 02 SF Dwelling ? OS 06-plex ? 16 Fireplace ? 21 Porch (3-sea.) ? 31 6ct. Alt - Multi ? 03 01 of _ plex ? 09 07-plex ? 17 Garage ? 22 Porch/Addn. (4-sea.) ? 33 Ext. Alt - SF ? 04 02-plex ? 10 OS-plex W 18 Deck ? 23 Porch (screen/gazebo) ? 36 Multi Misc. ? OS 03-plex ? 17 10-plex ? 19 Lower Level ? 24 Storm Damage ? 06 04-plex ? 12 12-plex Plbg_Y or _ N ? 25. Miscellaneous work ryPes ?F r"71? L.i--k-77; „q Fl np 5 Dcec,?` ? 31 New ? 35 Int Improvement ? 38 Demolish Interior ? 44 Siding ? 32 Addition ? 36 Move Building ? 42 Demolish Foundation ? 45 Fire Repair ? 33 Alteration ? 37 Demolish 8uilding" ? 43 Reroof ? 46 WindowslDoors ? 34 Replacement •Demolition (Entire 81dg) - Give PCA handout to applicant Valuation Occupancy 1Z ' MCES System Census Code LI 3 Y Zoning ?T City Water SAC Units Stories Booster Pump # of Units Sq. Ft. PRV # of Bldgs Length Fire Sprinklered Type of Const Y N L Width Footings (new bldg) ?fy Foorings (deck) _ Footings(addition) Foundation Drain Tile Roof Ice & Water Final _ Framing _ Fireplace _ R.I. _ Au Test _ Final Insulation . Approved By: Base Fee Surcharge Plan Review MCIES SAC City SAC Utility Connection Charge S&W Permit & Surcharge Treatrnent Plant License Search Copies Other Total REQUIRED INSPECTIONS FinaVC.O. FinaUNo C.O. _ Plumbing HVAC Other _ Pool _ Ftgs _ Air/Gas Tests Final _ Siding _ Stucco _ Stone _ Brick _ Windows _ Retaining Wall Building Inspector ' 2004 RESIDENTIAL PLUMBING PERMIT APPLICATION CITY OF EAGAN 3830 PILOT KNOB ROAD, EAGAN MN 55122 651-675-5675 Please complete for modifications to existing residential dwellings. Date/0 l 0) 3 lC41_ site street ,4ddress aaa. S L; bei w Ln unit # PropertyOwner e Or D OL\1 Telephone# (bla ) 385-f3886 Contrector__ l'?eadowbrooK Ut)aff/ 7elephone# (9S?) Yja-71YSi Address IS78( f-/,q? u Pw O? City qApr. UaIl-P./ State Zip The Applicant is: _ Owner Contractor _Other Alterations to existing dweliing $ 50.00 Add plumbing fixtures. If you are only installing a water softener and/or water heater, the fee is $15.00 plus the state surcharge - see next section. ? _Septic System Abancionment _Water Turnaround (add $121.00 if a 5/8" meter is required) Other: J Water Softener Water Heater _ replacement --14? additional $ 15.00 Lawn Irrigation System _RPZ _PVB _new _repair _rebuild $ 30.00 State Surcharge $ 50 Tatal $ )Jr. Jrv I hereby apply for a Residential Plumbing Permit and acknowledge that the information is complete and accurate; that the work wiil be in conformance with the ordinances and codes of the City of Eagan and the plumbing codes; that I understand this is not a permit, but only an application for a permit, work is not to start without a permit and work will be in accordance with the approved plan in the event a plan is required to be reviewed and approved. ehGao f Rei!g war/ ApplicanYs Printed ame I Applicant's Signature NOV 03 2004 LJ L? J I ? NOW, THEREFORE, it is hereby agreed to and between the Parties hereto as follows: L This Agreement applies only to Lots 5, 8, 9, 10, and 17, Block 2, Eagan Heights 3'a Addition as depicted on Exhibit "A" attached hereto. A full size copy of the Exhibrt ts on file with the City's Community Development Depariment. 2. The herm along Diffley Road is permitted to mcrease by 2 feet in height. 3:-- The porch on I;ot 5 is approved' to increase t6=16 feef-wtde?arid 12-feef deep. A two fobt ?--cantilever can be added to the deck. - 4. The'purCh on Lot 9 is approved to increase to 23 feet wide and 10 feet deep. A two foof ? cantilever can be added to the deckj 5, The.deck.onl.ot 1Q1 s approved for a two foot cantilever 6. The porch on Lot 17 is approved to increase to ZO feet wide and 14 feet deep. A side deck 12 feet wide and 22 faet deep enaroaching into the eommon area is also permitted. An easement shall be subinitted allowing the encroachment. 7. The landscape plan is modified to reflect the Landscape Plan dated June 8, 2004. 8. This Agreement is intended to supplement and amend the rmal Planned Development Agreement covermg the Properly. 9. This Agreement shall be executed and recorded against the Property at Dakota County. 10. This Agceement shall run with the land until [ermmated and shall be binding upon the successors and assigns of the Owner. 11. All other terms and conditions of the Final Planned Developnlent Agreeinent, unless amended by this Agreement, shall remain in fu11 force and effect. a Siteaddress: ;)g? LIL7 L,-- LotL Block? Subd. 1?4cr.,blds On April 15, 2000 the Minnesota Energy Code, Category I Building Requirements for insulation protection, air tightness, and ventilation, was adopted. As a result, the City of Eagan is requiring that the following informatian be submitted prior to issuance of a Certificate of Occupancy. ? This structure: is constructed to meet minimum requirements of the Mn Energy Code, Chapter 7670 OR _ This structure: will be wnstructed W meet more restrictive requirements of Chapters 7672 or 7674 APPLIANCE GAS ELEC 14A MODEL B7U'S 4ENTING TYPE Water Heater I Furnace "10 u G Dryer xp V/ \ f IAJ 1"e I '3S \ ?'?o J' `?-- / EXHAUST SYSTEA9 LOCATION TYPE MODEL CFM's VENTED YEs po Kitchen kitchen m v z Bathroom 1 Bathroom 2 Bathroom 3 )0 Bathroom4 r/ y Other FIREPLACE S LOCATION GAS WOOD MANUFACTURER MODEL BTU'S VENTING OIRECT AiMOS i hereby acknowledge that the above informaGon requirements. SiQnN?turQ ?L RGhE-'5 ( ?, J Company Name is correct and agree to comply with the Minnesoha Energy Code and City of Eagan Date ' This form is the responsibility of the General Contractor. c-c- a-- ?S?W ?c? 3g t-(U z- S`rz>R`I ?TO e ck? c,.?,• ??004 RESIDENTIAL BUII.DING PERMIT APPLICATIO ? ? City OfEagan ?P('3-- (°c;- ' H0 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 FAX # 651-675-5694 p . '?;b New ConsWCfion Reauiremenis RemodeVReoair Reauirements 3 regislered sile surveys showing sq. ft of lot sq. ft of house; and all roofed areas 2 copies of plan (20% maximum bt coverage allaued) 1 set of Energy Calculations for heated add'Nons 2 copies of plan showing beam 8 wfndow sizes; poured found design, etc. 1 site survey for addNOns & dedcs i set of Energy Calculations Addflion -indicafe 'rf on-sife septic system 3 copies of Tree Preservation Plan'rf lat plattetl aRer 711/93 Rim Joist Detail Options selection sheet (bidgs wiN 3 or less unils ._-?- _ I E P?'2? k ?e Date 3k / I \ / Site Address r ? Construction Cost I-,i b?-k,.? Uait/Ste # Description of Work Multi-Family Bldg Y _ N Fireplace(s) _ 0 1 1 _ 2 Property Owner S c --o Telephone #( Contractor P-A Q-,N ' cln ;2>? Address State w ,.n Zip ?3-5?kaR City Telephone#((o?y) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING - Minnesota Rules 7670 Category 1 _ Minnesota Rules 7672 Energy Code Category . Residential Ventllation Category 1 Worksheet • New Energy Code Worksheet (4 su6mission type) Su6mitted Submitled • Enerqy Envelope Calculatlons Submitted Have you previously constructed a building in Eagan with a similar plan? >6 Y _ N If so, 25% plan review fee applies. Licensed Plumber \. I?Le a j Telephone # (lo?aJ ?q Cl - ?1'i ?l ?2. Mechanical Contractor .,J oh\?.Y-5 S ?a ? Telephone #(y?ska? - `7049 Sewer/WaterContractor S?-r Telephone#(q?' UI I hereby apply for a Residenrial Building Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan-and_the-State] of MN Statutes; I understand this is not a permit, but only an application for a pernut, and work is not to start without a pernut; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name ? 4`-- ? ApplicanYs Signature OFFICE USE ONLY Sub Types ? 01 Foundation ? 07 05-plex ? 13 16-plex ? 20 Pool ? 30 Accessary Bldg ? 02 SF Dwelling ? 08 06-plex ? 16 Fireplace ? 21 Porch (3-sea.) ? 31 Ext. Alt - Multi 10 03 01 of 61 plex 0 09 07-plex ? 17 Garage ? 22 Porch/Addn. (4-sea.) ? 33 Ext. Alt - SF ? 04 02-plex ? 10 08-plex ? 18 Deck ? 23 Porch (screen/gazebo) ? 36 Multi Misc. ? OS 03-plex ? 11 10-plex ? 19 Lower Level ? 24 Storm Damage ? 06 04-plex ? 12 12-plex Pibg_v or _ N D 25 Miscellaneous 1:w0jAeS Work Types t 31 New j N ? 35 Int Improvement ? 38 Demalish Interior ? 44 Siding ? 32 Addition ? 36 Move Building ? 42 Demolish Foundation ? 45 Fire Repair ? 33 Alteration ? 37 Demolish Building* ? 43 Reroof ? 46 Windows/Doors ? 34 ReplaCement "Demolition (Entire Bldg) - Give PCA handout to applicant Valuation ? a yI 0 a 0 Occupancy R°3 MCE5 System Census Code /a Z Zoning D_ City Water SAC Units n? Stories ?4_ Booster Pump # of Units o+ Sq. Ft. PRV # of Bldgs O? Length S?- Fire Sprinklered Type of Const 11 ? Width REQUIRED INSPECTIONS ?o Footings (new bldg) K FinaUC.O. ? Footings (deck) _ FinaUNo C.O. Footings (addirion) _ Plumbing ? Foundation _ HVAC ? Drain Tile Other Roof '$e Ice & Water )6 Final _ Pool _ Ftgs _ Air/Gas Tests Final ? Framing _ Siding _ Stucco _ Stone _ Brick ? Fireplace _ R.I. _ Air Test , Final _ Windows Lo Insularion _ Retanilng Wall Approved By: , Buiiding Inspector --------- -------------- -------------------- ------------ --------------- ---------- ----------------------------------- -- --- ------------- BaseFee &?}?pq?F yD0 5?f >6Y??°A?-.) Surcharge S' rn'` la v?-v?- ` L urt1C;r7:SMe,> t 3-7s9•irX?S. o? ^ 2°55; aa Plan Review f Sr P/a o,z 6 9m 59? l??`. X S`i'• og = 3?? G? p? bo MC/ESSAC e?•°4`? F/O°?R 763 I=rn;SN Y??SJftk25.oo_ !??loo;oo City SAC ea m o Utility Connection Charge (?C c?? h 1?4T }Zk'?'? S&W Permit 8 Surcharge Treatment Plant License Search Copies Other Total c MNcheck COMPLIANCE REPORT Minnesota Energy Code MNcheck Software Version 3.0 COiPYTY: Dakota STATE: Minnesota ZONE: 2 CONSTRUCTION TYPE: Multifamily DATE: 3-31-2004 COMPLIANCE: PASSES DEI?RICH BUILDERS CENTER LTN[T TWO STORY Permit # Checked by/Date Required UA = 425 Your Home = 343 19.3% Better Than Code Area or Catity Cont. Glazing/Door Perimeter R-Value R-Value U-Value UA CEILINGS 1080 44.0 0.0 29 WALLS: Rim 402 5.5 2.0 42 WALLS: WoodFrame, 16"O.C. 1882 19.0 2.0 105 BSMT: Conc. 3.5' hV3.0' bg/3.5' insul 109 5.5 0.0 11 BSMT: Conc. 83 h1/8 0' bg/8.3' insul 755 5.5 0.0 57 GLAZING: Windows or poors, Above Grade 180 0300 54 DOORS: 2-8 and 3-0 38 0350 13 DOORS: 9-0 SGD 60 0350 21 FLOORS Over Unconditioned Space 346 30.0 0.0 11 COMPLIAIvCE STATEMEN'T: The proposed building design described here is consistent with the building plans, specificxtions, and other calculations submitted with the permit apptication. The proposed building has been designed to meet the requirements of the Minnesota nergy Code. Builder/Designer Date r, . 1, ? ??IT I=?? mm «mm wm m Na1 ?? ne rxtans rtv w..lE ?? in N SfFr ro?? g?? ?. ii6 Ht? \i 1[ a.C 9d AT Ib' O.G. M19"V ? 9!GC?S?R]Ot 9EA?!G Wt? '.Dt6 m 9Il' TgW% P-4.5 ffi AT Id' O.C. P?t9 finTi ? N 885fAMK HAOC ?9gIIG= SFARti; N1R R.I 14' RBAWt 9-5.5 ` I? A.0 A1 Y4 D.G I[FAM, SLL MiE It%Si6' WA CQ?`F.> IS ?QG?i91 M! PS t81 UMPfK%F '.?. ? AS Si Q]D. l811E Y613 {Bt iL1N .O31S iffi H?1N ` ffi 6/0611?L ? 9'6,V IB0.C. 9?Q1DWF IR A.B. 4T 1'4 C.C B 1iF IG M. OID 9[. mb mC. F16. B3. W 9l4' bBiM% R-5.3 N! ff 6' m.n ne 6. P-! AL TYPICAL WALL SECTION Omb Ai?IlRO.Nt _ O.L. Vf A.& Ai 614 O.L. iT ?. BY ?• m ' Et6 mC. f1C: ? . . 1fFA1m 91 ?iE 6LLID W W{ ? Y-5.5 sL aare wu vurr ?. roff u WON R? R.Vm- Job JiIC Addicss: .-Z? aS ENERGY CODE WO ?SHEET FOR ONE & TWO FAMILY DWELLINGS INS'1'RL'CTIONS: Complctc Pa,ts I, II and iII. Clearly mark plans with: msulation R-valucs; window and skyligh[ U-values; size and hpr of cquipment; equipntcnt controls; and location of interior air barricr, vapor retarder and windwash barricrs. Morc dctailcd iniormauon can be found in the Minnesorn Energy Code Summnry Slreers available Gom the Minnesota Depanmenc of Public Service. Pa r-t L BUILDING ENVELOPE CheCk opUOn USed: ?"Cookbook" Method (complete worksheet below) ? MnCheck metliod (attach repmt) ? Building Component methud (attach calcu]ations) ? Systems Analysis mc[hod (attacli analysis) Ld u:) ' I'ai•t IT. IIEPRESSUR.TZA,TION PR4TECTIpN Chcck op(ion usccC ? Asg,cSiic (compic!c aggrcganc workshcct on ncxt pagc) Cl Pccsc[ipUve (complcic wcrkshcci bdow) Q Perlomiancc (submic mx rcpon prior to final iuspcclion) ? No fu[I buming cquipmcm PRI;SCRIPTIVE PATFT WORKSHEET IVS7'RULTIONI COnffiUStIONEQllYYMENTSCFgDULF PcrtnittedEawemem 5(ep I Cumplete iht Cont6ianar fryu?piu,-n? S"rdialule un Jhc nCht. Srcp 2. Ctuoic a iblrtl?'-up.4irP;:rh wilh a }• (ycs) for all stleclcd cyvipment. Sicp J. Camplcic ihc ciblc bclow for tht AlaAe•uprlmPuri: chasen, mCicaung Ilows ;n :fm Cor c.Nhaust and makc. up av mcthoJ, proposcd. Unly thc capacicy cf (argcst czhaus[ ap, pliancc m cach cucgury nccd bc ronsidcccd. Siep a Fiil aut the Puu,vr binkr.up Aii Oprnmrg Si6rdide on chc ncxt pagc. (thcck all rypcs propostd) Pa!h 0 Pa1h I palh Z pyth ) Spaccheanny O Scalcdcombustion Y Y y y g Dircci or power ven[cd N Y y y O Atrnosphcrically ven[ed i 1 N Y+ y Wa«r h«tlng O Scaled combusrion Y Y Y y Dvcc, ut powcr vcnted N Y Y ? Acmosphcrically venccd N N N Y Hcarlh -6a5 ? $wlcdcombusiion Y Y '{ y Difect ot puwel venlcd iV y y O Atmos hcncaflyvcnt<d N AL ? Y• N Hcar,h- solid ? Closcdcontro llcd N Y Y• ? tucl O Occorativc N N 4'" N I - vniy auc avnospnencauy venua appbance may bc insuUcd m Prescripnve Path'' lJ Pa[h 0- Preacriptive Make-up Air Method Exhausc P3i53vE pusivc roweccd CloLhes drycr: Pusive uttiltraGOO for up co 175 tFms laflUapon Opcrung N!akC-up Pusivc opcniugs for cfrns ovcc I i5 k:itchea cxhaust. Pzssrve inftltraoon for up to 250 cfm Passive openinga for cfms ovet 250 Powered tomalch Ilow for cfms cver 500 Othcr eXheutCt Passive opCnipss for up to 140 cfm Powerea to =cen now ror c5ns uva lao N/n t Necd not incladc ccn=l vzcuurn exhaust'nn Path 0. TOTALS Path 1- Prescriptivc Make-up Air ?l'Tetltod EX1aust Pnssiv,•, pusive Powectd mr,tmiton ? on«ungr Mak-c-uP Quches drJcr.I Passrve ii?('ilearivn for up io 175 cfm Passive oprnmgs forcfsas over 175 '50 /S'C) Kitchea eihausl: Pissive apenipgs for Up l0 250 efm Powcred to match (low for cfms Ovcr 250 N/q OtLer cxhausc j Passivt apcaings COC up to 140 ctm - Powered to mai[h flow for cfrtu ovcr 140 0 -6 N:A ? O 'IOTALS ; I[closcd conaolled comnastion solid-(uel buroine appliance is iasttllcd ia Pith I, thca t6e clotha dr}'cr aod any ccahal v;tcuunt that cxSausts ta outtide must be qrovided a itS make-ap a'v 6y yassive opeuing lo matth (low. OtLenvuc aeed not includc ceutral vacuu¢ ? Path ?- Yrescriptive NIake-up Air Niethod E?JwUSt rassiYe P355tve Poworea Infdtration Opcuing `Sake-up CIoi6cs drycr. Fasscve openuigs for up co 175 c5n Powered ro match f10w for cfms over 175 N/q Kilthen exhausc Powatd to mauh flow N!q N/A OLhcr cxhaust: Pow?arcd to match (1ow N;A N/A TOTALS N/A O Path 3- Prescriptive Nlake-up Air Nlethod Ext?ause Pas:t,•c Pusive Powcrcd larlhation Opening Make-up ClotUcs dryer. Powcred to match flow N/.4 N/A Kdchen cxhausr. Powered to mateh flow• N/A NrA O(ha exhausr. Powered ro match (lou• Nin N/A 70TACS N/q N/A "- ' Pa:rt IIIa. VENTILATXON 1NSrxucrions VENT [LATION METHOAS '- MAICE•UYAIR PATH (from Part II) PEOPLE SUPPLEMENTAL CO Ai,,?kf.t Q PrcxcripOv.- (or Aggrcgacc) Path 0 Balaoccd or ExLaust only Baluiced or Exh¢ust nnly" Not requircd ' Pcescnpuve (or Aggregatc) Psth L a1lDted ' al?nec r 61dt6tu/-ertf}r Not requtrcdl' Q Prucnptive (ur AFgrcgaec) Path 2 Ba anced Bala¢ctd ar Exhaust ?n17r ftequucC ? Prcscnpnve (or Aggrceatc) Path 3 Balarced Balaaced Kequi;cd O P<rfornwnce Path (scc patt 7672 1000 subpan i) Pn'formante PedO[ma¢ee ReyuueC • Pusive iufilnatiun shall noe be uscd ro provide ma;:e-up air fot nciiaust only sjipplemcuul venlilati0n ia exa;s e f O.OS clmisf Y A eaibon monoxide alum muse bc instiUcd if a cootrollcd combus-non solid-Cuel buming appliance is insiatled in Path 1. VE[YTTT,ATION FAiN SCHEDULE Fan descnpuon o[ locatiOn TOTAI,S Fm Pwpose ? Pcople Cl People a Ptoplc 0 Pcopk efm ? Supplcmenw] O Supplemen:al G Supplcmenial a$uppicmenta' efm VENTILATION [ntske 2 eL7 cfm cfm cfm cfm ci"m AS DESIGNrED Exhausc ' Z,pa •cFm cEm cfm rCm clm Statement af Compltance: Thc proposed budding design rcpreseneed m thcse documrnts is consatcne wiih ihe building plans. Speafiealior.A and uehcr talCUlauons subntitted?viN tht per[nit applicati0n. Thc proposed bwlding }ws been dcsigncd to meeL ihc «qvircmems of the NLnnesnla Energy Codt.,-? 6?'"--• ??`-•-'?, .;?L/-O Y Applitanl(prmtnamc) Si naNte_?< Aqt,..Z,¢ Dn?c 7elrphone numbcr Part IIIb. VENT7LATYON (Submit Part IIIU upun compietion u(bvst.uz verificatiorl) X ------------------------------------------------------------- -------- 1ub Sitt Addrtss Pemiu?iuip6er Fan dacripdoa.or locauon ; TOTALS MLASURED ' lnuke• dm cim c(m clm tfrn P[RFORt.LANCE EthausN cfm c(m cGn cfm ctm 'Measuccmcnc requaed For venulanon system iatalces and c.ihausts from ehe buddmg wicit deslgn air t ow oC 30 cim'and prcamr. Complfance St31ement: Lutallyd vrnnlanon systertt i3 in compiiohte wiih 'N1N Entrsy COde and i5 iizcd to providc Ihc Jcsicr. av (lun. ? Apphcanc (prini name) Si;naNrc Doce Trlcphonc numbcr Slep I. Compfcu thc Vrntilatrort Qunnliry workshcct bclow. Sltp 2. Check'Ihe Make•up Air Path (Crom Pati IO on Ille Vpnrrlanan ,tilatGoalr cablc below, Skp 3. Choosc permintd meihod(s) Cor Pcaplc and Supplemtn[al Ventdanon (rom lhc Vrnrrlariun McrGadr iable. Sitp 4. Compktc thc Ycnrilation Pun Sclicdufe. _ -? - PASSYVE MAKE-UP AIR OPENTNG SCHEDULE 4'1?15 'CADLE FOR SIZINC PASSIVE MAKE-UP A]R OPENTNCS -?7ot?+: a) This tihlc usumes 20 &et ofsmooth unobstructed round Diametcr 3 inchcs Path 0 50 cfm Path I 35 ef Path 2 I; cLn ducc witS thscc 90' elbows and a screened Sood 4,nehn 90 efrr, ti0 eCm 30 cfm b) cquivalent desib-ns cakulatcd using prasutes oFSD PascaLs 5 mches l4U ci? t00 cfm GS drn for Pafh 0, ZS Pascals Cor Path I, ana 3 pucals for Path 2 6 iachcs 200 cfm 140 cfm 63 cfm may hc uscd. 7 inches 270 cfm i 90 chn BS cfm c) If a make-up av op<ning is used with no duct or elboa•s, tl:e 8 inches 350 cfm 150 cfm 1 10 cfin dia.meter can be decreased by t iach. • 9 incbes 450 c4n •720 cfrn 140 cfm d) If flex duct is uscd, inacasc diunclc[ by 1 inch. 1D inches 576 cfm 400 ctin (80 cfm Mak'c-upAirApploeatiadLocaaan CFtvT eningsiu DuctType ' 5mooth ? Fles O Qprn:n-1 or,1y Smuath Fltx ?) Opemng only ? Smooth ? Flcx Openine only ? Smooth ? Flcx Ll Openine only AGGR.LGATE MAI{E-UP AIR WOIt2tSHECT INSTRUCrIONJ Siep 1. Complett E.rhium Se6r<h+lr on Ihe right inQ;w[ing efm of largest dcviee in eaell cotegory. Slep 2. Complctc ihe Can6ustinn £rr+pmwnt Sdiedul. on prcccding page. Step ). Chuosca paih wiih a Y(Yes) (or ail selc=d cquipmem. Stcp 6. Complete Aagregnrr Make-up rfir tablc bclow Inr chosen path. U3ing cht cotal cfm Gom thc E'.xbuini Sdhed44e, indicate (low in cLn for propused nuibod(s) of providin; make-up air. $eep 5 Fdl outahc Pmsirc• iLlane-np Arr Opc'ni+rg Schedu(c above. EICHAUST SCHEDULE DEVIC£ CFM CI0(bG5 dryCY ? Kitchen exhaust Othar e:chaust O TOTAL 0&pp ? Path 0- Aagregatc Make-up Air Niettiod ?uS1?C Pzss«•e Powaee 1?lrraaort Openine Make-up Pusive mfLltneon for up to 425 cfrn Pusive opcaings [ot c6ns ovu 425 poweced lo match (low for cfrns oveT 985 Path 1- Aggregate Make-up Air Method PasSive a=cvc Powcrcd I I?ltratio•i ? OprninF T4ake-up Passive iafiltranon up to 175 cfm• ' Pataivc opaaittgs for cfms ova 175 ' /J ?/? Powered ro matth flow for tffis ova SGS • If a closed ccnaoltcd solid-&ei burning appLaoec is iustaUed w Paih 1, tDen a passive opening muse bc usjailed to pro.•ide makaup ait for the clafhes dryer md for any ceuRal vacuutn thlt exhauses to the autside. Cl Paih 2-Aggregate Nlake-up Air Method Pas:ivc Passive Powuca lnfiltrnlion Openmg MOke-up Psssivc opciungsi for up ia 175 ctiti Powercd to mateh QoW for cfms over 175 NIA ? Path 3-Aggre ate Make-up Air Method ' pas:we pzssiYc Ynwcrcd g infiltrotion Opcninb Make-up Poweced to matib 17oµ I Nin ? N/A 2a 13, ~a t :2a a 12aaS t 22-2q, 2231 L; b VRJA,.t Use BLUE or BLACK Ink For Of c Use--------- I I j Permit #z City j of Eajan I Permit Fee: 3830 Pilot Knob Road Eagan MN 55122 j Date Received: j Phone: (651) 675.5675 I I Staff: Fax: (661) 676-6694 2013 RESIDENTIAL BUI DING PERMIT APPLICATION 29-.2 R 2a c'1 .z221 ~2 ~3 Ahn 1'a &4111 Date: Site Address: Unit Name: Phone: Address / City /Zip: , 1 ~t `N r ;iljI.1;:;. ~:ia~5:'•:51:::gjy.".(li!i;'.j 7;'. '^;'.,:i,i:' : ;i.:•; " : ii Applicant is: Owner Contractor AescmptionOfwork: p}Construction Cost Multi-Family Building: (Y e/ No r Company: Contact: P_ At U Address: 2~z City: & 3a +ii•; state: M ' Zip: r~l Phone: AA cate License Lead Certir If the project is exempt from lead Csrtlficatlon, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes _No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer S Water Contractor: Phone: d"sa rtfffI~loc.martttYSiu;sltiit,:~iie!-coiisisifered'toPv'.c::r... orma...on:;o:ts.,¢; AR.................... . tMs' rir dtrhalr ►ri:n~ b':.cYas r> *.d as,;aon- .u~t111e:Jf u' d ..f: ff c: x opts=tNet w /al:: tti~:: / .:;ro : Y . p...... , . . CALL BEFORE YOU DIG. Call Gopher State One Call at (661) 4640002 for protection against underground utility damage. Can 48 hours before you intend to dig to receive locates of underground utilities. www.oopherstateonecall.ora I hereby acknowledge that this Information Is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that 1 understand this is not a permit but only an application for a permit, and work is not to start without a permit; that the work will be In accordance with the approved plan in the case of work which requires a review and approval of plans. Exterlor work authorized bye building permit Issued in accordance with the Minnesota State B ilding Code must be completed within 180 daysof ermit' suance_ ` x v L G x Ap lican s Printed Name Applicant's Signature Page 1 of 3 *City of Etan 3830 Pilot Knob Road Eagan MN 66122 Phone: (651) 675.5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use Permit#: o°�°15 44 OQ Permit Fee: i y Date Received:: ( 4 -i ) I 4f - Staff: (SID 7L J 2014 RESIDENTIAL BUILDING PERMIT APPLICATION Date: 3-'3 I `c` Site Address: a` ) 1� )(\ ) Unit #: aQ a� ,.. E 'Re&i;de;r tl ; ' ..:.Owned ^ ::::. :::, ^i ;;' ; i'.>;>,' Name: /_ieA%% t •&'t. t Phone; 1.61— (_0b4-4 6S9 1, Address / City / Zip: • •�% \ V 11_ ` is �_ , 1 d'• Il Applicant is: Owner Contractor 1' 1 '.:'.L , i i '�';is ' ' ' ` Description of work-: V . ` i 0/1/4-9—j Construction Cost I Multi -Family Building: (Yes / No ;iii.;`� , C �,,G%rQ�',' , ... i' . ,i,; Company: 1 JV t\U\q_KS Contact: Vim. Address: O'' 'ROM�,Q-t C SA—. City: .7 l�lkV \ State: Zip: jl Phone: VS��� , .05\---(9.,%.Q.:".`u License #: ''')C-.06CVA LA Lead Certificate #: NT.I.'f 409\\--i ✓ 1 If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) In the last 12 months, _Yes _No If COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING has the City of Eagan issued a permit for a similar plan based on a master plan? yes, date and address of master plan: Licensed Plumber: Mechanical Contractor: Sewer & Water Contractor: Phone: Phone: Phone: ::i.14107.4,;„,; �.. � lIkP�fr.'a•s �. %�re.���. ,� t:Y•,o#.-�.p.:.r:u�:.;lc;•�'.;if...trt.. iafior:i Portions 0.CRMI:Ll';.0.0.i.• .... :; ,�-I►r:a��:..'-^, _, IF,.�..,>0.::.:.R.:.:.:RVn9.'Y,..V00 i' of ' 00 on.andY46C�as3ds:�onA.ft.ai/f; �u�4►✓� de;,0* „ aos.,aou>pri�e L� ia :H.!..!,;,L;.J,,,.,..I..:..:."„; .,,...clud'i.lt u6ibe:'b.��,':-'o'.•.E.,.� > i: (, : CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage, Call 48 hours before you intend to dig to receive locates of underground utilities. www.00nherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be In conformance with the ordinances end codes of the City of Eagan: that I understand this Is not a permit, but only an application for a permit, and work is not to start without a permit: that the work will be in accordance with the approved plan In the case of work which requires a review and approval of plans. Exterior work authorized by a building permit Issued In accordance with the Minnesota State if (ding Code must be completed within 180 day of permit Isw,uanc Applicant's Printed Name x Applican s Signature Page 1 of 3 r - Use BLUE or BLACKl nk I �� For Office Use t� 4111,11 L/ 9 S .j Clt Of Eapli11 Permit#: / /RECEIVED Permit Fee: 70 C 3830 Pilot Knob Road %_ , / Eagan MN 55122 JAN S 2Q17 Date Received: 7 Phone:(651)675-5675 Fax:(651)675-5694 Staff: V J 2017 RESIDENTIAL BUILDING PERMIT APPLICATION Date: �ji♦ Site Address:7J76— Lari r/ 4616441Unit#: Name:Aceu.t'( i O 4* Phone:oitZ"' 948.72zZ Resident Owner Address/City/Zip: 1'7-'1.51'7-'1.5 L,Z61,77 t Applicant is: Owner Contractor CkiVinCtt a '' 1 D 39/5 Type of Work Description of work: A _ /ia5 Riot Construction Cost:/.5, 436, Multi-Family Building: (Yes /No M' ) 1. drE Company: E/c.L eh►4 (0 M ntact: Alt:1447y Q,4 ►i ) Contractor Address:?ZOS'inritiE.Cotaks Ste City: j11160111•11/ State:4Zip:SSW Phone rairEmail:4.44Sfae_S ,,/�eql'� License#:MN 12 I Lead Certificate# y/ / �`_G,As1• C,A', If the project is exempt from lead certification, please explain why: COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months,has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No If yes,date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer&Water Contractor: Phone: Fire Suppression Contractor: Phone: NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will b(111/In conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit is x , -�4 CMs A lica Printed Name App cant's Signature Page 1 of 3 iLe. -T -iDO NOT WRITE BELOW THIS LINE / L/O SUB TYPES _ Foundation — Fireplace _ Porch (3-Season) _ Exterior Alteration(Single Family) V Single Family _ Garage Porch(4-Season) _ Exterior Alteration(Multi) _/"' Multi _ Deck Porch(Screen/Gazebo/Pergola) Miscellaneous 01 of Plex Lower Level Pool Accessory Building WORK TYPES New — Interior Improvement _ Siding _ Demolish Building* Addition _ Move Building _ Reroof _ Demolish Interior Alteration Fire Repair Windows Demolish Foundation _ Replace _ Repair _ Egress Window Water Damage Retaining Wall *Demolition of entire building give PCA handout to applicant DESCRIPTION Valuation l 1 1 tii i 0 Occupancy ( "r, MCES System Plan Review Code Edition roo 1'0 t Cr. SAC Units (25%_ 100% Ni(„) Zoning 00 City Water Census Code V Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Suppression Required Type of Construction Width REQUIRED INSPECTIONS Footings (New Building) Meter Size: Footings (Deck) Final/C.O. Required Footings (Addition) )( Final/No C.O. Required Foundation Foundation Before Backfill HVAC_Gas Service Test Gas Line Air Test Roof: Ice &Water Final Pool:_Footings Air/Gas Tests _Final Framing 30 Minutes 1 Hour Drain Tile Fireplace:_Rough In Air Test Final Siding:_Stucco Lath _Stone Lath _Brick_EFIS 7 Insulation Windows Sheathing Retaining Wall:_Footings_ Backfill Final Sheetrock Radon Control Fire Walls Fire Suppression:_Rough In Final Braced Walls Erosion Control Shower Pan Other: Reviewed By: 1 , Building Inspector RESIDENTIAL FEES Base Feel ; Surcharge ./IN/Y1146 A451; Plan Review �j MCES SAC f City SAC Utility Connection Charge S&W Permit&Surcharge /// 0 (-) 06 Treatment Plant / Copies TOTAL Page 2 of 3